Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Awaiting source reviewCleanSpark New Salem Bitcoin Mine
Washington County, TN · CleanSpark; GRIID Infrastructure; Red Dog Technologies
Reported status: cancelled
Reported capacity: 25 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
research-final:TN:64834aa803cbae6f6ad8Awaiting source reviewCleanSpark Winfield Bitcoin Mining Facility
Winfield, TN · CleanSpark, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-09-09
research-final:TN:5cf6b57b361d1485e2d6Awaiting source reviewTennessee 264 MW Data Center
, TN · ENFRA; Meta Platforms, Inc.; Woolhawk LLC
Reported status: operational
Reported capacity: 264 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
research-final:TN:a2ed6909f6c858fa937aAwaiting source reviewxAI Colossus 1 (Memphis)
, TN · SpaceX
Reported status: operational
Exact location not published.
Original source · 2026-10-05
research-final:TN:38aae5ca23386696ec0dAwaiting source reviewxAI Colossus 2 (Memphis)
, TN · SpaceX
Reported status: operational
Exact location not published.
Original source · 2026-10-05
research-final:TN:731bf7d67c1ccc909c0eAwaiting source reviewAbernathy HPC campus (TeraWulf and Fluidstack joint venture)
Abernathy, TX · Fluidstack; TeraWulf
Reported status: under construction
Reported capacity: 240.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-02-27
research-final:TX:0d39ee70e2b2d3268fc1Awaiting source reviewFluidstack Abernathy AI Campus
Abernathy, TX · Fluidstack
Reported status: under construction
Reported capacity: 168 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
research-final:TX:3a077a4e5db688db40a8Awaiting source reviewAligned Project Caprock
Abernathy area, TX · Aligned Data Centers
Reported status: under construction
Reported capacity: 540 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
research-final:TX:f0ddcb8ec9a709948a60Awaiting source reviewAbilene Data Center Buildings 9 & 10
Abilene, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:26785ce927a5821947b9Awaiting source reviewAbilene Data Center Buildings B9B10
Abilene, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:a425f3bfcfae0e3c1c32Awaiting source reviewAbilene Data Center Substation
Abilene, TX
Reported status: under construction (EPA site-work record)
Exact location not published.
Original source · 2026-10-28
research-final:TX:c44364ab479ee356b418Awaiting source reviewAT&T Data Center
Abilene, TX · AT&T
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:d26dc1f10da57c437960Awaiting source reviewCrusoe Abilene AI factory campus for Microsoft
Abilene, TX · Lancium
Reported status: under construction
Exact location not published.
Original source · 2026-07-15
research-final:TX:ec33c8aa510e1fff209aAwaiting source reviewData Center Laydown Yard Dillon Rogers Phase 1 & Phase 2
Abilene, TX
Reported status: under construction (EPA site-work record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:24fc575de9e6718b93b6Awaiting source reviewFrontier Vantage Data Center
Abilene, TX
Reported status: under construction
Reported capacity: 1400.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:da5c8b2f00dbdaa775b4Awaiting source reviewLonghorn Data Center
Abilene, TX
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:b76ee4fcf52e0ac30439Awaiting source reviewOpen AI/ SoftBank Stargate Data Center (Lancium Clean Campus)
Abilene, TX · Microsoft Corporation
Reported status: operational
Reported capacity: 1200.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:e51747a11d13820872d5Awaiting source reviewSrm Data Center Cbp
Abilene, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:0062dfa1fe3fb0bb7197Awaiting source reviewStargate Abilene
Abilene, TX · Crusoe
Reported status: operational
Reported capacity: 1200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-23
research-final:TX:8f07619aa65e2f8e9586Awaiting source reviewStargate Abilene (Crusoe campus on Lancium land)
Abilene, TX · Lancium
Reported status: operational
Exact location not published.
Original source · 2026-10-05
research-final:TX:fa8fdab739177f0203ebAwaiting source reviewStargate Project - Abilene Campus (Oracle/Crusoe)
Abilene, TX · OpenAI; Oracle; SoftBank; Crusoe; Lancium; Microsoft
Reported status: operational
Reported capacity: 1.2 GW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Abilene. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:54e5e1aed80920f9de50Awaiting source reviewArgo Data Center
Afton, TX · Prime Data Centers
Reported status: existing (mapped + EPA facility record)
Reported capacity: 800.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:8d5664f761d35b5adffaAwaiting source reviewCoreweave Helios
Afton, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-17
research-final:TX:49f572609bcd3a4fe6ecAwaiting source reviewGalaxy Helios Phase 2
Afton, TX · Galaxy Helios II LLC; Galaxy Digital
Reported status: under construction
Reported capacity: 400 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
research-final:TX:3d9d9cbcf783d33bb17bAwaiting source reviewVantage Frontier Campus
Albany, TX · Vantage Data Centers
Reported status: under construction
Reported capacity: 1400 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-22
research-final:TX:9a19521d34769760c7aeAwaiting source reviewCenter Point Energy Control Data Ctr
Aldine, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:2200f8c63235fa00d098Awaiting source reviewEquinix HO1 — conversion of an interior storage room to additional data hall space (TABS2027004299)
Aldine, TX · Equinix
Reported status: proposed
Exact location not published.
Original source · 2026-10-23
research-final:TX:11f60ee72ebc2f6953dbAccepted facility identity linkedCentersquare Dallas (DFW2)
Allen, TX · CenterSquare (formerly Cyxtera)
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Read 1 source findings (2026-10-30)
Current operator portfolio and specification sheet identify DFW2 at 900 Guardians Way. Evoque Allen DA1 archive row 4500 is an alias. No Census match for the operator street address; geography remains withheld. Evidence
Existing project record
research-final:TX:b6c7667cbe96839a09edAwaiting source reviewCisco Allen
Allen, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:551a81af2cb7582f331dAwaiting source reviewCyrusOne Dallas (Allen)
Allen, TX · CyrusOne Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:327fcbd3f7a734de9103