Compute Equity Atlas
← National map
Source-backed project record · AZ

Edged Phoenix Mesa Data Center

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
FIRST_PARTY_IDENTITY_GEOGRAPHY_HELDbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerEdged US
JurisdictionMesa, AZ
Address8811 East Warner Road, Mesa, AZ 85212
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesEdged Phoenix Mesa Data Center
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

Edged Phoenix Mesa Data Center: site identity

Evidence record

Operator April 2026 opening announcement confirms the operating Mesa facility; 2024 operator groundbreaking binds 8811 East Warner Road. Census returns no match, so map geometry remains held. Edged Energy and Edged Mesa archive rows represent one site.

Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29

Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open source 1 →

Sources

Evidence and provenance

  • Edged US ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.
  • Edged US ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open AZ state research →

Edged Phoenix Mesa Data Center Data Center Project | Mesa | Compute Equity Atlas