Compute Equity Atlas
← National map
Source-backed project record · TX

CoreSite DA1

This record consolidates 1 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
1linked evidence rows
Project facts

Location and operating record

Operator / developerCoreSite
JurisdictionIrving, TX
Address2701 E Grauwyler Road
Location precisionCensus address-range interpolation; not rooftop or surveyed coordinates
Coordinates32.830765340562, -96.905498913954
CapacityNot established
AliasesNone retained
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
REVIEWED PROJECT UPDATES

CoreSite DA1: reviewed project updates

Source observation

The Texas register identifies CoreSite DA1 at 2701 East Grauwyler Road in Irving as a proposed two-story data center.

Key data: TABS2026029194; registered August 31, 2026; scheduled January 2027 to December 2028; 230,000 square feet in the filing.

Claim classification: Attributed source observation · Verification: Listed fields reviewed; not a site inspection · Retrieved: 2026-10-03

Status date: 2026-08-31

Limitation: A future schedule is not evidence that construction has begun.

Open source 1 →

Sources

Evidence and provenance

  • tdlr.texas.gov ↗ · Retrieved 2026-10-03 · SOURCE BACKED
    Limitation: A future schedule is not evidence that construction has begun.
  • US Census Bureau ↗ · Retrieved 2026-10-03 · ADDRESS RANGE INTERPOLATION
    Limitation: Address-range interpolation does not establish a rooftop, parcel boundary or independent facility verification.

Open TX state research →

CoreSite DA1 Data Center Project | Irving | Compute Equity Atlas