Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

DXC Technology

Jersey Village, TX · DXC Technology

Reported status: existing (mapped; status unverified)

Reported capacity: 40.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:22224a0213fbdd491de3
Awaiting source review

Unnamed source-mapped location

Jersey Village, TX · DXC Technology

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:TX:e0fc5f15e7e47a325da3
Awaiting source review

EdgeConneX Houston (EDCHOU01)

Katy, TX · EdgeConneX Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:fcb35cb385d43adaccdd
Awaiting source review

Element Critical Houston HOU1

Katy, TX · Element Critical, LLC

Reported status: operational

Exact location not published.

Original source · 2025-09-26

research-final:TX:ff55fbef4ab2c4233920
Awaiting source review

Skybox Houston One

Katy, TX · Skybox Datacenters

Reported status: operational

Reported capacity: 26 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

research-final:TX:87d6e542d544853a540d
Awaiting source review

Cipher Black Pearl

Kermit, TX · Cipher Mining

Reported status: operational

Reported capacity: 300.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:ec214c35871275ed0fd8
Awaiting source review

Onmine Data Center

Killen, TX

Reported status: rejected/denied

Exact location not published.

Original source · 2026-06-18

research-final:TX:29b33f4de9a07bdb0cfc
Awaiting source review

Lan01 Lancaster Data Center

Lancaster, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:4b5c60f984c59d00ac1b
Awaiting source review

Lancaster Data Center

Lancaster, TX

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:1cec2557724274b95271
Awaiting source review

PowerCampus Dallas

Lancaster, TX · Skybox Datacenters with Bandera Ventures

Reported status: under construction

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

research-final:TX:7aeb7d9b077be9fee6f0
Awaiting source review

PowerCampus Dallas by Lancaster Data Center Campus LP

Lancaster, TX

Reported status: operational

Reported capacity: 300.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:5b1f95461384cabaa86c
Awaiting source review

Project Labrador (WHL Dallas 45 LLC)

Lancaster, TX

Reported status: proposed

Reported capacity: 252.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:c675719333aa15d5913e
Awaiting source review

Qts Dfw 2 Data Center Substation Project

Lancaster, TX

Reported status: under construction (EPA site-work record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:deace6f1141fe17ac727
Awaiting source review

QTS Wilmer (DFW2 and DC1)

Lancaster, TX

Reported status: operational

Exact location not published.

Original source · 2026-06-18

research-final:TX:51abedc0e889d0ff6b02
Awaiting source review

STACK DFW02 (Lancaster)

Lancaster, TX · STACK Infrastructure

Reported status: under construction

Reported capacity: 500 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-26

research-final:TX:3b5ee27f6f505fa33187
Awaiting source review

STACK South Dallas (Lancaster)

Lancaster, TX · Stack Infrastructure, Inc.

Reported status: under construction

Reported capacity: 220.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:39b13aa7b26bae9d1e57
Awaiting source review

Data City, Texas

Laredo, TX · Energy Abundance Development Corporation

Reported status: proposed

Reported capacity: 5000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

research-final:TX:b98900888fa4cc0411d3
Awaiting source review

Laredo VTX

Laredo, TX · Laredo VTX

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:8c35eea708a78e34fda8
Awaiting source review

MDC Laredo

Laredo, TX · MDC Data Centers

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:c881ba1434fbf0c24cd3
Awaiting source review

Amazon

Leon Valley, TX · Amazon.com, Inc.

Reported status: existing (mapped + EPA facility record)

Exact location not published.

Original source · 2026-06-18

research-final:TX:ae0409afe4b89aa1c4e8
Awaiting source review

CHRISTUS Health

Leon Valley, TX · CHRISTUS Health

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:1fb2b9c0afdad5b4f37e
Awaiting source review

CyrusOne San Antonio III

Leon Valley, TX · CyrusOne LLC

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-08-25

research-final:TX:6ec4802f89257e97cea6
Awaiting source review

Frost Bank

Leon Valley, TX · Frost Bank

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:4549de2b1bb0595c2e31
Awaiting source review

Lowe's Data Center

Leon Valley, TX · Prime Data Centers

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:693c7435b1300d707006
Awaiting source review

Stream San Antonio II

Leon Valley, TX · Stream Data Centers

Reported status: operational

Reported capacity: 10.80 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:31e2f83ca740390d05df
Awaiting source review

Texas Cryptologic Center

Leon Valley, TX · National Security Agency

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:437e61238ea7ad6318de
Awaiting source review

Unnamed source-mapped location

Leon Valley, TX · CHRISTUS Health

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:TX:4bafe20945978304eb2b
Awaiting source review

Valero Wiserman

Leon Valley, TX · Valero

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:ddf6167d5c128d0bb30a
Awaiting source review

Lewisville Data Center

Lewisville, TX

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

research-final:TX:da4c0c7daf94354711b4
Awaiting source review

Lexington Data Center

Lexington, TX

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

research-final:TX:048a02144a9acc0a14c1
Research database | Compute Equity Atlas