Compute Equity Atlas
← National map
Illinois / IL

Illinois data center and compute infrastructure map

Start with the state view and mapped project locations, then move into permits, planning, civic context, operators and source evidence. Only locations supported by explicit coordinates are plotted.

0mapped locations
84deep evidence rows
4validated refresh rows
Animated state view

Illinois

True aspect · centered · uncropped
Evidence-backed project locations

Illinois project points

Only records with explicit published coordinates are plotted here. Missing coordinates remain visible in the evidence sections rather than being guessed.

0 mapped locations
No project in this state currently has coordinates strong enough to plot. The state evidence below remains available while location proof is compiled.
ProjectsIntent signalsCivic impactProject profilesInfrastructureSources & gaps
Current development signals

Permits, filings, zoning and other activity

9 source-backed evidence rows are integrated on this page.

"Stream ORD" new data center, 2000 Landmeier Road, Elk Grove Village

Cook County / Elk Grove Village

Developer / operator: Stream (facility named "Stream ORD" in the filing)

Status: "is applying for a Construction Permit to construct a new data center"; "The Illinois EPA (IEPA) Bureau of Air (BOA) is reviewing the application"

Permit / docket: Illinois EPA BOA ID# 031440AWO; Construction Permit Application 25120023

Record type: Air construction permit (Bureau of Air)

Capacity / size: 126 diesel emergency generators at 2.5 MW each

VERIFIED PRIMARY

Limitation: No date, total MW, or square footage in the letter. Application number prefix (2512) implies a December 2025 receipt but the letter does not say so.

Open source →

EdgeConneX new data center "CHI04", 901 Busse Road, Elk Grove Village

Cook County / Elk Grove Village

Developer / operator: EdgeConneX

Status: "is applying for a Construction Permit for new data center (CHI04)"; "The Illinois EPA (IEPA) Bureau of Air (BOA) is reviewing the application"

Permit / docket: Illinois EPA BOA ID# 031440AYG; Construction Permit Application 26020027

Record type: Air construction permit (Bureau of Air)

Capacity / size: Eleven new diesel emergency generators, 3,000 kW (4,393 hp) each

VERIFIED PRIMARY

Limitation: Status date not stated inside the PDF itself.

Open source →

CyrusOne LLC, 2905 E. Diehl Road, Aurora, IL 60502

Aurora (Kane/DuPage)

Developer / operator: CyrusOne LLC

Status: Illinois EPA "made a preliminary determination that the application meets the standards for issuance and prepared a draft permit for public review"; final decision pending public comment

Permit / docket: n.a. (permit number not stated in the notice)

Record type: Clean Air Act Permit Program (CAAPP) operating permit — draft

Capacity / size: 91 diesel-fired emergency generators

VERIFIED PRIMARY

Limitation: The public notice omits the CAAPP permit number; MW/sq ft not stated.

Open source →

Joliet Technology Center Subdivision — ~795-acre data center campus surrounding S. Rowell Road and Bernhard Road

Will County / Joliet

Developer / operator: n.a. in the city record (not named in ordinance file 179-26)

Status: File status "Passed"; action "adopt"; result "Pass" (Plan Commission special meeting/public hearing March 5, 2026 recommended approval)

Permit / docket: File #179-26; applications A-4-25 (annexation) and PUD-8-25 (preliminary PUD)

Record type: Ordinance: annexation, classification to I-1 (Light Industrial) zoning, preliminary planned unit development, preliminary plat

Capacity / size: ~795 acres; 24 principal data center buildings in four phases; ~6,936,000 gross sq ft; ~1,800 MW projected annual electricity consumption at full buildout; 25-acre switching station; ~6-acre substations

VERIFIED PRIMARY

Limitation: The ordinance record does not name the developer/operator (trade press attributes it to Hillwood/PowerHouse — not used here). Water limits: 150,000 gpd average potable; 50,000 gpd average sanitary; $100M community benefit contribution.

Open source →

Project Cardinal Data Center Campus — seven parcels totaling ~305 acres, currently farmland

Kendall County / Yorkville

Developer / operator: Pioneer Development, LLC (petitioner); applicant Matt McCarron

Status: Public hearing "tentatively scheduled"; city page lists the 2026 Annexation Agreement Amendment and Major PUD Amendment as "Awaiting Recordation"

Permit / docket: Original approval Ordinance No. 2025-78; 2026 request = Annexation Agreement Amendment

Record type: Amendment to an annexation agreement (to allow future data center development; extends closing notice deadline)

Capacity / size: ~305 acres over 7 parcels

VERIFIED PRIMARY

Limitation: MW not stated by the city. The larger "1,034 acre / 14 building" figures come from press, not from the city pages, and are excluded.

Open source →

Project Steel (Prologis) data center campus

Kendall County / Yorkville

Developer / operator: Prologis

Status: "Awaiting Recordation"

Permit / docket: n.a. (no ordinance number listed)

Record type: Annexation, Rezoning, Preliminary PUD Plan, Planned Unit Development

VERIFIED PRIMARY

Limitation: City tracking table gives no ordinance number, acreage, date, or MW. Press reports a 540-acre, 16-building campus approved late March 2026 — not confirmed from the city record fetched.

Open source →

Cyrus One – Phase 1 (CHI 11)

Kendall County / Yorkville

Developer / operator: CyrusOne ("Cyrus One")

Status: Ord 2026-09 adopted (listed with ordinance number); Major PUD Amendment "Awaiting Recordation"

Permit / docket: Ord: 2026-09 (Minor PUD Amendment); a separate Major PUD Amendment / Preliminary PUD Plan is listed as "Awaiting Recordation"

Record type: Minor PUD Amendment; Major PUD Amendment + Preliminary PUD Plan

VERIFIED PRIMARY

Limitation: No dates, acreage, or MW on the city tracking table. Note the same table shows "Cyrus One - Phase 2" as "Petitioner has Withdrawn Application".

Open source →

Proposed CyrusOne Data Center, adjacent to the existing Double Black Diamond Solar facility

Sangamon County / Talkington Township

Developer / operator: CyrusOne

Status: County page wording: "Proposed CyrusOne Data Center"; "proposed campus"; project "undergoing" the county zoning review and development process

Permit / docket: n.a. (county page states no petition/case number)

Record type: Conditional permitted use under Sangamon County zoning; plus an Agricultural Impact Mitigation Agreement with the Illinois Department of Agriculture (stated as being entered into)

Capacity / size: 600 MW electrical demand; capital investment described as ~/over $500 million

VERIFIED PRIMARY

Limitation: [Scope: for the 600 MW figure and the "proposed"/under-review status] The county page had not been updated to record a final vote. Secondary reporting (Sangamon Reporter, NPR Illinois) says the County Board granted the conditional use permit 17–10 on April 7, 2026 after tabling it March 23, 2026 — that approval is CORROBORATED only, and no petition number was obtainable. Acreage and address not stated.

Open source →

Planned two-story, 163,593 sq ft, 30 MW data center at 901 Busse Road

Cook County / Elk Grove Village

Developer / operator: EdgeConneX (through counsel Cirrus Advisors)

Status: Resolution "supports issuing a Letter of Receipt"

Permit / docket: Village of Elk Grove Village Resolution 35-26; Cook County Class 6B application

Record type: Property-tax incentive (Cook County Class 6B) — Village Letter of Receipt/support

Capacity / size: 163,593 sq ft; 30 MW

DISCOVERY LEAD

Limitation: Resolution 35-26 could not be retrieved from a Village of Elk Grove Village primary source in this session; date of adoption unknown. Same address as the IEPA construction permit application 26020027 above, which corroborates the site.

