Source observation
Edged reported that its second Chicago-campus building at 2835 Bilter Road had topped out. The same announcement states that the first campus building opened in February 2025.
Key data: One campus retains the operating first-building milestone and the second building's construction milestone. The second building's 72 MW design and Q2 2027 opening target are not current operating load.
Claim classification: Attributed source observation · Verification: Listed fields reviewed; not a site inspection · Retrieved: 2026-10-03
Status date: 2026-06-04
Limitation: The address pin locates the second building, not the entire campus boundary.