Source-backed project record · OH

Apollo Power Generation Facility

This canonical record consolidates 3 source-backed observations without discarding aliases, limitations or unresolved dimensions.

approved_or_permittedproject status
VERIFIED_PRIMARYbest evidence tier
3linked evidence rows
Project facts

Location and operating record

Operator / developerWill-Power OH LLC (Williams Companies, Inc. affiliate)
JurisdictionWood County, OH
AddressNot published
Location precisionlocality
Coordinatesnull, null
Capacity350 MW
AliasesApollo Power Generation Facility
Evidence coverage

What has been researched

Project profile2 rows
Intent / permits1 rows
Civic / infrastructure0 rows
OWNERSHIP CHAIN / OPERATOR

Apollo Power Generation Facility: ownership chain / operator

VERIFIED_PRIMARY

The applicant of record is Will-Power OH LLC, the Williams Companies power affiliate that also holds Socrates North/South, STY and Neo in Ohio.

Key data: Will-Power OH LLC (Williams Companies, Inc. affiliate)

Limitation: Williams parentage confirmed via the Socrates GEM record and Williams fact sheet rather than the Apollo notice itself.

Open source →

POWER SUPPLIER (generation siting)

Apollo Power Generation Facility: power supplier (generation siting)

VERIFIED_PRIMARY

The Ohio Power Siting Board approved the 350 MW Apollo facility on February 3, 2026; it is a behind-the-meter generator, with the air permit holder being Will-Power OH LLC.

Key data: OPSB approval Feb 3, 2026; 350 MW

Limitation: Generation interconnection queue number not located.

Open source →

OTHER (state siting-board approval of behind-the-meter generation dedicated to a data center load)

Apollo Power Generation Facility: other (state siting-board approval of behind-the-meter generation dedicated to a data center load)

"approved the construction"; OPSB case table lists it under "Approved Behind-The-Meter Gas Generation and CHP Facilities"

Key data: 350 MW natural gas + approximately 120 MW battery energy storage

Status date: February 3, 2026

Limitation: Two different case-number formats appear across the two official sources; both are reproduced. The data center itself (widely reported as Meta) is not named in these records — only "Liames, LLC".

Open source →

Sources

Evidence and provenance

  • Ohio EPA · VERIFIED PRIMARY
    Limitation: Williams parentage confirmed via the Socrates GEM record and Williams fact sheet rather than the Apollo notice itself.
  • Ohio Power Siting Board / PUCO · VERIFIED PRIMARY
    Limitation: Generation interconnection queue number not located.
  • Public Utilities Commission of Ohio / Ohio Power Siting Board · VERIFIED PRIMARY
    Limitation: Two different case-number formats appear across the two official sources; both are reproduced. The data center itself (widely reported as Meta) is not named in these records — only "Liames, LLC".

Open OH state research →

Apollo Power Generation Facility Data Center Project | Wood County | Compute Equity Atlas