Open source →

Civic and infrastructure context

What the evidence says around these projects

42 source-backed evidence rows are integrated on this page.

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Stream ORD (2000 Landmeier Rd)

Cook County / Elk Grove Village

Illinois EPA formally designated the Stream ORD site as an EJ area of concern via its EJ Start tool and issued an EJ notification letter for the construction permit application, which covers an unusually large diesel generator fleet.

Key data: Permit application 25120023, BOA ID 031440AWO; **126 diesel generators at 2.5 MW each**; site designated EJ area

VERIFIED PRIMARY

Limitation: The letter states the screening criterion (block groups at or above the statewide average for low-income and/or minority population) but contains **no numeric percentages**.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

EdgeConneX CHI04 (901 Busse Rd)

Cook County / Elk Grove Village

Illinois EPA issued an EJ notification letter for the EdgeConneX Busse Road construction permit application, confirming EJ-area status.

Key data: Permit application 26020027, BOA ID 031440AYG

VERIFIED PRIMARY

Limitation: No numeric demographics in the letter.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Other EGV data center permits (CHI10-11-12, Aligned EGV PropCo, Prime)

Cook County / Elk Grove Village

At least five separate Elk Grove Village data center air permit applications have triggered Illinois EPA EJ notification letters, indicating the entire cluster sits in designated EJ territory.

Key data: CHI10-11-12: app 24070017 / BOA 031440AUK (201 Innovation Dr); Aligned EGV PropCo: app 24050021 / BOA 031440AWF; Prime Data Centers: app 24090003 / BOA 031440AWZ

VERIFIED PRIMARY

Limitation: Individual letter for CHI10-11-12 at [this PDF](https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/notification-letters/2024/Elk%20Grove%20Village%20(CHI10-11-12)%20Data%20Center%20031440AUK%20Construction%2024070017.pdf); the Aligned letter URL was not individually confirmed.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Prime Data Centers — EJ/Title VI review

Cook County / Elk Grove Village

Illinois EPA's substantive Title VI review is the single most detailed EJ document found across all three states. It notified 87 groups/individuals/officials, received zero inquiries, found no NAAQS violation, and inventoried nearby sensitive receptors. Critically, it documents that **EJScreen, the CDC/ATSDR Environmental Justice Index, and CEJST were all unavailable** at the time of review.

Key data: 87 notification recipients (letter sent 2024-10-03), 0 inquiries received; Elk Grove Village population ~32,000; **11.4% of households speak English less than very well**; within ~1 mile: a high school, an elementary school, an animal hospital, a cemetery, Busse Forest Nature Preserve, and seven parks; 39 diesel generators (3,250 kW Cummins)

VERIFIED PRIMARY

Limitation: The review states no explicit "no disparate impact" finding. Low-income % and minority % are **not stated** anywhere in the document — a real transparency gap in Illinois's own EJ paperwork. Permit at [24090003 (PDF)](https://epa.illinois.gov/content/dam/soi/en/web/epa/topics/environmental-justice/documents/ira/24090003.pdf), 1600 E Higgins.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Stream ORD site — EJScreen screening

Cook County / Elk Grove Village

Independent EJScreen screening of the Stream ORD block group returns the highest EJ-index percentiles of any Illinois anchor site, consistent with Illinois EPA's EJ designation.

Key data: BG 170317704001: 34.6% people of color, $87,917 median HH income; US EJ-index pctiles PM2.5 68 / diesel 71 / RSEI-air 77 / ozone 75 / traffic 68 / NO2 72; state PM2.5 pctile 58

CORROBORATED

Limitation: Coordinates approximated; EJ-index (D2) percentiles.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

EdgeConneX CHI04 site — EJScreen

Cook County / Elk Grove Village

The 901 Busse Rd block group screens moderately high nationally despite high median income.

Key data: BG 170317703005: 22.1% people of color, $136,582 median HH income; US pctiles 54/56/63/62/54/56; state PM2.5 pctile 46

CORROBORATED

Limitation: Same caveats.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

CyrusOne Aurora

Kane County / Aurora

Aurora campus block group screens mid-range on national EJ indexes.

Key data: BG 170438465112: 23.2% people of color, $92,375 median HH income; US pctiles 55/48/55/59/37/51; state PM2.5 pctile 57

CORROBORATED

Limitation: Same caveats.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Joliet Technology Center Subdivision

Will County / Joliet

The Joliet campus block group screens below national median on most EJ indexes; however, the resident lawsuit alleges burdens fall disproportionately on the city's District 5.

Key data: BG 171978833072: 16.2% people of color, $119,057 median HH income; US pctiles 41/34/43/44/22/22; state PM2.5 pctile 40

CORROBORATED

Limitation: Block-group screening may understate impacts on adjacent unincorporated Elwood/Jackson Township residents who are the actual plaintiffs.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

Project Cardinal / Project Steel / CyrusOne Yorkville

Kendall County / Yorkville

Yorkville campus block group is high-income with a moderate minority share and mid-range EJ indexes.

Key data: BG 170938906021: 29.8% people of color, $119,036 median HH income; US pctiles 51/35/45/56/23/28; state PM2.5 pctile 48

CORROBORATED

Limitation: Same caveats.

Open source →

ENVIRONMENTAL JUSTICE DEMOGRAPHIC

CyrusOne Sangamon County

Sangamon County / Talkington Twp

The Sangamon County site is the **lowest-burden block group of all 18 sites screened across the three states** — 1st percentile statewide for the PM2.5 EJ index. This means Illinois's EJ review process would not be triggered here, despite active litigation.

Key data: BG 171670035005: 1.2% people of color, $75,167 median HH income; US pctiles PM2.5 16 / diesel 8 / RSEI-air 6 / ozone 22 / traffic 2 / NO2 6; **state PM2.5 pctile 1**

CORROBORATED

Limitation: Illustrates a key limitation of EJ screening as a civic-impact proxy: low EJ burden does not mean low community conflict.

Open source →

WATER WITHDRAWAL VOLUME

Joliet Technology Center — water conditions

Will County / Joliet

Joliet's approval documents contain the most specific enforceable water conditions found in any of the three states: a hard potable cap, discharge limits, a 3× penalty rate for exceedance, and an outright prohibition on evaporative cooling.

Key data: **150,000 gpd average potable cap**; discharge 50,000 gpd average / 300,000 gpd peak; **3× rate penalty** for exceedance; evaporative cooling prohibited

VERIFIED PRIMARY

Limitation: The retrieved Legistar file is **178-26**; the master database references 179-26. Both may exist (annexation vs. rezoning companion items) — reconcile before relying on the file number.

Open source →

WATER WITHDRAWAL VOLUME

Joliet Technology Center — aquifer allegation

Will County / Joliet

The resident lawsuit alleges the project's actual consumption would exceed the city's stated cap and would draw on an aquifer already projected to fail peak demand.

Key data: Lawsuit alleges 100,000–150,000 gallons/day from an aquifer "projected to no longer meet peak demand in 2030"

VERIFIED PRIMARY

Limitation: Allegation, not adjudicated fact. Joliet is on the Lake Michigan transition; aquifer projection source not independently verified.

Open source →

Show all remaining 30 evidence rows
WATER WITHDRAWAL VOLUME

CyrusOne Yorkville — water cap reduction

Kendall County / Yorkville

Yorkville negotiated a dramatic reduction in CyrusOne's permitted water draw — from 500,000 gpd to 40,000 gpd — with penalties above 1.7× the average daily allotment.

