FIBERTOWN Bryan Data Center
Bryan, TX · FIBERTOWN
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:1409f88feb25cacb0c3a6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.
Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Bryan, TX · FIBERTOWN
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:1409f88feb25cacb0c3aBryan, TX · ThisWay Global, Inc.
Reported status: under construction
Exact location not published.
Original source · 2026-08-25
research-final:TX:4510f56a694fbb6b96bdBryan, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:366693237c2709be8852Burlington, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:47dea61610b36c3d3393Burlington, TX
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:TX:0955f19356475c11a9c2Burlington, TX
Reported status: proposed
Reported capacity: 1500.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:34a899aa27dd29521ad5Burlington, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:9b9c3ea4aa33b49dcf70Burlington, TX · SB Energy (SoftBank)
Reported status: under construction
Reported capacity: 1200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-23
research-final:TX:60213673eb922de24cd2Cameron, TX
Reported status: under construction
Exact location not published.
Original source · 2026-10-01
research-final:TX:81036a4a80725116b99cCameron, TX · OpenAI / SoftBank (SB Energy)
Reported status: under construction
Reported capacity: 1200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-16
research-final:TX:11b7bf6aea16886fa7a8Carrollton, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:37d6044ca30995969e8dCarrollton, TX · CyrusOne Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:TX:4a483a26ec332d8a2463Carrollton, TX · CyrusOne Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
research-final:TX:86e54b0f342326b16206Carrollton, TX · Digital Realty Trust, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Current operator facility page and Dallas portfolio bind this distinct colocation facility to its full street address. No campus-wide capacity or building square footage is treated as operating IT load. Evidence
Carrollton, TX · Digital Realty Trust, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Current operator facility page and Dallas portfolio bind this distinct colocation facility to its full street address. No campus-wide capacity or building square footage is treated as operating IT load. Evidence
Carrollton, TX
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:TX:6ff4f6c8cf81598a5763Castroville, TX · CyrusOne LLC
Reported status: existing (mapped; status unverified)
Reported capacity: 32.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:fea3022550799c6ea5f8Castroville, TX · CyrusOne
Reported status: proposed
Exact location not published.
Original source · 2026-10-14
research-final:TX:34b47676f10722f6b6f0Castroville, TX · Microsoft Corporation
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-18
research-final:TX:16b3c20de9e1993c7f0cCastroville, TX · Microsoft Corporation
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
research-final:TX:673139bbac0dbc96f92bCastroville, TX · Microsoft
Reported status: under construction
Exact location not published.
Original source · 2026-10-22
research-final:TX:05e29a1d98b65ee71072Castroville, TX · Microsoft
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:TX:1b3e5cb949ddc00f8850Castroville, TX · Microsoft
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:TX:8f8f88a4eb367aa6dabeCastroville, TX · Microsoft Data Center LLC
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
research-final:TX:5f6be9dd91eabeeae5c3Castroville, TX
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
research-final:TX:30d9b836c31dbd9ffc6aCastroville, TX · Vantage Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:TX:952f67dc92c4b17e0b49Castroville Area, TX · Microsoft
Reported status: under construction
Reported capacity: 200 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Castroville. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:336bff9cc67ceca3c06cCastroville area, TX · Tract
Reported status: proposed
Reported capacity: 500 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Castroville. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:1d7cadcf89b282b4a71bCedar Creek, TX · EdgeConneX
Reported status: under construction
Reported capacity: 384 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-16
research-final:TX:61fd35a8686b683c0fe1Cedar Creek, TX · EdgeConneX
Reported status: proposed
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Cedar Creek. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:TX:04c39cc9492acf0f257d