VERIFIED_PRIMARY
**Important correction for the master database:** the county memo indicates the approved use was corrected to gas generating facilities rather than a data center, with a maximum transmission line height of 199 feet.
Key data: Use corrected to **gas generating facilities**, not a data center; max transmission line height 199 ft
Limitation: Serving/interconnecting utility not named; whether a data center load is co-located remains unconfirmed.