planned
35 MW is the proposed co-located data center size reported by Nebraska Public Media; it is a proposed load, not a permitted or built capacity. A larger development directly east of the Olive Creek campus is described as coming later via a separate application and is not recorded as its own record because no location or size has been published. Utility left null: the site is near NPPD's Sheldon Power Station but no fetched source names the retail electric provider for the data center.
Key data: Southwest Power Pool (SPP)
Claim classification: Not yet assigned
Status date: 2026-09