Compute Equity Atlas
← National map
Source-backed project record · NE

Fortitude Prosser Facility

This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
VERIFIED_PRIMARYbest evidence tier
8linked evidence rows
Project facts

Location and operating record

Operator / developerFortitude Mining Holdings, Inc.
JurisdictionProsser, NE
AddressNot published
Location precisionlocality centroid
Coordinates40.687385, -98.577967
CapacityNot established
AliasesFortitude Prosser Facility · Fortitude Prosser
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Fortitude Prosser Facility: source record

operational

No street address or county is stated in Fortitude's press release; Prosser is an unincorporated community in Adams County, and the county attribution here is geographic knowledge, not source-stated - flagged as a gap. Purchase price $6.25 million, with a roughly $985,000 hosting deposit credit and about $465,500 of T21 miners credited, netting roughly $4.7 million new cash to close. Power cost estimated at about $0.045/kWh in the Southwest Power Pool with demand response participation. Includes land, building, an on-site 67 kV substation and an on-site repair workshop.

Key data: Southern Public Power District (power deposits paid to Southern Public Power District) | Southwest Power Pool (SPP)

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

OWNERSHIP AND PROFILE

Fortitude Prosser Facility: ownership and profile

operational

Owner: Fortitude Mining Holdings, Inc. | County: Adams | Research region: Central Nebraska

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

operational

Fortitude completed the acquisition of a 12.5 MW digital infrastructure facility in Prosser, Nebraska for $6.25 million in an asset purchase of the underlying real property, including land, building, an on-site 67 kV substation and a repair workshop; the asset was generating revenue at close.

Key data: 12.5 MW; $6.25 million

Claim classification: verified_outcome · Verification: verified_against_primary_source · Retrieved: 2026-09-14

Status date: 2026-08-04

Limitation: No street address or county stated.

Open source 1

POWER AND GRID

Fortitude Prosser Facility: power and grid

operational

Key data: Utility: Southern Public Power District (power deposits paid to Southern Public Power District) | Grid area: Southwest Power Pool (SPP) | Requested load MW: 12.5 | Substations: On-site 67 kV substation owned by the facility

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

operational

Net new cash to close was about $4.7 million, reflecting power deposits already made to Southern Public Power District; power cost is estimated at about $0.045/kWh in the Southwest Power Pool with demand response participation.

Key data: Southern Public Power District deposits

Claim classification: documented_fact · Verification: verified_against_primary_source · Retrieved: 2026-09-14

Status date: 2026-08-04

Open source 1

WATER AND COOLING

Fortitude Prosser Facility: water and cooling

operational

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

PERMITS AND JURISDICTION

Fortitude Prosser Facility: permits and jurisdiction

operational

Key data: Jurisdictions: Adams County | Nebraska

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

TIMELINE

Fortitude Prosser Facility: timeline

operational

Fortitude completes the acquisition of the 12.5 MW Prosser, Nebraska facility for $6.25 million in an asset purchase of the underlying real property; the asset was generating revenue at close

Claim classification: Not yet assigned

Status date: 2026-08-04