Digital Realty AUS11
Austin, TX · Digital Realty
Reported status: operational
Reported capacity: 16.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-23
research-final:TX:2944989e1cdcfb6d9fbc6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.
Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Austin, TX · Digital Realty
Reported status: operational
Reported capacity: 16.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-23
research-final:TX:2944989e1cdcfb6d9fbcAustin, TX · Digital Realty Trust, Inc.
Reported status: existing (mapped; status unverified)
Reported capacity: 220.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:c1967f0ad5b4f5c45d8dAustin, TX · Element Critical
Reported status: operational
Reported capacity: 5 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
research-final:TX:77e661adbff332078444Austin, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:ff97402bef82f0926581Austin, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:82b27e841d733931937eAustin, TX · Lumen Technologies Inc
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:0300a6005ee153ce1584Austin, TX · LightEdge Solutions
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Current operator lists operating Austin 2 at 7000-B Burleson Road, Suite 100. Census returned 7000 without the B building component; no point published. Evidence
Austin, TX · Lumen Technologies
Reported status: operational
Exact location not published.
Original source · 2026-07-23
research-final:TX:8380bb926edd4c7d1d12Austin, TX · Lumen Technologies
Reported status: operational
Exact location not published.
Original source · 2026-07-22
research-final:TX:119c90ec8dc541db4448Austin, TX · Oracle Corporation
Reported status: operational
Exact location not published.
Original source · 2026-06-18
research-final:TX:1eb8b7158669bf651d1aAustin, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:8ecf655f5ad4380d74d7Austin, TX · Tesla
Reported status: under construction
Reported capacity: 500 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
research-final:TX:c00064c6e19af311fe54Barstow, TX · IONIC Digital
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:68d97cf4d18e8ddd927bBarstow, TX · Fidelis/Nscale
Reported status: under construction
Reported capacity: 240.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:96bf0a479a8dd75df7b0Bastrop, TX · EdgeConneX, Inc.
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
research-final:TX:3268c25572fc669167cfBay City, TX · MARA Holdings
Reported status: proposed
Reported capacity: 1000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-07-26
research-final:TX:1ca8e779a43198299b12Baytown, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:348d55c48109cf6cdba3Bear Creek Ranch, TX · Compass Datacenters, LLC
Reported status: existing (mapped; status unverified)
Reported capacity: 350.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:5a90ce3bd9d9cc7c0283Bear Creek Ranch, TX · Compass Datacenters DFW III-I LLC
Reported status: proposed
Exact location not published.
Original source · 2026-10-15
research-final:TX:f9645b72666ee39d855eBear Creek Ranch, TX · Compass Datacenters DFW IIIJ LLC
Reported status: proposed
Exact location not published.
Original source · 2026-10-15
research-final:TX:4de548dbcd09518e5a7aBear Creek Ranch, TX · Compass Datacenters DFW IIIH LLC
Reported status: proposed
Exact location not published.
Original source · 2026-10-15
research-final:TX:3c4764c2349606f10380Bear Creek Ranch, TX
Reported status: under construction
Exact location not published.
Original source · 2026-07-26
research-final:TX:9f0c46cf1f10d7d0cebcBear Creek Ranch, TX · STACK Infrastructure
Reported status: proposed
Exact location not published.
Original source · 2026-10-05
research-final:TX:6def807011e6df89ca23Bellville, TX · CleanSpark, Inc.
Reported status: proposed
Reported capacity: 285 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-25
research-final:TX:2fbc41c55f6f6613b719Benbrook, TX · EDC Fort Worth LLC
Reported status: approved/permitted
Exact location not published.
Original source · 2026-10-22
research-final:TX:96f3ed9827d8130bc1d7Benbrook, TX · EDC Fort Worth LLC
Reported status: proposed
Exact location not published.
Original source · 2026-09-14
research-final:TX:14ac60185fd9ff16a4c3Big Spring, TX · Midas Compute
Reported status: proposed
Exact location not published.
Original source · 2026-09-16
research-final:TX:f3dc05a4e2352bee737eBoling, TX · Amazon Data Services, Inc.
Reported status: proposed
Exact location not published.
Original source · 2026-08-25
research-final:TX:9c48b7fa010ee0ce6e35Brady, TX · Cipher Digital
Reported status: proposed
Exact location not published.
Original source · 2026-07-17
research-final:TX:d26564cac3cf0dead9feBrenham, TX · Viridien
Reported status: proposed
Reported capacity: 45.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:33bda5d013afea0fad03