Evidence record
Operator September 2026 update confirms early construction, earthwork and utility relocation at Silver Springs. Under construction at site-preparation phase, not operating or completed vertical buildings.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-29
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.