Key data: **500,000 gpd reduced to 40,000 gpd maximum**; penalties above 1.7× average daily allotment; 228-acre site

VERIFIED PRIMARY

Limitation: Reduction reflects a shift to closed-loop/air cooling; earlier reporting cited 393 gal/acre/day for CyrusOne.

Open source →

WATER WITHDRAWAL VOLUME

Project Cardinal — water demand

Kendall County / Yorkville

Cardinal's projected buildout demand rose during review, and the overall campus operates under an average-day cap plus a Lake Michigan connection fee.

Key data: Cardinal 350,000 gpd at buildout (increased from 310,000); campus cap 42,000 gpd average plus Lake Michigan connection fee

CORROBORATED

Limitation: The 350,000 gpd buildout figure and the 42,000 gpd campus average appear inconsistent in scope (peak buildout vs. contractual average); reconcile against the annexation agreements at [Project Cardinal](https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne) and [Project Steel](https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A).

Open source →

WATER WITHDRAWAL VOLUME

CyrusOne Sangamon County

Sangamon County

CyrusOne states the Sangamon campus uses closed-loop cooling with minimal ongoing water demand.

Key data: ~1,100 gallons/day per building, closed loop

DISCOVERY LEAD

Limitation: Developer-published figure with no permit or agreement cap found to enforce it.

Open source →

UTILITY INTERCONNECTION QUEUE

Yorkville Data Center Impact Analysis (The Power Bureau)

Kendall County / Yorkville

A city-commissioned analysis is the best interconnection documentation found in any of the three states. It reports that PJM and ComEd engineering analyses concluded the campus can connect without reducing reliability after developer-funded upgrades, that the interconnection is electrically isolated from ComEd's local network, and that the load is already in PJM's load forecast.

Key data: Target **960 MW** growing from 2027 operations; service via modification of ComEd's **Plano substation** plus extension of **two 345 kV lines**; developer-owned, developer-paid substation; load already included in PJM's load forecast; interconnection approvals already obtained

VERIFIED PRIMARY

Limitation: Commissioned by the city and reliant on developer, ComEd, PJM, and FERC materials plus proprietary software; it reports conclusions but does not reproduce the underlying study numbers, queue positions, or upgrade cost allocations. Contains **no** environmental, EJ, air, or cumulative-impact analysis.

Open source →

UTILITY INTERCONNECTION QUEUE

PJM queue activity near Yorkville

Kendall County

Public PJM queue records near the Yorkville site are largely solar/battery or withdrawn gas, not the data center load itself — consistent with the load being served through transmission upgrades rather than a new generator queue position.

Key data: AH2-258 (solar/battery); Plano 345 kV V1-022, 380 MW; AF1-200, 2,100 MW, withdrawn/moved to TC1

DISCOVERY LEAD

Limitation: Aggregator data; see also [Plano V1-022](https://interxdata.com/projects/plano-345kv-pjm-queue-v1-022/) and [AF1-200](https://interxdata.com/projects/plano-345-kv-pjm-queue-af1-200-moved-to-tc1/). Not verified against PJM's official queue.

Open source →

UTILITY INTERCONNECTION QUEUE

PJM co-location / behind-the-meter rules and load growth

PJM footprint (incl. northern IL)

PJM has proposed a materiality threshold for co-located load and projects very large data-center-driven demand growth, which frames the queue environment for all Illinois anchors.

Key data: Proposed **50 MW** materiality threshold for co-located/BTMG service; PJM data center load growth of roughly **+30 GW 2025–2030**

CORROBORATED

Limitation: Load growth figure from [PJM Inside Lines 2025 year in review](https://insidelines.pjm.com/2025-year-in-review-planning-prepares-for-burgeoning-electricity-demand/). Regional, not project-specific.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

CyrusOne Sangamon County — litigation

Sangamon County

Residents of Waverly and Virden filed a five-count declaratory-judgment suit after the county board approved zoning 17-10. The suit's most concrete allegation is that **CyrusOne's own noise model exceeded the county's 50 dBA property-line standard**, and it cites the company's on-record acknowledgement of an unresolved noise problem at its Aurora campus.

Key data: Filed 2026-07-06, **five counts**; defendants Sangamon County Board, Sangamon County, and C1 Sangamon LLC (Delaware LLC, principal address = CyrusOne HQ); some plaintiffs live 3/4 mile from the site; noise standard **50 dBA at property line** exceeded by developer's own model

VERIFIED PRIMARY

Limitation: Case number not stated; no court date listed on the circuit clerk's website as of publication. Plaintiff names not published.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

CyrusOne Sangamon County — approval process

Sangamon County

The county board tabled the vote in March after a 3.5-hour meeting, then approved 17-10 in April; the ZBA had recommended approval 5-0.

Key data: ZBA 5-0; County Board **17-10** approval 2026-04-07 after 2026-03-23 tabling; ~$500M project

CORROBORATED

Limitation: Corroborated by [Sangamon Reporter](https://www.sangamonreporter.com/post/county-board-approves-data-center-zoning) and [NPR Illinois](https://www.nprillinois.org/sangamon-county/2026-03-23/the-sangamon-county-board-tables-a-vote-on-a-massive-data-center).

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Joliet Technology Center — litigation

Will County / Joliet

Three unincorporated Elwood residents organized as Joliet Residents For Responsible Growth sued to void the council's approval, alleging unconstitutional rezoning of agricultural land, defective public notice, an Open Meetings Act violation, denial of cross-examination, and — most notably — that the city's planning director is the daughter of a person with a financial stake in the project.

Key data: Filed 2026-05-18, Will County Courthouse; plaintiffs Craig Doorneweerd, Rhonda Doorneweerd, Pedro Garcia; defendants City of Joliet, Powerhouse Hillwood Holding, HW Technology Park Development, American Real Estate Partners; challenges a **$20B, 795-acre, 24-building, 6,936,000 sq ft, 1.8 GW** campus; hearing set for Sept 8

VERIFIED PRIMARY

Limitation: Case number not stated. The conflict-of-interest allegation names Planning Director Jayne Bernhard; it is an unadjudicated allegation.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Joliet Technology Center — approval votes

Will County / Joliet

The council approved 8-1 after a hearing exceeding six hours; the plan commission had advanced it 7-1.

Key data: Plan Commission 7-1 (2026-03-05); City Council **8-1** (2026-03-19/20) after a 6+ hour hearing

CORROBORATED

Limitation: Also [The Real Deal](https://therealdeal.com/chicago/2026/03/16/joliet-panel-advances-massive-data-center/).

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Project Cardinal — litigation and settlement

Kendall County / Yorkville

Residents incorporated as Preserve Our Yorkville & Community LLC and sued the city and Pioneer Development; the case reached a conditional settlement that rephased the project — one of the few negotiated resolutions found.

Key data: Suit filed 2026-04-29 against the city and Pioneer over a 1,034-acre approval; conditional settlement rephasing the project approved 2026-06-30

CORROBORATED

Limitation: Filing detail from [Shaw Local](https://www.shawlocal.com/kendall-county-now/2026/04/29/yorkville-residents-file-lawsuit-against-the-city-to-halt-the-1034-acre-project-cardinal-data-center/). Case number and settlement terms not retrieved.

Open source →

COMMUNITY OPPOSITION OR LITIGATION

EGV data center cluster — opposition

Cook County / Elk Grove Village

The mayor defended the village's data center concentration at a packed public hearing; the village is described in coverage as the "data center capital of the Midwest" as Gov. Pritzker calls for statewide regulation.

