Evidence record
Current operator lists Oklahoma campus in development with future 2028 energization. Fiscal 2026 operator filing identifies the 1600 MW development as Kiowa. Woods County archive label is not established by this source and is not separately admitted. Future power commitments are not operating load.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.