MARA Kearney (Tech oNE Crossing bitcoin mine)

This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
10linked evidence rows
Project facts

Location and operating record

Operator / developerMARA Holdings (formerly Marathon Digital Holdings)
JurisdictionKearney, NE
Address3215 Global Drive Place (per Baxtel directory listing); Tech oNE Crossing technology park
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesMARA Kearney (Tech oNE Crossing bitcoin mine) · Tech oNE Crossing Data Park · Marathon Digital Kearney · Compute North NE05 · GC Data Center Kearney
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

MARA Kearney (Tech oNE Crossing bitcoin mine): source record

operational

100 MW is an interruptible/flexible electrical load served by NPPD, recorded as requested_load_mw rather than IT load. Ownership chain runs Compute North (bankrupt 2022) to GC Data Center Kearney, LLC, with MARA as operator; the Project Horizon application lists Compute North NE05, LLC / GC Data Center Kearney, LLC as an owner of record. Street address is from a commercial directory only. Park size reported as a 200-acre shovel-ready park in earlier material and about 112 acres in 2026 reporting - conflict preserved.

Key data: Nebraska Public Power District (NPPD) | Southwest Power Pool (SPP)

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

OWNERSHIP AND PROFILE

MARA Kearney (Tech oNE Crossing bitcoin mine): ownership and profile

operational

Owner: Compute North NE05, LLC, now GC Data Center Kearney, LLC | County: Buffalo | Research region: Central Nebraska

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

POWER AND GRID

MARA Kearney (Tech oNE Crossing bitcoin mine): power and grid

operational

Key data: Utility: Nebraska Public Power District (NPPD) | Grid area: Southwest Power Pool (SPP) | Requested load MW: 100

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

WATER AND COOLING

MARA Kearney (Tech oNE Crossing bitcoin mine): water and cooling

operational

Key data: Cooling: Air-cooled

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

PERMITS AND JURISDICTION

MARA Kearney (Tech oNE Crossing bitcoin mine): permits and jurisdiction

operational

Key data: Jurisdictions: City of Kearney | Buffalo County | Nebraska

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

ENVIRONMENT AND SITE

MARA Kearney (Tech oNE Crossing bitcoin mine): environment and site

operational

Key data: Surrounding infrastructure: Adjacent solar farm

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

operational

Key data: Surrounding infrastructure: Tech oNE Crossing shovel-ready technology park developed by the City of Kearney with the Nebraska Department of Economic Development

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1

TIMELINE

MARA Kearney (Tech oNE Crossing bitcoin mine): timeline

operational

Compute North's Kearney site goes live at roughly 30 MW

Claim classification: Not yet assigned

Status date: 2019

Open source 1

operational

NPPD announces 70 MW of new electrical capacity for the Tech oNE Crossing Data Park, taking the site to about 100 MW

Claim classification: Not yet assigned

Status date: 2020-09-15

Open source 1

operational

Reporting describes the existing 100 MW cryptocurrency mine that Project Horizon would replace

Claim classification: Not yet assigned

Status date: 2026-09

Open source 1