Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

CleanSpark New Salem Bitcoin Mine

Washington County, TN · CleanSpark; GRIID Infrastructure; Red Dog Technologies

Reported status: cancelled

Reported capacity: 25 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

research-final:TN:64834aa803cbae6f6ad8
Awaiting source review

CleanSpark Winfield Bitcoin Mining Facility

Winfield, TN · CleanSpark, Inc.

Reported status: operational

Exact location not published.

Original source · 2026-09-09

research-final:TN:5cf6b57b361d1485e2d6
Awaiting source review

Tennessee 264 MW Data Center

, TN · ENFRA; Meta Platforms, Inc.; Woolhawk LLC

Reported status: operational

Reported capacity: 264 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:TN:a2ed6909f6c858fa937a
Awaiting source review

xAI Colossus 1 (Memphis)

, TN · SpaceX

Reported status: operational

Exact location not published.

Original source · 2026-10-05

research-final:TN:38aae5ca23386696ec0d
Awaiting source review

xAI Colossus 2 (Memphis)

, TN · SpaceX

Reported status: operational

Exact location not published.

Original source · 2026-10-05

research-final:TN:731bf7d67c1ccc909c0e
Awaiting source review

Abernathy HPC campus (TeraWulf and Fluidstack joint venture)

Abernathy, TX · Fluidstack; TeraWulf

Reported status: under construction

Reported capacity: 240.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-02-27

research-final:TX:0d39ee70e2b2d3268fc1
Awaiting source review

Fluidstack Abernathy AI Campus

Abernathy, TX · Fluidstack

Reported status: under construction

Reported capacity: 168 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:3a077a4e5db688db40a8
Awaiting source review

Aligned Project Caprock

Abernathy area, TX · Aligned Data Centers

Reported status: under construction

Reported capacity: 540 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

research-final:TX:f0ddcb8ec9a709948a60
Awaiting source review

Abilene Data Center Buildings 9 & 10

Abilene, TX

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:26785ce927a5821947b9
Awaiting source review

Abilene Data Center Buildings B9B10

Abilene, TX

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:a425f3bfcfae0e3c1c32
Awaiting source review

Abilene Data Center Substation

Abilene, TX

Reported status: under construction (EPA site-work record)

Exact location not published.

Original source · 2026-10-28

research-final:TX:c44364ab479ee356b418
Awaiting source review

AT&T Data Center

Abilene, TX · AT&T

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:d26dc1f10da57c437960
Awaiting source review

Crusoe Abilene AI factory campus for Microsoft

Abilene, TX · Lancium

Reported status: under construction

Exact location not published.

Original source · 2026-07-15

research-final:TX:ec33c8aa510e1fff209a
Awaiting source review

Data Center Laydown Yard Dillon Rogers Phase 1 & Phase 2

Abilene, TX

Reported status: under construction (EPA site-work record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:24fc575de9e6718b93b6
Awaiting source review

Frontier Vantage Data Center

Abilene, TX

Reported status: under construction

Reported capacity: 1400.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:da5c8b2f00dbdaa775b4
Awaiting source review

Longhorn Data Center

Abilene, TX

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:b76ee4fcf52e0ac30439
Awaiting source review

Open AI/ SoftBank Stargate Data Center (Lancium Clean Campus)

Abilene, TX · Microsoft Corporation

Reported status: operational

Reported capacity: 1200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:e51747a11d13820872d5
Awaiting source review

Srm Data Center Cbp

Abilene, TX

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:0062dfa1fe3fb0bb7197
Awaiting source review

Stargate Abilene

Abilene, TX · Crusoe

Reported status: operational

Reported capacity: 1200 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-23

research-final:TX:8f07619aa65e2f8e9586
Awaiting source review

Stargate Abilene (Crusoe campus on Lancium land)

Abilene, TX · Lancium

Reported status: operational

Exact location not published.

Original source · 2026-10-05

research-final:TX:fa8fdab739177f0203eb
Awaiting source review

Stargate Project - Abilene Campus (Oracle/Crusoe)

Abilene, TX · OpenAI; Oracle; SoftBank; Crusoe; Lancium; Microsoft

Reported status: operational

Reported capacity: 1.2 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Abilene. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:TX:54e5e1aed80920f9de50
Awaiting source review

Argo Data Center

Afton, TX · Prime Data Centers

Reported status: existing (mapped + EPA facility record)

Reported capacity: 800.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:8d5664f761d35b5adffa
Awaiting source review

Coreweave Helios

Afton, TX

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-17

research-final:TX:49f572609bcd3a4fe6ec
Awaiting source review

Galaxy Helios Phase 2

Afton, TX · Galaxy Helios II LLC; Galaxy Digital

Reported status: under construction

Reported capacity: 400 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

research-final:TX:3d9d9cbcf783d33bb17b
Awaiting source review

Vantage Frontier Campus

Albany, TX · Vantage Data Centers

Reported status: under construction

Reported capacity: 1400 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-22

research-final:TX:9a19521d34769760c7ae
Awaiting source review

Center Point Energy Control Data Ctr

Aldine, TX

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:2200f8c63235fa00d098
Awaiting source review

Equinix HO1 — conversion of an interior storage room to additional data hall space (TABS2027004299)

Aldine, TX · Equinix

Reported status: proposed

Exact location not published.

Original source · 2026-10-23

research-final:TX:11f60ee72ebc2f6953db
Accepted facility identity linked

Centersquare Dallas (DFW2)

Allen, TX · CenterSquare (formerly Cyxtera)

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-30)

Current operator portfolio and specification sheet identify DFW2 at 900 Guardians Way. Evoque Allen DA1 archive row 4500 is an alias. No Census match for the operator street address; geography remains withheld. Evidence

Existing project record

research-final:TX:b6c7667cbe96839a09ed
Awaiting source review

Cisco Allen

Allen, TX

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:551a81af2cb7582f331d
Awaiting source review

CyrusOne Dallas (Allen)

Allen, TX · CyrusOne Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:327fcbd3f7a734de9103
Research database | Compute Equity Atlas