PowerConneX III (430 MW)

This record consolidates 2 research observations while retaining source distinctions, location precision and unresolved fields.

unknownproject status
VERIFIED_PRIMARYbest evidence tier
2linked evidence rows
Project facts

Location and operating record

Operator / developer~30 ac, up to ~430 MW; pcxenergynewalbanyIII@edgeconnex.com, +1 (703) 961-1046 Ext 10147
JurisdictionLicking County, OH
AddressNot published
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity430 MW
AliasesPowerConneX III (430 MW)
Evidence coverage

What has been researched

Project profile1 rows
Intent / permits1 rows
Civic / infrastructure0 rows
EXACT LOCATION / OPERATOR / GENERAL CONTACT

PowerConneX III (430 MW): exact location / operator / general contact

VERIFIED_PRIMARY

EdgeConneX's New Albany North Campus Energy Center page describes PowerConneX New Albany 3 Energy Center as a ~30-acre, up to ~430 MW gas facility in Licking County that will be the primary electricity source for data centers on the same site, and publishes a project contact.

Key data: ~30 ac, up to ~430 MW; pcxenergynewalbanyIII@edgeconnex.com, +1 (703) 961-1046 Ext 10147

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Limitation: Still pre-application at OPSB per trade reporting; no BGN case number published on the page.

Open source 1 →

OTHER (pre-application behind-the-meter generation for data center campus)

PowerConneX III (430 MW): other (pre-application behind-the-meter generation for data center campus)

"Pre-Application"

Key data: 430 MW

Claim classification: Not yet assigned · Retrieved: 2026-08-29

Status date: Filing date: "Pre-application" (no date given)

Limitation: No date; PowerConneX I (25-0090-EL-BLN, 120 MW, approved 7/22/25) and II (25-0302-EL-BGN, 216 MW, approved 11/20/25) appear in the same table marked "Under Construction".

Open source 1 →

Sources

Evidence and provenance

  • EdgeConneX / PowerConneX ↗ · Retrieved 2026-08-29 · VERIFIED PRIMARY
    Limitation: Still pre-application at OPSB per trade reporting; no BGN case number published on the page.
  • Ohio Power Siting Board (PUCO) ↗ · Retrieved 2026-08-29 · VERIFIED PRIMARY
    Limitation: No date; PowerConneX I (25-0090-EL-BLN, 120 MW, approved 7/22/25) and II (25-0302-EL-BGN, 216 MW, approved 11/20/25) appear in the same table marked "Under Construction".

Open OH state research →

PowerConneX III (430 MW) Data Center Project | Licking County | Compute Equity Atlas