under_construction
Claim classification: Not yet assigned
This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.
| Operator / developer | CoreSite |
|---|---|
| Jurisdiction | CO |
| Address | 4900 Race Street |
| Location precision | Census address-range interpolation; not rooftop or surveyed coordinates |
| Coordinates | 39.785256104963, -104.963415884781 |
| Capacity | 18 MW |
| Aliases | CoreSite Elyria-Swansea DE3 |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
Claim classification: Not yet assigned
CoreSite identifies DE3 at 4900 Race Street. Its construction update reports generator testing and commissioning in June 2026 while the facility page continues to describe DE3 as coming soon.
Key data: The first building's 18 critical MW and broader campus's 60 critical MW describe different design scopes.
Claim classification: Attributed source observation · Verification: Listed fields reviewed; not a site inspection · Retrieved: 2026-10-03
Status date: 2026-06
Limitation: Commissioning and scheduled opening dates are not actual operation.
Claim classification: Not yet assigned
Key data: Gross MW: 18
Claim classification: Not yet assigned
Claim classification: Not yet assigned
Claim classification: Not yet assigned