| Operator / developer | Serverfarm |
|---|---|
| Jurisdiction | Clarksville city, AR |
| Address | Not published |
| Location precision | locality centroid |
| Coordinates | 35.453918, -93.481558 |
| Capacity | 200 MW |
| Aliases | Serverfarm Clarksville |
| Project profile | 0 rows |
|---|---|
| Intent / permits | 0 rows |
| Civic / infrastructure | 0 rows |
Claim classification: Not yet assigned
Serverfarm identifies ARK as its Clarksville campus and states that site construction is underway, with a January 2028 target for the first two buildings.
Key data: ARK1 through ARK4 are planned phases. Each listed 108 MW is a design figure, not a combined operating-load measurement.
Claim classification: Attributed source observation · Verification: Listed fields reviewed; not a site inspection · Retrieved: 2026-10-03
Limitation: The ARK name enriches the existing Clarksville identity instead of creating another campus record.
Claim classification: Not yet assigned
Key data: Gross MW: 200