Key data: Packed public hearing 2026-05-21

CORROBORATED

Limitation: No litigation found against EGV approvals; see also [NBC Chicago](https://www.nbcchicago.com/news/local/data-center-capital-of-the-midwest-expands-as-pritzker-calls-for-regulations/3952720/).

Open source →

COMMUNITY OPPOSITION OR LITIGATION

Grayslake data center (not an anchor project)

Lake County / Grayslake

Litigation over data center approvals extended to a fourth Illinois community in August 2026, indicating a spreading pattern rather than isolated disputes.

Key data: Lawsuit filed August 2026

DISCOVERY LEAD

Limitation: Outside the anchor project list; included as pattern evidence. Details not extracted.

Open source →

RATEPAYER OR GRID IMPACT

ICC large-load deposit requirements

ComEd territory (statewide)

The Illinois Commerce Commission approved ComEd's plan to increase deposits required from large-load customers such as data centers, described by regulators as a first step toward protecting other ratepayers.

Key data: ICC approval 2026-03-19/20; characterized as "an important first step"

CORROBORATED

Limitation: Deposit dollar amounts and thresholds not captured; ICC docket number for this specific decision not obtained.

Open source →

RATEPAYER OR GRID IMPACT

ComEd rate reconciliation citing data center integration

ComEd territory (statewide)

ComEd filed a large rate reconciliation explicitly citing 2025 data center integration costs — the clearest dollar-denominated ratepayer link found in Illinois.

Key data: **$234.3M** reconciliation filed 2026-05-01

CORROBORATED

Limitation: The share of the $234.3M attributable specifically to data centers was not broken out in the fetched coverage. Related grid plan docket: [ICC P2023-0055](https://www.icc.illinois.gov/docket/P2023-0055/documents/353641/files/619131.pdf).

Open source →

RATEPAYER OR GRID IMPACT

CyrusOne Sangamon County — rate claims

Sangamon County

The county's official FAQ states the project will use Ameren's existing grid with no resulting bill increase for other customers — a claim the litigation disputes for lack of utility documentation.

Key data: No bill increase claimed; existing Ameren grid; lawsuit alleges the petition lacked "adequate documentation" from utilities

VERIFIED PRIMARY

Limitation: Government-published developer claim; no interconnection study or utility letter was located to substantiate it.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Joliet Technology Center — farmland conversion

Will County / Joliet

The approval record acknowledges the land "has been farmland throughout its history" while noting the 2007 South Side Comprehensive Plan designated it industrial; the lawsuit's core constitutional claim is that agricultural-to-light-industrial rezoning bears no substantial relation to public welfare.

Key data: ~795 acres of historic farmland rezoned agricultural → light industrial; industrial designation dates to the 2007 South Side Comprehensive Plan

VERIFIED PRIMARY

Limitation: No acreage-of-prime-farmland classification (LESA score) was found.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

CyrusOne Sangamon County — AIMA

Sangamon County

An Agricultural Impact Mitigation Agreement with the Illinois Department of Agriculture was confirmed for the project — the only state-level farmland mitigation instrument found across the three states — but its terms are not published.

Key data: AIMA with Illinois Dept. of Agriculture confirmed; terms not published

CORROBORATED

Limitation: Existence reported via [Sangamon County project page](https://sangamonil.gov/departments/a-c/county-board/proposed-cyrusone-data-center) and [CyrusOne FAQ](https://www.cyrusone.com/sangamon-county-community-faq); the executed document was not located. For reference, the department's [standard solar AIMA template (PDF)](https://agr.illinois.gov/content/dam/soi/en/web/agr/resources/aima/documents/std-solar-aima.pdf) shows typical drainage/topsoil/restoration terms.

Open source →

AGRICULTURAL OR LAND USE CONVERSION

Project Cardinal / Steel / CyrusOne campus

Kendall County / Yorkville

Yorkville annexed and rezoned over a thousand acres of farmland in a single campus approval after a roughly six-hour meeting.

Key data: 1,034–1,037 acres approved; 228 acres for the CyrusOne portion

CORROBORATED

Limitation: Acreage varies slightly by source (1,034 vs. 1,037); no AIMA found for the Yorkville projects.

Open source →

DECOMMISSIONING PROVISION

Decommissioning bonds / removal assurance

statewide (Joliet, Yorkville, Sangamon)

**NOT_FOUND.** No decommissioning bond, removal escrow, site-restoration requirement, or end-of-life provision was found in the Joliet approval full text, the Yorkville annexation agreements and negotiated conditions, or the Sangamon County zoning record. Illinois's negotiated agreements concentrate almost entirely on up-front payments, water caps, and noise — not end-of-life.

Key data: No decommissioning provision located in any Illinois anchor approval

VERIFIED PRIMARY

Limitation: Searched the Joliet full-text ordinance, Yorkville annexation agreement pages ([Cardinal](https://www.yorkville.il.us/906/Project-Cardinal-Data-Center-Campus-Anne), [Steel](https://www.yorkville.il.us/905/Project-Steel-Data-Center-Campus-Annex-A), [CyrusOne Phase 2](https://www.yorkville.il.us/923/C1-Yorkville---Phase-2-Data-Center-Campu)), and [Sangamon Title 17 zoning code (PDF)](https://energyzoning.org/sites/default/files/PDF/17167_Sangamon%20_20220927.pdf). Absence is the finding; full executed annexation agreements (as opposed to their web summaries) were not all obtained.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

Joliet Technology Center — fiscal package

Will County / Joliet

Joliet secured what appears to be the largest community benefit package of any project in the three states — with **no city incentives or abatements granted** — including a $20M payment within 30 days of closing.

Key data: ~**$310M** property taxes over 30 years + ~**$40M** utility taxes; **$100M community benefit** with **$20M within 30 days of closing** and proportional payments per phase; **no city incentives or abatements**; mayor cited $677M in property taxes for Joliet Township HS

VERIFIED PRIMARY

Limitation: The $677M schools figure is a mayoral statement from [the city's announcement](https://www.joliet.gov/Home/Components/News/News/5640/41), not an independent projection; the $310M/$40M figures are projections over 30 years, undiscounted.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

Yorkville campus — up-front payments

Kendall County / Yorkville

Yorkville extracted large up-front payments due at first building permit from all three campus developers, front-loading fiscal benefit rather than relying on future tax streams.

Key data: **Project Cardinal $51M, Project Steel $40M, CyrusOne $15M** up front at first building permit

VERIFIED PRIMARY

Limitation: Whether these are impact fees, prepaid taxes, or unrestricted contributions was not clarified in fetched coverage.

Open source →

FISCAL IMPACT LOCAL GOVERNMENT

CyrusOne Sangamon County — tax impact

Sangamon County

The project projects meaningful recurring property tax revenue with no abatement requested, naming the specific taxing bodies that benefit.

Key data: ~**$6M/year** property tax at full buildout; **no abatement requested**; beneficiaries include North Mac schools, fire and library districts

DISCOVERY LEAD

Limitation: Developer projection; not verified against a county assessor estimate.

Open source →

NOISE OR TRAFFIC IMPACT

CyrusOne Sangamon County — noise

Sangamon County

This is the sharpest noise finding across all three states: the county's 50 dBA property-line standard versus the developer's own model showing exceedance, plus documented "unbelievable noise" complaints from residents near CyrusOne's existing Aurora campus.

