Evidence record
August 2026 operator report confirms Clarington development and ongoing design/preparation. Power availability and construction timing remain uncertain; planned utility capacity does not establish an operating campus. Use proposed/review lifecycle rather than copying archived construction status.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.