PowerConneX III (430 MW)

This canonical record consolidates 2 source-backed observations without discarding aliases, limitations or unresolved dimensions.

proposed_or_reviewproject status
VERIFIED_PRIMARYbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developer~30 ac, up to ~430 MW; pcxenergynewalbanyIII@edgeconnex.com, +1 (703) 961-1046 Ext 10147
JurisdictionLicking County, OH
AddressNot published
Location precisionparcel or bounded site
Coordinatesnull, null
Capacity430 MW
AliasesPowerConneX III (430 MW)
Evidence coverage

What has been researched

Project profile1 rows
Intent / permits1 rows
Civic / infrastructure0 rows
EXACT LOCATION / OPERATOR / GENERAL CONTACT

PowerConneX III (430 MW): exact location / operator / general contact

VERIFIED_PRIMARY

EdgeConneX's New Albany North Campus Energy Center page describes PowerConneX New Albany 3 Energy Center as a ~30-acre, up to ~430 MW gas facility in Licking County that will be the primary electricity source for data centers on the same site, and publishes a project contact.

Key data: ~30 ac, up to ~430 MW; pcxenergynewalbanyIII@edgeconnex.com, +1 (703) 961-1046 Ext 10147

Limitation: Still pre-application at OPSB per trade reporting; no BGN case number published on the page.

Open source →

OTHER (pre-application behind-the-meter generation for data center campus)

PowerConneX III (430 MW): other (pre-application behind-the-meter generation for data center campus)

"Pre-Application"

Key data: 430 MW

Status date: Filing date: "Pre-application" (no date given)

Limitation: No date; PowerConneX I (25-0090-EL-BLN, 120 MW, approved 7/22/25) and II (25-0302-EL-BGN, 216 MW, approved 11/20/25) appear in the same table marked "Under Construction".

Open source →

Sources

Evidence and provenance

  • EdgeConneX / PowerConneX · VERIFIED PRIMARY
    Limitation: Still pre-application at OPSB per trade reporting; no BGN case number published on the page.
  • Ohio Power Siting Board (PUCO) · VERIFIED PRIMARY
    Limitation: No date; PowerConneX I (25-0090-EL-BLN, 120 MW, approved 7/22/25) and II (25-0302-EL-BGN, 216 MW, approved 11/20/25) appear in the same table marked "Under Construction".

Open OH state research →