Key data: **50 dBA at property line**; CyrusOne's own model several dB above the cap; on-record acknowledgement of an unresolved noise problem at Aurora

VERIFIED PRIMARY

Limitation: The exact modeled dBA value was not reported; "several decibels above" is the paper's characterization of the filing.

Open source →

NOISE OR TRAFFIC IMPACT

Joliet Technology Center — noise and traffic

Will County / Joliet

The applicant claims property-line noise at or below 65 dB against Illinois Pollution Control Board octave-band limits; the lawsuit alleges the traffic study ignored the multi-year construction window entirely.

Key data: IPCB limits 40–75 dB by octave band; model ordinances 60–70 dB; applicant claims ≤65 dB at property line; lawsuit alleges the traffic study omitted the **5–7 year construction window**

VERIFIED PRIMARY

Limitation: City staff's position was that noise would be "mitigated by the structures themselves, as well as by the landscape berms" — no measured or modeled dBA figures were published.

Open source →

NOISE OR TRAFFIC IMPACT

Yorkville campus — monitoring conditions

Kendall County / Yorkville

Yorkville imposed continuous noise monitoring devices and construction traffic monitoring plus a hard deadline for roadway improvements — the most operationalized noise/traffic conditions found in Illinois.

Key data: Continuous noise monitoring devices required; construction traffic monitoring; roadway improvements required by **2027-11-30**

VERIFIED PRIMARY

Limitation: No dBA limit was reported alongside the monitoring requirement; enforcement mechanism unclear.

Open source →

CUMULATIVE REGIONAL IMPACT

EdgeConneX EGV — cumulative NAAQS analysis

Cook County / Elk Grove Village

Illinois EPA's Modeling Unit performed and audited an actual **cumulative** NAAQS analysis for annual NOx, incorporating nearby inventory sources and monitored background. This is the only genuine quantitative cumulative air analysis found in any of the three states.

Key data: Annual NO2: modeled 41.68 + background 32.34 = **74.02 µg/m³** (applicant) vs. 41.71 + 35.42 = **77.12 µg/m³** (agency audit), against a NAAQS of **100 µg/m³**; background monitor Schiller Park AQS 17-031-3103 (~7 km), annual NO2 design values 17.21 / 17.01 / 18.82 ppb for 2022/2023/2024; annual NO2 impact 2.18 µg/m³ exceeded the 1 µg/m³ SIL, triggering the cumulative analysis

VERIFIED PRIMARY

Limitation: Cumulative treatment covers annual NOx only; secondary PM2.5/ozone were assessed using a hypothetical source in Stephenson County ~145 km away, a MERPs screening approach rather than site-specific modeling. Cumulative analysis did not identify a NAAQS exceedance.

Open source →

CUMULATIVE REGIONAL IMPACT

Prime Data Centers — cumulative concern, qualitative

Cook County / Elk Grove Village

Illinois EPA acknowledged in writing that Elk Grove Village hosts concentrated manufacturing, freight logistics, and "several data centers," and that PM2.5 and HAP increases "may present concerns, particularly where other industrial sources are located nearby" — then produced **no quantitative multi-source analysis**. Modeling showed the project alone exceeded 24-hour PM2.5, 24-hour PM10, and 1-hour NO2 significant impact levels before controls.

Key data: 24-hr PM2.5, 24-hr PM10, and 1-hr NO2 each **exceeded the applicable SIL before additional controls**; Modeling Unit recommended diesel particulate filters on **20 of 39** emergency generators

VERIFIED PRIMARY

Limitation: The agency explicitly states no combined modeled concentrations from Prime Data plus other nearby sources were produced — the cumulative concern was identified but not quantified.

Open source →

CUMULATIVE REGIONAL IMPACT

EGV data center concentration

Cook County / Elk Grove Village

Elk Grove Village hosts around twenty data centers occupying roughly 4.5 million square feet inside a 66-million-square-foot business park — the densest cluster identified in Illinois.

Key data: ~**20 data centers, ~4.5M sq ft** within a 66M sq ft business park

CORROBORATED

Limitation: Also covered by [Daily Herald](https://www.dailyherald.com/20260407/technology/power-water-and-worry-how-growing-data-center-concerns-are-being-addressed-locally-and-statewide/). Journalistic count.

Open source →

CUMULATIVE REGIONAL IMPACT

State-level cumulative impact assessment

statewide

**NOT_FOUND.** No Illinois agency has produced a cumulative regional assessment of data center water, power, or air impacts. The closest available analysis is a national NGO report on data center water stress.

Key data: No state cumulative assessment located

DISCOVERY LEAD

Limitation: Searched Illinois EPA, ICC, and Illinois Dept. of Agriculture. Illinois EPA's cumulative work is permit-by-permit air modeling only (see EdgeConneX row above), with no water or regional load equivalent.

Open source →

Project profile evidence

Operators, locations, power, water, capacity and other project facts

33 source-backed evidence rows are integrated on this page.

EXACT LOCATION

Stream ORD

Cook County / Elk Grove Village

The Illinois EPA environmental-justice notification letter for the project states the address and describes the scope as a new data center with 126 diesel emergency generators.

Key data: 2000 Landmeier Road, Elk Grove Village; 126 × 2.5 MW diesel emergency generators; BOA ID 031440AWO, application 25120023

VERIFIED PRIMARY

Limitation: No PIN/parcel number stated; no coordinates.

Open source →

OWNERSHIP CHAIN / OPERATOR

Stream ORD

Cook County / Elk Grove Village

The IEPA letter names the applicant only as "Stream ORD" with contact Emily Weissinger. Stream Data Centers' own locations page lists its Chicago portfolio including 2000 Landmeier Road (ORDC) and names holding entities for its other Chicago sites.

Key data: Applicant "Stream ORD" (contact Emily Weissinger); Stream entities SDC CHI I LLC and SDC CHI II BUSSE LLC used for sibling sites

CORROBORATED

Limitation: The specific holding LLC for 2000 Landmeier was not identified; Cook County PIN/deed lookup not accessible.

Open source →

POWER SUPPLIER

Stream ORD

Cook County / Elk Grove Village

Stream's Chicago locations page identifies ComEd as the utility for its Chicago-area campuses.

Key data: ComEd

CORROBORATED

Limitation: No interconnection agreement or large-load contract reference published; the IEPA letter does not name a utility.

Open source →

JURISDICTION STACK

Stream ORD

Cook County / Elk Grove Village

The IEPA notification letter enumerates the full governmental stack notified for the permit, spanning village, county, state and federal layers plus a stormwater special district.

Key data: Elk Grove Village; Cook County (Dept. of Environment & Sustainability, Board of Commissioners, Facilities Management); Illinois EPA Bureau of Air; IDOT; Lake County Stormwater Management Commission; U.S. Army Corps of Engineers; State Senate 28 / State Rep 56 / U.S. Congressional 3

VERIFIED PRIMARY

Limitation: The distribution list mixes standard recipients; Lake County SMC inclusion appears to be boilerplate rather than jurisdictional.

Open source →

WATER SUPPLIER

Elk Grove Village data centers (Stream ORD, EdgeConneX CHI04, CHI10-12, Aligned EGV, Prime)

Cook County / Elk Grove Village

Elk Grove Village purchases Lake Michigan water through the North Suburban Municipal Joint Action Water Agency (JAWA), which contracts with the City of Chicago; certain unincorporated properties get sewer service from Bensenville.

Key data: "The Village purchases Lake Michigan water through the North Suburban Municipal Joint Action Water Agency (JAWA). JAWA currently contracts with the City of Chicago for water."

VERIFIED PRIMARY

Limitation: No project-specific water service agreement or allocation for any individual data center located.

