Compute Equity Atlas
← National map
Source-backed project record · NV

Novva Tahoe Reno Data Center

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

unknownproject status
FIRST_PARTY_COMPLETED_SITE_NO_ENERGIZED_IT_LOAD_OR_GEObest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developerNovva Data Centers
JurisdictionStorey County, NV
AddressNot published
Location precisionlocality
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesNovva Tahoe Reno · Novva Tahoe Reno Campus
Evidence coverage

What has been researched

Project profile— rows
Intent / permits— rows
Civic / infrastructure0 rows
SITE IDENTITY

Novva Tahoe Reno Data Center: site identity

Evidence record

Operator on July 8 2025 identifies Novva Tahoe Reno as its fourth completed physical data center location, one 20 acre Storey County/TRIC campus, distinct from its existing North Las Vegas site. Six designed 10MW halls belong to this single physical location, not six separate facilities.

Claim classification: Not yet assigned · Verification: first_party_completed_single_facility · Retrieved: 2026-10-31

Limitation: Site completion and new 2026 capacity do not prove actual energized IT load or commissioning of any individual data hall.

Open source 1 →

LOCATION

Novva Tahoe Reno Data Center: location

Evidence record

Storey County at the Tahoe Reno Industrial Center. No independently approved public-domain rooftop/parcel point or exact street address.

Claim classification: Not yet assigned · Verification: first_party_locality_only · Retrieved: 2026-10-31

Limitation: No third-party or ODbL geometry promoted to public map.

Open source 1 →

Sources

Evidence and provenance

  • Novva Data Centers ↗ · Retrieved 2026-10-31 · FIRST PARTY ONE COMPLETED BUILDING
    Limitation: July 2025 describes a fourth completed location and 60 MW designed capacity over six halls. Actual energized IT MW, occupied halls and exact coordinates unverified.
  • Novva Data Centers ↗ · Retrieved 2026-10-31 · FIRST PARTY CURRENT CAMPUS
    Limitation: Current operator Tahoe Reno location page confirms 20 acre TRIC site, 180k sq ft white space and 100MW site substation, not 100 MW IT load.

Open NV state research →

Novva Tahoe Reno Data Center Data Center Project | Storey County | Compute Equity Atlas