under_construction
Claim classification: Not yet assigned
This record consolidates 8 research observations while retaining source distinctions, location precision and unresolved fields.
| Operator / developer | Not established in current evidence |
|---|---|
| Jurisdiction | Santa Teresa CDP, NM |
| Address | Not published |
| Location precision | locality centroid |
| Coordinates | 31.87136, -106.673424 |
| Capacity | 2500 MW |
| Aliases | Project Jupiter (Stargate Santa Teresa Campus) |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
Claim classification: Not yet assigned
Oracle's September 14, 2026 statement distinguishes Project Jupiter's data-center campus from the adjacent proposed microgrid and says campus construction is continuing.
Key data: Oracle identifies the stayed proceeding as the microgrid air-permit application rather than the campus building permits. The microgrid is not another data-center building.
Claim classification: Attributed source observation · Verification: Listed fields reviewed; not a site inspection · Retrieved: 2026-10-03
Status date: 2026-09-14
Limitation: This is an attributed developer statement, not an independent legal determination. No whole-campus cancellation or force-majeure conclusion is adopted.
Claim classification: Not yet assigned
Key data: Gross MW: 2500
Claim classification: Not yet assigned
Claim classification: Not yet assigned
Claim classification: Not yet assigned