Open source →

PLANNING ZONING CONTACT / GENERAL CONTACT

Elk Grove Village data centers (all)

Cook County / Elk Grove Village

Elk Grove Village's department directory publishes Community Development contacts for building and zoning matters.

Key data: Community Development (847) 357-4220, Building@elkgrove.org; Village Hall 901 Wellington Ave

VERIFIED PRIMARY

Limitation: No case-specific planner published for any of the data center applications.

Open source →

ECON DEV CONTACT

Elk Grove Village data centers (all)

Cook County / Elk Grove Village

The Village publishes a named Business Development Director.

Key data: Sue Dees, Business Development Director, (847) 357-4005

VERIFIED PRIMARY

Limitation: Caution for the master database: investelkgrove.org and Darrell Doan refer to Elk Grove, **California** — not Elk Grove Village, Illinois.

Open source →

GENERAL CONTACT (state permit)

Elk Grove Village data centers (all)

Cook County / Elk Grove Village

Illinois EPA routes all data center air-permit questions through the Office of Environmental Justice manager, published on every notification letter.

Key data: Chris Pressnall, Manager, Office of Environmental Justice, (217) 524-1284, EPA.OEJ@Illinois.gov

VERIFIED PRIMARY

Limitation: Bureau of Air permit engineer Morgan Schaab (217) 782-7027 appears on the EdgeConneX CHI04 letter.

Open source →

EXACT LOCATION

EdgeConneX CHI04 / Busse Rd

Cook County / Elk Grove Village

The IEPA EJ notification letter for CHI04 gives the street address and permit identifiers, and describes eleven 3,000 kW diesel generators.

Key data: 901 Busse Road, Elk Grove Village; BOA ID 031440AYG, construction permit application 26020027; 11 × 3,000 kW diesel generators

VERIFIED PRIMARY

Limitation: No PIN. Cook County Class 6B incentive was reported as sought, per the same civic-impact pass.

Open source →

OWNERSHIP CHAIN / OPERATOR

EdgeConneX CHI04

Cook County / Elk Grove Village

The applicant is EdgeConneX, described in trade reporting as EQT-owned; the IEPA letter names no parent or land owner.

Key data: Applicant "EdgeConneX"; parent EQT per trade reporting

DISCOVERY LEAD

Limitation: EQT parentage established from Ohio-focused reporting; no Illinois-specific corporate record retrieved.

Open source →

EXACT LOCATION / OPERATOR

EGV CHI10-11-12

Cook County / Elk Grove Village

The IEPA EJ letter for the Elk Grove Village (CHI10-11-12) data center gives the address and states the new generators will operate under limits from existing Construction Permit 20120040.

Key data: 201 Innovation Drive, Elk Grove Village; BOA ID 031440AUK, permit 24070017; one 500 kWe + twelve 3,100 kWe diesel generators; existing permit 20120040

VERIFIED PRIMARY

Limitation: The letter does not name the applicant entity or operator; the prior pass's association of this permit with Microsoft could not be confirmed from the letter itself.

Open source →

EXACT LOCATION

Prime Data Centers (ORD01 / EGV)

Cook County / Elk Grove Village

The IEPA EJ letter places Prime's first phase at 1600 E Higgins Rd with 39 new diesel generators; Prime's own site lists the campus addresses.

Key data: 1600 E Higgins Rd (BOA ID 031440AWZ, app 24090003); campus addresses 1650 / 1600 / 1550 E Higgins Rd

VERIFIED PRIMARY

Limitation: Campus address range is from Prime's own page: https://primedatacenters.com/locations/chicago/

Open source →

Show all remaining 21 evidence rows
POWER SUPPLIER / SURROUNDING INFRASTRUCTURE

Prime Data Centers (ORD01)

Cook County / Elk Grove Village

Prime's Chicago page identifies ComEd service with an adjacent substation and 17 carriers on the campus.

Key data: ComEd; adjacent substation; 17 carriers

CORROBORATED

Limitation: No interconnection agreement reference; marketing page rather than a filing.

Open source →

EXACT LOCATION / OWNERSHIP CHAIN / POWER SUPPLIER

Aligned EGV (ORD-03)

Cook County / Elk Grove Village

Aligned's Chicago page lists the ORD-03 address and a 36-acre campus; an aggregator records the holding entity, capacity and utility.

Key data: 50 NW Point Blvd, Elk Grove Village, IL 60007; 36-ac campus; entity "Aligned Data Centers (EGV) PropCo, LLC"; 336 MW; ComEd

CORROBORATED

Limitation: Entity name, MW and utility come from the aggregator https://www.datacenter.fyi/state/il/elk-grove-village (DISCOVERY_LEAD); ultimate parent is the AIP/MGX/BlackRock GIP consortium per the Aligned press release cited in the Ohio table.

Open source →

EXACT LOCATION

CyrusOne Aurora (CHI1-CHI3)

Kane / DuPage County / Aurora

CyrusOne's own page describes a 16-acre Aurora campus with 450,000 sq ft of technical space and 114 MW total IT capacity; aggregator listings give the three street addresses.

Key data: 2705 / 2805 / 2905 Diehl Rd, Aurora, IL 60502; 16-ac campus; 450,000 sq ft; 114 MW IT

CORROBORATED

Limitation: Street addresses are from https://www.datacentermap.com/usa/illinois/aurora/ (DISCOVERY_LEAD); CyrusOne's page states no address. County line (Kane vs DuPage) not resolved from a primary source.

Open source →

WATER SUPPLIER

CyrusOne Aurora

Kane / DuPage County / Aurora

CyrusOne states the Aurora campus uses no water for cooling, with only minimal water for humidification and maintenance, describing itself as insulated from regional water risk.

Key data: "No water consumption for cooling"; "Minimal water used for humidification and maintenance"

VERIFIED PRIMARY

Limitation: Municipal water provider (presumably City of Aurora) not named on the page.

Open source →

EXACT LOCATION

Joliet Technology Center Subdivision (file 178-26 / A-4-25)

Will County / Joliet

The City of Joliet staff report describes roughly 795 acres surrounding South Rowell Road and Bernhard Road.

Key data: ~795 ac surrounding S. Rowell Road and Bernhard Road; ~1,800 MW at buildout

VERIFIED PRIMARY

Limitation: PINs listed in the report were not individually extracted; file number confirmed as 178-26, correcting the earlier 179-26.

Open source →

OWNERSHIP CHAIN

Joliet Technology Center Subdivision

Will County / Joliet

The staff report names PowerHouse Hillwood Holding, LLC as applicant/contract purchaser and lists the Bernhard-family record owners of the assembled parcels.

Key data: Applicant/contract purchaser: PowerHouse Hillwood Holding, LLC (Hillwood Investment Properties + PowerHouse Data Centers). Owners: Bernhard Farms Inc; Bernhard Family Land Trust; Leo E. & Lois I. Bernhard; Leonard E. Bernhard; Jean R. Smith; Joan E. Long; Joy C. & Ray M. Garza; James E. Bernhard

VERIFIED PRIMARY

Limitation: Hillwood/PowerHouse joint-venture structure is inferred from the entity name plus trade reporting, not stated in the report.

Open source →

POWER SUPPLIER / SURROUNDING INFRASTRUCTURE

Joliet Technology Center Subdivision

Will County / Joliet

The staff report provides for a 25-acre switching station on Lot 3 to be conveyed to ComEd, plus roughly 6-acre substations for each development phase, with PJM interconnection.

