Compute Equity Atlas
← National map
Source-backed project record · ME

FirstLight Brunswick Data Center

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
FIRST_PARTY_IDENTITY_GEOGRAPHY_HELDbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerFirstLight
JurisdictionBrunswick, ME
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesFirstLight Brunswick Data Center
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

FirstLight Brunswick Data Center: site identity

Evidence record

Operator confirms completed February 2025 expansion and current customer operations at its Brunswick Landing data center. Expansion is not a separate physical site. No independently verified street address was obtained in this pass, so geography remains held.

Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29

Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open source 1 →

Sources

Evidence and provenance

  • FirstLight ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.
  • FirstLight ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open ME state research →

FirstLight Brunswick Data Center Data Center Project | Brunswick | Compute Equity Atlas