Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Digital Realty AUS11

Austin, TX · Digital Realty

Reported status: operational

Reported capacity: 16.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-23

research-final:TX:2944989e1cdcfb6d9fbc
Awaiting source review

Digital Realty Austin Campus

Austin, TX · Digital Realty Trust, Inc.

Reported status: existing (mapped; status unverified)

Reported capacity: 220.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:c1967f0ad5b4f5c45d8d
Awaiting source review

Element Critical Austin One

Austin, TX · Element Critical

Reported status: operational

Reported capacity: 5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

research-final:TX:77e661adbff332078444
Awaiting source review

Hewlett Packard Austin Data Center 2

Austin, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:ff97402bef82f0926581
Awaiting source review

Home Depot-Austin Data Center

Austin, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:82b27e841d733931937e
Awaiting source review

Level(3) Austin (Kramer)

Austin, TX · Lumen Technologies Inc

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:0300a6005ee153ce1584
Accepted facility identity linked

LightEdge Austin II

Austin, TX · LightEdge Solutions

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 1 source findings (2026-10-29)

Current operator lists operating Austin 2 at 7000-B Burleson Road, Suite 100. Census returned 7000 without the B building component; no point published. Evidence

Existing project record

research-final:TX:ae97f89eebc77c14d8b4
Awaiting source review

Lumen Austin 1

Austin, TX · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-07-23

research-final:TX:8380bb926edd4c7d1d12
Awaiting source review

Lumen Austin 3

Austin, TX · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-07-22

research-final:TX:119c90ec8dc541db4448
Awaiting source review

ORACLE-AUSTIN DATA CENTER

Austin, TX · Oracle Corporation

Reported status: operational

Exact location not published.

Original source · 2026-06-18

research-final:TX:1eb8b7158669bf651d1a
Awaiting source review

Sungard Internet Data Center

Austin, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:8ecf655f5ad4380d74d7
Awaiting source review

Tesla Cortex 2.0 AI Training Cluster (Giga Texas)

Austin, TX · Tesla

Reported status: under construction

Reported capacity: 500 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

research-final:TX:c00064c6e19af311fe54
Awaiting source review

IONIC Digital Cedarvale

Barstow, TX · IONIC Digital

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:68d97cf4d18e8ddd927b
Awaiting source review

Nscale Cedarvale (Barstow)

Barstow, TX · Fidelis/Nscale

Reported status: under construction

Reported capacity: 240.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:96bf0a479a8dd75df7b0
Awaiting source review

EdgeConneX potential Data Center

Bastrop, TX · EdgeConneX, Inc.

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

research-final:TX:3268c25572fc669167cf
Awaiting source review

Site MAT 1177

Bay City, TX · MARA Holdings

Reported status: proposed

Reported capacity: 1000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-07-26

research-final:TX:1ca8e779a43198299b12
Awaiting source review

Gccisd New Technology Data Center

Baytown, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:348d55c48109cf6cdba3
Awaiting source review

Compass Data Center

Bear Creek Ranch, TX · Compass Datacenters, LLC

Reported status: existing (mapped; status unverified)

Reported capacity: 350.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:5a90ce3bd9d9cc7c0283
Awaiting source review

Compass DFW III Building 10 — interior/tenant fit-out

Bear Creek Ranch, TX · Compass Datacenters DFW III-I LLC

Reported status: proposed

Exact location not published.

Original source · 2026-10-15

research-final:TX:f9645b72666ee39d855e
Awaiting source review

Compass DFW III Building 8 — interior/tenant fit-out

Bear Creek Ranch, TX · Compass Datacenters DFW IIIJ LLC

Reported status: proposed

Exact location not published.

Original source · 2026-10-15

research-final:TX:4de548dbcd09518e5a7a
Awaiting source review

Compass DFW III Building 9 — interior/tenant fit-out

Bear Creek Ranch, TX · Compass Datacenters DFW IIIH LLC

Reported status: proposed

Exact location not published.

Original source · 2026-10-15

research-final:TX:3c4764c2349606f10380
Awaiting source review

DataBank Red Oak First-Phase Current Construction

Bear Creek Ranch, TX

Reported status: under construction

Exact location not published.

Original source · 2026-07-26

research-final:TX:9f0c46cf1f10d7d0cebc
Awaiting source review

STACK DFW02B

Bear Creek Ranch, TX · STACK Infrastructure

Reported status: proposed

Exact location not published.

Original source · 2026-10-05

research-final:TX:6def807011e6df89ca23
Awaiting source review

CleanSpark Austin County AI Data Center Campus

Bellville, TX · CleanSpark, Inc.

Reported status: proposed

Reported capacity: 285 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-25

research-final:TX:2fbc41c55f6f6613b719
Awaiting source review

Edged Fort Worth Project Outpost Building 1 — 488,770 sq ft data-centre cold dark shell (permit PB26-06984)

Benbrook, TX · EDC Fort Worth LLC

Reported status: approved/permitted

Exact location not published.

Original source · 2026-10-22

research-final:TX:96f3ed9827d8130bc1d7
Awaiting source review

Edged Fort Worth Project Outpost Building 2

Benbrook, TX · EDC Fort Worth LLC

Reported status: proposed

Exact location not published.

Original source · 2026-09-14

research-final:TX:14ac60185fd9ff16a4c3
Awaiting source review

Midas Compute Big Spring Facility — proposed AI computing facility with on-site natural-gas generation (TCEQ air permit 185376 pending)

Big Spring, TX · Midas Compute

Reported status: proposed

Exact location not published.

Original source · 2026-09-16

research-final:TX:f3dc05a4e2352bee737e
Awaiting source review

AWS Project Eagle (Wharton County)

Boling, TX · Amazon Data Services, Inc.

Reported status: proposed

Exact location not published.

Original source · 2026-08-25

research-final:TX:9c48b7fa010ee0ce6e35
Awaiting source review

Cipher Mikeska HPC Data Center

Brady, TX · Cipher Digital

Reported status: proposed

Exact location not published.

Original source · 2026-07-17

research-final:TX:d26564cac3cf0dead9fe
Awaiting source review

Viridien Data Center

Brenham, TX · Viridien

Reported status: proposed

Reported capacity: 45.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:33bda5d013afea0fad03
Research database | Compute Equity Atlas