Evidence record
Current operator site and linked technical sheet establish the distinct RNO2 development at 265 Keystone, with capacity still described as to be delivered in Q4 2026. Completion is not inferred from the calendar. The abbreviated address lacks a fully verified street binding, so no map point is admitted; area and power figures are not imported.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.