This record consolidates 6 research observations while retaining source distinctions, location precision and unresolved fields.

operationalproject status
CORROBORATEDbest evidence tier
6linked evidence rows
Project facts

Location and operating record

Operator / developerUS Signal
JurisdictionWaukee, IA
Address390 NE Alice's Road
Location precisionstreet address
CoordinatesNot published; no coordinate inferred
CapacityNot established
AliasesUS Signal Des Moines (Waukee) Data Center · OneNeck IT Solutions Waukee · US Signal DSM
Evidence coverage

What has been researched

Project profile0 rows
Intent / permits0 rows
Civic / infrastructure0 rows
SOURCE RECORD

US Signal Des Moines (Waukee) Data Center: source record

operational

Aureon's list shows the facility under its former OneNeck name at 390 N. Alice's Rd, Waukee. US Signal's press release confirms a November 13, 2025 groundbreaking to add 6 MW; the existing facility's base capacity is not published, so it_load_mw is left null and the 6 MW increment is recorded in the timeline.

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

OWNERSHIP AND PROFILE

US Signal Des Moines (Waukee) Data Center: ownership and profile

operational

County: Dallas | Research region: Des Moines metro / Central Iowa

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

POWER AND GRID

US Signal Des Moines (Waukee) Data Center: power and grid

operational

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

WATER AND COOLING

US Signal Des Moines (Waukee) Data Center: water and cooling

operational

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

PERMITS AND JURISDICTION

US Signal Des Moines (Waukee) Data Center: permits and jurisdiction

operational

Key data: Jurisdictions: Waukee | Dallas County | IA

Claim classification: Not yet assigned

Status date: 2025-11

Open source 1

TIMELINE

US Signal Des Moines (Waukee) Data Center: timeline

operational

US Signal held a groundbreaking for a 6 MW expansion of its Des Moines-area data center, part of a $200M multi-market program

Claim classification: Not yet assigned

Status date: 2025-11-13

Open source 1