Compute Equity Atlas
← National map
Source-backed project record · AZ

Meta Mesa Data Center Campus

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
FIRST_PARTY_IDENTITY_GEOGRAPHY_HELDbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerMeta
JurisdictionMesa, AZ
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesMeta Mesa Data Center Campus
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

Meta Mesa Data Center Campus: site identity

Evidence record

Operator announcement January 30, 2025 explicitly confirms Mesa serving traffic. One campus identity; no inferred power or third-party coordinates. Exact independently verified street geometry remains pending.

Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29

Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open source 1 →

Sources

Evidence and provenance

  • Meta ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.
  • Meta ↗ · Retrieved 2026-10-29 · FIRST PARTY
    Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.

Open AZ state research →

Meta Mesa Data Center Campus Data Center Project | Mesa | Compute Equity Atlas