Aspen Creek Digital Olathe bitcoin mining data center

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
SOURCE_BACKEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerAspen Creek Digital Corporation (ACDC)
JurisdictionOlathe, CO
AddressNot published
Location precisionlocality centroid
Coordinates38.608531, -107.983278
Capacity6 MW
AliasesAspen Creek Digital Olathe bitcoin mining data center
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Aspen Creek Digital Olathe bitcoin mining data center: source record

operational

DataCenterDynamics reports a 6 MW bitcoin mining data center colocated behind the meter with a 10 MW solar farm on two parcels totaling 74 acres in Montrose County, with local reports placing the solar farm in Olathe. Street address not published; no utility interconnection details verified. Montrose County adopted a six-month data center application moratorium effective July 1, 2026 (Resolution 23-2026).

Key data: Behind-the-meter colocation with an on-site 10 MW solar farm

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

OWNERSHIP AND PROFILE

Aspen Creek Digital Olathe bitcoin mining data center: ownership and profile

operational

Developer: Aspen Creek Digital Corporation | Owner: Aspen Creek Digital Corporation | County: Montrose County | Research region: Western Colorado / Western Slope

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

POWER AND GRID

Aspen Creek Digital Olathe bitcoin mining data center: power and grid

operational

Key data: Utility: Behind-the-meter colocation with an on-site 10 MW solar farm | Gross MW: 6 | Onsite generation MW: 10

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

WATER AND COOLING

Aspen Creek Digital Olathe bitcoin mining data center: water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

PERMITS AND JURISDICTION

Aspen Creek Digital Olathe bitcoin mining data center: permits and jurisdiction

operational

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

ENVIRONMENT AND SITE

Aspen Creek Digital Olathe bitcoin mining data center: environment and site

operational

Site of a former Louisiana Pacific lumber mill that closed in 2002

Claim classification: Not yet assigned

Status date: 2026-09-14

Open source 1

operational

colocated behind the meter with a 10 MW solar farm

Claim classification: Not yet assigned

Status date: 2026-09-14