Compute Equity Atlas
← National map
Source-backed project record · OK

Jackson Technical ENGUARD Data Center

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
FIRST_PARTY_IDENTITY_GEOGRAPHY_HELDbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerJackson Technical
JurisdictionTulsa, OK
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesJackson Technical ENGUARD Data Center
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

Jackson Technical ENGUARD Data Center: site identity

Evidence record

Current operator offers own colocation and current in-house data-center engineering posting corroborates operation. Contact office address alone is not accepted as facility geography. Exact address and map eligibility remain withheld.

Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30

Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open source 1 →

Sources

Evidence and provenance

  • Jackson Technical ↗ · Retrieved 2026-10-30 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.
  • Jackson Technical ↗ · Retrieved 2026-10-30 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open OK state research →

Jackson Technical ENGUARD Data Center Data Center Project | Tulsa | Compute Equity Atlas