Evidence record
Current developer identifies Electra DC as a 540-acre Laramie County data-center site with future gas and grid power phases. This matches the archive Truss Carpenter project identity by developer, county and site size, but no parcel-level binding or commissioned capacity is established. Proposed, not operating.
Claim classification: Not yet assigned · Verification: first_party_verified · Retrieved: 2026-10-30
Limitation: Operating power remains unknown. Census points, where available, are street-range interpolations, not rooftop or surveyed geometry.