Evidence record
August 2026 operator report identifies operating crypto campus at Massillon, with separate expansion and reconstruction still pending. One campus is admitted; fire-damaged building reconstruction is not a second facility. Electrical capacity is not imported as IT load; no independently bound exact street.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.