Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Kenwood Tech Center

Albany, NY · EKG Group LLC; Guild Ventures

Reported status: proposed

Reported capacity: 180 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

research-final:NY:323cea20fce3d91593d8
Awaiting source review

Lumen Albany 4

Albany, NY · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-07-23

research-final:NY:a758e60e046382509c6e
Awaiting source review

TurnKey Internet - DR

Albany, NY · Turnkey Internet Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:NY:7d1f075d2316ceb30f2e
Awaiting source review

BlackRock Amherst Data Center

Amherst, NY · BlackRock

Reported status: operational

Reported capacity: 2 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Erie County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

research-final:NY:86a49edcc63f285a15fc
Awaiting source review

BlackRock Data Center, Amherst (CrossPoint Business Park)

Amherst, NY · BlackRock, Inc.

Reported status: operational

Exact location not published.

Original source · 2026-10-09

research-final:NY:2e1c41f670bb687337e2
Awaiting source review

Frontier Science

Amherst, NY

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-12

research-final:NY:ef23e8dfcd0589d180b0
Awaiting source review

Hsbc Amherst Data Center

Amherst, NY

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:NY:3fddbb0329d9ec12a6a5
Awaiting source review

I-Evolve Technology Datacenter Amherst

Amherst, NY · I-Evolve Technology Services

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:NY:47d92589e74f7d6f5821
Awaiting source review

Lake Mariner CB-5 Current Build

Barker, NY

Reported status: under construction

Exact location not published.

Original source · 2026-08-05

research-final:NY:238fb7d7f6dbc95d60f7
Awaiting source review

TeraWulf Lake Mariner data campus

Barker, NY · TeraWulf

Reported status: operational

Exact location not published.

Original source · 2026-08-05

research-final:NY:3bb78ae633d224a083a7
Awaiting source review

Camp Monterey Data Center

Beaver Dams, NY · FLX Gateway

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

research-final:NY:fe70c5c58595bc0bde6a
Awaiting source review

70 Henry St

Binghamton, NY · Tier.Net Technologies LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-18

research-final:NY:4678b75e7d8203ff963f
Awaiting source review

Unnamed source-mapped location

Blauvelt, NY

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:NY:fed9154a167d38427c5c
Awaiting source review

Crown Castle Brentwood (1650 Islip)

Brentwood, NY · Crown Castle Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:NY:46cec874ea2629e82883
Accepted facility identity linked

DataVerge Brooklyn (Industry City)

Brooklyn, NY · DataVerge

Reported status: operational

Reported capacity: 10.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Read 1 source findings (2026-10-30)

Current operator identifies the active Brooklyn colocation building; location-specific contact section confirms full street and ZIP. Census matches both. Substation and backup generator figures are not IT load. Evidence

Existing project record

research-final:NY:51bbb1f03d39f2eedad1
Awaiting source review

Broome County Tech Park Data Center

Broome County, NY · The Agency Broome County IDA/LDC

Reported status: proposed

Reported capacity: 250 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

research-final:NY:76f936a3e72a5f0a1b79
Awaiting source review

Holtec Decommissioning International Data Center

Buchanan, NY

Reported status: proposed

Reported capacity: 200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:NY:c4cc5896667594662b7e
Awaiting source review

Holtec HI-CLOUD Indian Point data center campus (proposed)

Buchanan, NY · Holtec International (Holtec Decommissioning International)

Reported status: proposed

Reported capacity: 200 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-26

research-final:NY:1102173a30dfb0c71757
Awaiting source review

Indian Point Data Center Campus Redevelopment

Buchanan, NY · Holtec Decommissioning International; CHA Consulting

Reported status: proposed

Reported capacity: 200 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Buchanan. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

research-final:NY:e17a550e78c64e5b8210
Awaiting source review

325 Delaware Ave

Buffalo, NY · The Benchmark Group

Reported status: operational

Exact location not published.

Original source · 2026-06-18

research-final:NY:67cb258a5e3655267943
Awaiting source review

365 Data Centers Buffalo

Buffalo, NY · 365 Data Centers

Reported status: operational

Reported capacity: 0.812 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Buffalo. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:NY:38d3adcbe49f6bc44847
Awaiting source review

CentriLogic Buffalo (BUF)

Buffalo, NY · CentriLogic

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:NY:ce0644162b9a7bc5bc2c
Accepted facility identity linked

Cogent Buffalo

Buffalo, NY · Cogent Communications, Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Read 1 source findings (2026-10-30)

Current operator-hosted facility brochure identifies the Buffalo colocation facility at 271 Bristol Street with available cabinets and connectivity. ZIP is not supplied by this primary brochure. Census matches street and state; generator power is not imported as IT load. Evidence

Existing project record

research-final:NY:6b04a22916b633d98afc
Awaiting source review

ColoCrossing Buffalo Expansion

Buffalo, NY · ColoCrossing

Reported status: operational (expansion)

Reported capacity: 0.25 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

research-final:NY:dd90e9bc5c2990e601e2
Awaiting source review

Digihost — Erie County (Buffalo)

Buffalo, NY · Digihost (Digi Power X)

Reported status: operational

Reported capacity: 42 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-09

research-final:NY:58d39e769b3518294594
Awaiting source review

Empire AI Beta

Buffalo, NY · Empire AI consortium (hosted by the University at Buffalo, SUNY)

Reported status: operational

Exact location not published.

Original source · 2026-09-10

research-final:NY:dfddc716902b54544be0
Awaiting source review

Empire AI Gamma

Buffalo, NY · Empire AI consortium (hosted by the University at Buffalo, SUNY)

Reported status: under construction

Exact location not published.

Original source · 2026-09-10

research-final:NY:7317e0b894a1fe7e49fd
Accepted facility identity linked

H5 Data Centers Buffalo III (350 Main Street / Main Place Tower)

Buffalo, NY · H5 Data Centers (joint venture with Novacap)

Reported status: operational

Reported capacity: 1.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-09

Read 1 source findings (2026-10-29)

Current operator page identifies staffed colocation in Main Place Tower at 350 Main Street. Census returned two different Buffalo postal-city matches without an operator-verified ZIP; no point is selected. Other operator names within this carrier hotel are not separate physical locations. Evidence

Existing project record

research-final:NY:905457b93378a6e63b40
Awaiting source review

ixColo

Buffalo, NY · ixColo LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:NY:6ec2f906f83053cc2c1a
Awaiting source review

Tesla Dojo Supercomputer

Buffalo, NY

Reported status: cancelled

Exact location not published.

Original source · 2026-06-18

research-final:NY:5c4a4ab910e261365c27
Research database | Compute Equity Atlas