Muskie Data Campus

This record consolidates 7 research observations while retaining source distinctions, location precision and unresolved fields.

proposed_or_reviewproject status
SOURCE_BACKEDbest evidence tier
7linked evidence rows
Project facts

Location and operating record

Operator / developerTeraWulf
JurisdictionEastPark Industrial Park, Grayson, KY
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
Capacity1000 MW
AliasesMuskie Data Campus
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Muskie Data Campus: source record

LOCATION AND PROJECT EVIDENCE

Muskie Data Campus: location and project evidence

Source update

TeraWulf identifies Muskie Data Campus within EastPark Industrial Park in Grayson, Kentucky. Its May 26, 2026 acquisition announcement describes future power delivery and permitting activity; projected capacity is not presented as current operating load.

Claim classification: PRIMARY_SOURCE_OBSERVATION · Verification: FIELD_SCOPED_SOURCE_REVIEW · Retrieved: 2026-10-01

Status date: 2026-10-01

Limitation: Power capacity and other measurements are not inferred from site identity or construction forecasts.

Open source 1 →

Open source 2 →

OWNERSHIP AND PROFILE

Muskie Data Campus: ownership and profile

POWER AND GRID

Muskie Data Campus: power and grid

planned

Key data: Gross MW: 1000

Claim classification: Not yet assigned

Open source 1 →

WATER AND COOLING

Muskie Data Campus: water and cooling

PERMITS AND JURISDICTION

Muskie Data Campus: permits and jurisdiction

Sources

Evidence and provenance

  • TeraWulf ↗ · Retrieved 2026-10-01 · SOURCE BACKED
    Limitation: Only the fields described in this source observation were reviewed.
  • TeraWulf ↗ · Retrieved 2026-10-01 · SOURCE BACKED
    Limitation: Only the fields described in this source observation were reviewed.
  • Source record ↗ · SOURCE BACKED