Project Lola

This record consolidates 10 research observations while retaining source distinctions, location precision and unresolved fields.

under_constructionproject status
CORROBORATEDbest evidence tier
10linked evidence rows
Project facts

Location and operating record

Operator / developerEdged Energy
JurisdictionCouncil Bluffs, IA
AddressNot published
Location precisionparcel or bounded site
CoordinatesNot published; no coordinate inferred
Capacity200 MW
AliasesProject Lola
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

Project Lola: source record

under_construction

building_sqft is the sum of two revised buildings of 285,445 sq ft each per DCD. DCD states the 200 MW plan was maintained after the size reduction; recorded as requested_load_mw because the source does not define it as IT load. Original plan was two 80-ft, 900,000 sq ft buildings.

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

OWNERSHIP AND PROFILE

Project Lola: ownership and profile

under_construction

Developer: Edged Energy | Permit applicant: EDC Omaha Landco LLC | County: Pottawattamie | Research region: Western Iowa / Omaha-Council Bluffs metro

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

POWER AND GRID

Project Lola: power and grid

under_construction

Key data: Gross MW: 200 | Requested load MW: 200 | Substations: Revised plan uses two owner-operated substations plus a switchyard (originally a requested MidAmerican Energy substation)

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

WATER AND COOLING

Project Lola: water and cooling

under_construction

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

PERMITS AND JURISDICTION

Project Lola: permits and jurisdiction

under_construction

Key data: Jurisdictions: Council Bluffs | Pottawattamie County | IA

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →

TIMELINE

Project Lola: timeline

under_construction

Council Bluffs approved an amendment reducing building size from ~450,000 to ~285,000 sq ft each and height from 80 ft to 36 ft 3 in

Claim classification: Not yet assigned

Status date: 2025-06

Open source 1 →

under_construction

First building topped out

Claim classification: Not yet assigned

Status date: 2026

Open source 1 →