Key data: 25-ac ComEd switching station (Lot 3, to be conveyed to ComEd); ~6-ac substation per phase; PJM interconnection

VERIFIED PRIMARY

Limitation: No interconnection queue number or large-load contract reference published.

Open source →

WATER SUPPLIER

Joliet Technology Center Subdivision

Will County / Joliet

Joliet Public Utilities director Alison Swisher describes a water agreement with the data center company containing specific average and maximum daily caps; the average committed use is 120,000 gallons per day (3.6 million per month), much of it for irrigation, with closed-loop cooling. Joliet is transitioning from its aquifer to Lake Michigan water by 2030 via the Grand Prairie Water Commission.

Key data: 120,000 gpd average cap; Joliet Public Utilities; Lake Michigan transition by 2030 via Grand Prairie Water Commission ($224.4M)

CORROBORATED

Limitation: The written water service agreement itself was not retrieved; the article does not name the company.

Open source →

JURISDICTION STACK / GENERAL CONTACT

Joliet Technology Center Subdivision

Will County / Joliet

Approval authority is the City of Joliet (Plan Commission and City Council) with Joliet Public Utilities for water/sewer; the county layer is Will County and state siting/air is Illinois EPA. Joliet's news release quotes City Manager Beth Beatty and the projected $310M in property taxes over 30 years.

Key data: City Manager Beth Beatty; $310M property taxes over 30 years; Joliet Public Utilities director Alison Swisher

VERIFIED PRIMARY

Limitation: No named planner/case manager for file 178-26 published.

Open source →

EXACT LOCATION / OWNERSHIP CHAIN

Project Cardinal (Pioneer Development, PZC 2025-08)

Kendall County / Yorkville

Yorkville's project page describes the site as northwest of Route 47 and Galena Road, south of Baseline Road and east of Ashe Road, and lists the petitioner and all record owners.

Key data: Petitioner: Pioneer Development, LLC (contract purchaser). Owners: Galena & 47th LLC; MPLIV10 LLC; Sanjay and Sameer Gupta; Dale L. Konicek LLC; The Konicek Family Limited Partnership

VERIFIED PRIMARY

Limitation: PINs not extracted; ~305-acre figure from the brief not restated on the fetched page.

Open source →

SURROUNDING INFRASTRUCTURE / POWER SUPPLIER

Project Cardinal

Kendall County / Yorkville

The Yorkville case materials describe two substations plus a switchyard on the campus.

Key data: 2 substations + 1 switchyard

VERIFIED PRIMARY

Limitation: Serving utility (presumably ComEd) not named on the page; no interconnection reference.

Open source →

PLANNING ZONING CONTACT

Yorkville data center cases (Cardinal, Steel, CyrusOne)

Kendall County / Yorkville

Yorkville publishes a named Community Development Director as the case contact for the data center petitions.

Key data: Krysti Barksdale-Noble, Community Development Director, 630-553-8573, knoble@yorkville.il.us

VERIFIED PRIMARY

Limitation: Reviewing body is the Yorkville Planning and Zoning Commission (PZC case numbers).

Open source →

EXACT LOCATION / OWNERSHIP CHAIN

Project Steel (Prologis, case 2025-07)

Kendall County / Yorkville

Yorkville's page places Project Steel east of Eldamain Road between Corneils and Galena Roads across roughly 540 acres in 16 parcels, with Prologis, L.P. as petitioner and four owner groups.

Key data: ~540 ac / 16 parcels; petitioner Prologis, L.P.; owners Rosenwinkel Family Trust; George Ostreko Jr. Et Al; Mary Auer; Jerry G. & Marilee Foltz; 3 substations

VERIFIED PRIMARY

Limitation: End operator/tenant not disclosed; Prologis is the developer of record.

Open source →

EXACT LOCATION / OWNERSHIP CHAIN

CyrusOne Yorkville Phase 1 / Phase 2

Kendall County / Yorkville

Yorkville's archived data center page documents the preliminary PUD approvals for the CyrusOne campus (Ordinances 2024-31 and 2024-33); later reporting describes a further ~128-acre campus north of Faxon Road.

Key data: Ord. 2024-31 / 2024-33 preliminary PUD; later ~128 ac north of Faxon Road

VERIFIED PRIMARY

Limitation: Phase 2 acreage from https://www.dailyherald.com/20250919/technology/cyrusone-proposes-120-acre-data-center-campus/ (CORROBORATED); no PIN or utility agreement located.

Open source →

EXACT LOCATION

Proposed CyrusOne Data Center (600 MW)

Sangamon County / Talkington Township

Sangamon County's dedicated project page places the site at the northwest corner of Thayer and Clark roads in Talkington Township, about 14 miles southwest of Springfield.

Key data: NW corner of Thayer & Clark roads, Talkington Township; ~14 mi SW of Springfield; 600 MW, ~$500M

VERIFIED PRIMARY

Limitation: PIN not published on the page.

Open source →

POWER SUPPLIER

Proposed CyrusOne Data Center

Sangamon County

The county page identifies both Ameren Illinois and the Rural Electric Convenience Cooperative (RECC) in the electric service arrangement, with MISO reviewing.

Key data: Ameren Illinois + Rural Electric Convenience Cooperative (RECC); MISO review

VERIFIED PRIMARY

Limitation: No interconnection agreement number or large-load tariff docket published.

Open source →

WATER SUPPLIER

Proposed CyrusOne Data Center

Sangamon County

The county page describes a closed-loop cooling design using roughly 1,100 gallons per day per building with on-site septic for wastewater — i.e. no municipal water utility service.

Key data: Closed loop; ~1,100 gpd per building; septic

VERIFIED PRIMARY

Limitation: Source of the make-up water (well vs hauled) not stated.

Open source →

JURISDICTION STACK / PLANNING ZONING CONTACT

Proposed CyrusOne Data Center

Sangamon County

Zoning authority is Sangamon County Building & Zoning with the County Board approving (17-10); the Springfield-Sangamon County Regional Planning Commission also reviews. Zoning Administrator is Trustin Harrison.

Key data: Sangamon County Building & Zoning, 200 S. Ninth St Rm 234, (217) 753-6760, zoning@sangamonil.gov; Zoning Administrator Trustin Harrison; Regional Planning Commission contact Emily Prather (217) 535-3110

VERIFIED PRIMARY

Limitation: The contact page publishes only the main line, not a direct number or email for Harrison.

Open source →

NOT FOUND

Illinois projects — ECON_DEV_CONTACT (Joliet, Aurora, Yorkville, Sangamon)

Multiple

Searched city/county sites and the fetched case materials for named economic development staff assigned to these data center projects. Only Elk Grove Village published a named business development director; Joliet, Aurora, Yorkville and Sangamon County econ-dev contacts specific to these projects were not located.

Key data: Only named IL econ-dev contact found: Sue Dees (Elk Grove Village)

DISCOVERY LEAD

Limitation: Regional bodies (Will County CED, Kendall County, Greater Springfield Chamber) were not individually queried.

Open source →

NOT FOUND

Illinois projects — OWNERSHIP_CHAIN via deeds / Secretary of State

Multiple

Cook, Will, Kane/DuPage and Kendall county recorder/PIN searches and Illinois Secretary of State entity lookups were not accessible in this session; ownership chains were instead built from municipal staff reports (Joliet, Yorkville) which name record owners directly.

Key data: No IL recorder deed or SOS entity record retrieved

DISCOVERY LEAD

Limitation: Municipal staff reports proved the better primary source for Illinois ownership than registry lookups.

