Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Tract Data Center

Silver Springs, NV · Fleet

Reported status: under construction

Reported capacity: 1200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-26

research-final:NV:ce58328791f413c0307c
Awaiting source review

Tract Silver Springs Data Center Park

Silver Springs, NV · Tract

Reported status: proposed

Reported capacity: 1.6 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:NV:83d04fee090f5163425f
Awaiting source review

Amazon Data Services Reno Data Center Campus

Sparks, NV · Amazon Web Services

Reported status: under construction

Exact location not published.

Original source · 2026-09-11

research-final:NV:aecca22793e19c8d9c2a
Accepted facility identity linked

Apple Reno Data Center (Reno Technology Park)

Sparks, NV · Apple

Reported status: operational

Exact location not published.

Original source · 2026-09-24

Read 1 source findings (2026-10-29)

Apple 2026 report pages 53 and 97 confirms its owned/operated Reno data center. Auditor address binds the Sparks site; Census returns no match. Historical certification is used for address identity only, not claimed currently valid. Evidence

Existing project record

research-final:NV:850b6e0850ea6723d89f
Awaiting source review

Novva Data Centers

Sparks, NV

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:NV:1e51b86842e582cf20ea
Awaiting source review

NV11–NV14 Data Center Campus

Sparks, NV

Reported status: proposed

Reported capacity: 224.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NV:6096260da1ff818e559a
Awaiting source review

South Valley Technology Park Data Center

Sparks, NV · Tract

Reported status: proposed

Reported capacity: 1200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NV:ebd41bb7013f79eb2a24
Awaiting source review

Tract Data Center

Sparks, NV

Reported status: proposed

Reported capacity: 810.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NV:75c52cf24a8a7012f179
Awaiting source review

NV LAS NAP 17 & 18 site — single-storey closed-loop water-cooled data center (Clark County permit BD24-61043)

Spring Valley, NV · NV LAS NAP 17 & 18 LLC

Reported status: under construction

Exact location not published.

Original source · 2026-09-21

research-final:NV:f69d5a4feaf51419abea
Awaiting source review

NV LAS NAP 17 — single-storey closed-loop water-cooled data center with office (Clark County permit BD25-00549)

Spring Valley, NV

Reported status: under construction

Exact location not published.

Original source · 2026-09-23

research-final:NV:c257fa352022e221f017
Awaiting source review

Switch

Spring Valley, NV · Switch

Reported status: existing (mapped + EPA air-permit record)

Exact location not published.

Original source · 2026-06-14

research-final:NV:9e15b68e098f06cd91b5
Awaiting source review

Switch12

Spring Valley, NV · Switch

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:NV:dcea7af641a96a024822
Awaiting source review

Apple Las Vegas

Sunrise Manor, NV · Apple Data Services LLC

Reported status: existing (mapped; status unverified)

Reported capacity: 220.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-14

research-final:NV:ffe65a0890c4366a484d
Awaiting source review

CenturyLink

Sunrise Manor, NV · Lumen Technologies

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

research-final:NV:2dd084d9984f24a502b3
Awaiting source review

Google Henderson (proposed)

Sunrise Manor, NV · Google LLC

Reported status: proposed

Reported capacity: 600.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-14

research-final:NV:ce5ef6ac9f09dcd3a65b
Awaiting source review

Verizon

Sunrise Manor, NV

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

research-final:NV:edcb05128c29b61bfb8c
Awaiting source review

Apple Inc

Unincorperated Washoe County, NV

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

research-final:NV:3276374e67cfbb3abb09
Awaiting source review

BluSky AI Wells Modular Data Center

Wells, NV · BluSky AI Inc.

Reported status: proposed

Exact location not published.

Original source · 2026-09-24

research-final:NV:6319f19f46e1f4f5c930
Awaiting source review

Monarch Data Center

Yerington, NV · Copia Power Devco, LLC

Reported status: proposed

Reported capacity: 1.0 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

research-final:NV:383ba605b9832467915a
Existing facility identity linked

Colovore RNO01 — first data center

, NV · Colovore

Reported status: operational

Exact location not published.

Original source · 2026-09-09

Existing project record

research-final:NV:11b97e93e1ad1a8c5c3c
Awaiting source review

Colovore RNO01 — second data center

, NV · Colovore

Reported status: under construction

Exact location not published.

Original source · 2026-09-09

research-final:NV:2e33ae35d77499c2e2f1
Awaiting source review

Google Data Center

, NV · Google

Reported status: operational

Exact location not published.

Original source · 2026-09-24

research-final:NV:db9412d026213d05d7ef
Awaiting source review

Peru Shelf Technology Park

, NV · Tract

Reported status: under construction

Reported capacity: 810 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-24

research-final:NV:d45a547252090ea608ac
Awaiting source review

Unnamed source-mapped location

, NV

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:NV:ef003284137d4747bca8
Awaiting source review

Stream Data Centers STAMP Campus

Alabama, NY · Stream Data Centers; Apollo Global Management

Reported status: proposed

Reported capacity: 500 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:NY:80288c659a4e2c385920
Accepted facility identity linked

Cogent Albany

Albany, NY · Cogent Communications

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Operator current directory explicitly classifies 89 Hannay Lane in Glenmont as its Albany data center, distinct from office and carrier-neutral listings. Census matches full primary street and ZIP. Evidence

Existing project record

research-final:NY:959b75f0d77dc0540c5a
Awaiting source review

IBM Building

Albany, NY

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:NY:330b05ba6da72b599ada
Awaiting source review

INOC Albany (11 North Pearl St)

Albany, NY · INOC, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:NY:8b23dce573d74022cd17
Accepted facility identity linked

INOC Albany (4 Tower Pl)

Albany, NY · INOC, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Operator identifies the operating ALB3 colocation facility at 4 Tower Place. Exact primary street and ZIP match Census. Generator capacity is not imported as IT load. Evidence

Existing project record

research-final:NY:0fad2021289ca38f047b
Accepted facility identity linked

INOC Albany (80 State St)

Albany, NY · INOC, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Operator identifies the operating ALB1 colocation facility at 80 State Street, distinct from ALB3. Primary facility address does not supply ZIP; Census matches the named street and state. North Pearl network POP and TurnKey DR archive aliases are not separately admitted. Evidence

Existing project record

research-final:NY:62d846ac3d40e961407e
Research database | Compute Equity Atlas