Open source →

NOT FOUND

Illinois projects — SURROUNDING_INFRASTRUCTURE detail (fiber, rail, sewer trunk)

Multiple

Beyond substations/switchyards named in the Joliet and Yorkville staff reports and carrier counts on Prime's marketing page, no primary source identified fiber routes, rail spurs, or specific water/sewer trunk mains for any Illinois project.

Key data: Only substation/switchyard counts and "17 carriers" (Prime) obtained

DISCOVERY LEAD

Limitation: Utility atlas / GIS layers for Elk Grove Village, Joliet and Yorkville were not accessible.

Open source →

Illinois project / topic roster

Research currently compiled for Illinois

71 project/topic labels are retained here, including unresolved aliases that still require canonical reconciliation.

Project or topicEvidence state
"Stream ORD" new data center, 2000 Landmeier Road, Elk Grove VillageSource-backed / reconciliation-aware
Aligned EGV (ORD-03)Source-backed / reconciliation-aware
ComEd rate reconciliation citing data center integrationSource-backed / reconciliation-aware
Cyrus One – Phase 1 (CHI 11)Source-backed / reconciliation-aware
CyrusOne AuroraSource-backed / reconciliation-aware
CyrusOne Aurora (CHI1-CHI3)Source-backed / reconciliation-aware
CyrusOne LLC, 2905 E. Diehl Road, Aurora, IL 60502Source-backed / reconciliation-aware
CyrusOne Sangamon CountySource-backed / reconciliation-aware
CyrusOne Sangamon County — AIMASource-backed / reconciliation-aware
CyrusOne Sangamon County — approval processSource-backed / reconciliation-aware
CyrusOne Sangamon County — litigationSource-backed / reconciliation-aware
CyrusOne Sangamon County — noiseSource-backed / reconciliation-aware
CyrusOne Sangamon County — rate claimsSource-backed / reconciliation-aware
CyrusOne Sangamon County — tax impactSource-backed / reconciliation-aware
CyrusOne Yorkville Phase 1 / Phase 2Source-backed / reconciliation-aware
CyrusOne Yorkville — water cap reductionSource-backed / reconciliation-aware
Decommissioning bonds / removal assuranceSource-backed / reconciliation-aware
EGV CHI10-11-12Source-backed / reconciliation-aware
EGV data center cluster — oppositionSource-backed / reconciliation-aware
EGV data center concentrationSource-backed / reconciliation-aware
EdgeConneX CHI04Source-backed / reconciliation-aware
EdgeConneX CHI04 (901 Busse Rd)Source-backed / reconciliation-aware
EdgeConneX CHI04 / Busse RdSource-backed / reconciliation-aware
EdgeConneX CHI04 site — EJScreenSource-backed / reconciliation-aware
EdgeConneX EGV — cumulative NAAQS analysisSource-backed / reconciliation-aware
EdgeConneX new data center "CHI04", 901 Busse Road, Elk Grove VillageSource-backed / reconciliation-aware
Elk Grove Village data centers (Stream ORD, EdgeConneX CHI04, CHI10-12, Aligned EGV, Prime)Source-backed / reconciliation-aware
Elk Grove Village data centers (all)Source-backed / reconciliation-aware
Grayslake data center (not an anchor project)Source-backed / reconciliation-aware
ICC large-load deposit requirementsSource-backed / reconciliation-aware
Illinois projects — ECON_DEV_CONTACT (Joliet, Aurora, Yorkville, Sangamon)Source-backed / reconciliation-aware
Illinois projects — OWNERSHIP_CHAIN via deeds / Secretary of StateSource-backed / reconciliation-aware
Illinois projects — SURROUNDING_INFRASTRUCTURE detail (fiber, rail, sewer trunk)Source-backed / reconciliation-aware
Joliet Technology Center SubdivisionSource-backed / reconciliation-aware
Joliet Technology Center Subdivision (file 178-26 / A-4-25)Source-backed / reconciliation-aware
Joliet Technology Center Subdivision — ~795-acre data center campus surrounding S. Rowell Road and Bernhard RoadSource-backed / reconciliation-aware
Joliet Technology Center — approval votesSource-backed / reconciliation-aware
Joliet Technology Center — aquifer allegationSource-backed / reconciliation-aware
Joliet Technology Center — farmland conversionSource-backed / reconciliation-aware
Joliet Technology Center — fiscal packageSource-backed / reconciliation-aware
Joliet Technology Center — litigationSource-backed / reconciliation-aware
Joliet Technology Center — noise and trafficSource-backed / reconciliation-aware
Joliet Technology Center — water conditionsSource-backed / reconciliation-aware
Other EGV data center permits (CHI10-11-12, Aligned EGV PropCo, Prime)Source-backed / reconciliation-aware
PJM co-location / behind-the-meter rules and load growthSource-backed / reconciliation-aware
PJM queue activity near YorkvilleSource-backed / reconciliation-aware
Planned two-story, 163,593 sq ft, 30 MW data center at 901 Busse RoadSource-backed / reconciliation-aware
Prime Data Centers (ORD01 / EGV)Source-backed / reconciliation-aware
Prime Data Centers (ORD01)Source-backed / reconciliation-aware
Prime Data Centers — EJ/Title VI reviewSource-backed / reconciliation-aware
Prime Data Centers — cumulative concern, qualitativeSource-backed / reconciliation-aware
Project CardinalSource-backed / reconciliation-aware
Project Cardinal (Pioneer Development, PZC 2025-08)Source-backed / reconciliation-aware
Project Cardinal / Project Steel / CyrusOne YorkvilleSource-backed / reconciliation-aware
Project Cardinal / Steel / CyrusOne campusSource-backed / reconciliation-aware
Project Cardinal Data Center Campus — seven parcels totaling ~305 acres, currently farmlandSource-backed / reconciliation-aware
Project Cardinal — litigation and settlementSource-backed / reconciliation-aware
Project Cardinal — water demandSource-backed / reconciliation-aware
Project Steel (Prologis) data center campusSource-backed / reconciliation-aware
Project Steel (Prologis, case 2025-07)Source-backed / reconciliation-aware
Proposed CyrusOne Data CenterSource-backed / reconciliation-aware
Proposed CyrusOne Data Center (600 MW)Source-backed / reconciliation-aware
Proposed CyrusOne Data Center, adjacent to the existing Double Black Diamond Solar facilitySource-backed / reconciliation-aware
State-level cumulative impact assessmentSource-backed / reconciliation-aware
Stream ORDSource-backed / reconciliation-aware
Stream ORD (2000 Landmeier Rd)Source-backed / reconciliation-aware
Stream ORD site — EJScreen screeningSource-backed / reconciliation-aware
Yorkville Data Center Impact Analysis (The Power Bureau)Source-backed / reconciliation-aware
Yorkville campus — monitoring conditionsSource-backed / reconciliation-aware
Yorkville campus — up-front paymentsSource-backed / reconciliation-aware
Yorkville data center cases (Cardinal, Steel, CyrusOne)Source-backed / reconciliation-aware
Research and local discovery

Find data center projects and the public records around them in Illinois.

This state page combines mapped locations with permits, planning and zoning activity, infrastructure context, operators and civic records. The deeper corpus is supplemented by 4 accepted rows from the validated national refresh. Counts describe evidence records, not unique facilities.

Where a source does not establish a location, utility, water supplier or other fact, that gap remains explicit rather than being converted into an unsupported map point or claim.

See the evidence and publication methodology →

Illinois Data Centers, Projects & Compute Infrastructure Research | Compute Equity Atlas