Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Awaiting source review

Google Wilbarger County Data Center

Vernon area, TX · Google; AES

Reported status: under construction

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Vernon. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:TX:8a9398aabe2bfed0a311
Awaiting source review

Crusoe Victoria AI Factory

Victoria, TX · Crusoe

Reported status: proposed

Reported capacity: 1500 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:6b70d08c5a72c0d94b20
Awaiting source review

Crusoe/ Blue Energy Data Center

Victoria, TX · Crusoe

Reported status: proposed

Reported capacity: 1500.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:7eb024915fd55136d26c
Awaiting source review

Cipher McLennan HPC Data Center

Waco, TX · Cipher Digital

Reported status: proposed

Reported capacity: 500 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-16

research-final:TX:82a356d683ebb33cd301
Awaiting source review

DataBank Waco (ACT1)

Waco, TX · DataBank, Ltd.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

research-final:TX:3aa85995639727ae77d8
Awaiting source review

LandBridge / PowerBridge Alpha Digital Data Center Campus

Waha area, TX · LandBridge; PowerBridge; Alpha Digital

Reported status: proposed

Reported capacity: 2.0 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Reeves County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

research-final:TX:24e84c3f92e1f06822d1
Awaiting source review

DXC Technology

Waller, TX · DXC Technology

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

research-final:TX:a9d9f86a6cdd10213419
Awaiting source review

Unnamed source-mapped location

Waller, TX · DXC Technology

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:TX:a59b27ecb7e4384d85b6
Awaiting source review

Google Armstrong County (Meitner Energy Center)

Wayside, TX · Google LLC

Reported status: under construction

Reported capacity: 1000.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:2d700424c6a5b07f964c
Awaiting source review

Texas Critical Data Centers (TCDC)

West Odessa, TX · Sharon AI + New Era Energy & Digital (joint venture)

Reported status: proposed

Reported capacity: 250 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:6de3c6aa7368186a6852
Awaiting source review

PowerHouse Circle T Data Center Campus

Westlake, TX · PowerHouse Data Centers

Reported status: proposed

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-08

research-final:TX:3cf998eb81d73b581853
Awaiting source review

CyrusOne & Calpine - DFW10 Whitney Campus

Whitney, TX · CyrusOne; Calpine

Reported status: under construction

Reported capacity: 190 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

research-final:TX:9386ec8f7ddd42792a4c
Awaiting source review

CyrusOne Data Centre Campus

Whitney, TX · CyrusOne

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:c68699aa99bab234235c
Awaiting source review

DFW-10 Data Center

Whitney, TX

Reported status: proposed

Reported capacity: 190.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

research-final:TX:791c977c1fdda5838aef
Awaiting source review

Skybox PowerCampus Texas - Wichita Falls

Wichita Falls, TX · Skybox Datacenters; Blue Owl Capital

Reported status: proposed

Reported capacity: 800 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Wichita Falls. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

research-final:TX:c29a60d097092a663484
Awaiting source review

Unnamed source-mapped location

Wichita Falls, TX

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:TX:5e312deed523af32ab65
Awaiting source review

Willis Data Center (Comcast)

Willis, TX

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

research-final:TX:7db7551908c228c25227
Awaiting source review

QTS DFW2 DC7

Wilmer, TX · QTS Data Centers

Reported status: proposed

Exact location not published.

Original source · 2026-09-22

research-final:TX:c888073d96992e3e112a
Awaiting source review

Project Longhorn Building One

Wyldwood, TX

Reported status: proposed

Exact location not published.

Original source · 2026-10-07

research-final:TX:90156f909500f269c56d
Awaiting source review

Unnamed research feature in TX

, TX

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

research-final:TX:0da3d0fd0ba5f958dbb9
Awaiting source review

Cipher Digital Stingray Data Center Current Build

, TX

Reported status: under construction

Exact location not published.

Original source · 2026-08-04

research-final:TX:74198eb6a99abb648983
Awaiting source review

Core Scientific Pecos Initial HDC Current Build

, TX

Reported status: under construction

Exact location not published.

Original source · 2026-06-02

research-final:TX:587428c9e383f449a37a
Awaiting source review

CyrusOne Data Center Campus

, TX · CyrysOne

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

research-final:TX:96adbfaf7eb177cc7ee4
Awaiting source review

Galaxy Helios Phase II 260 MW Critical IT Build

, TX

Reported status: under construction

Exact location not published.

Original source · 2026-08-12

research-final:TX:c2455542336f2a006c43
Awaiting source review

Google Journey data center campus (Haskell County)

, TX · Homebound Group LLC

Reported status: under construction

Exact location not published.

Original source · 2026-06-25

research-final:TX:0cb04d0e1ce3fc87fc8b
Awaiting source review

GW Ranch

, TX · Pacifico Energy

Reported status: proposed

Reported capacity: 7650 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:TX:86a3abf49fc4269d44d4
Accepted facility identity linked

Hut 8 Salt Creek Facility

, TX · American Bitcoin (Hut 8)

Reported status: operational

Reported capacity: 63 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Read 1 source findings (2026-10-30)

June 2026 issuer filing identifies Salt Creek in Orla as an operating ASIC compute site; current operator portfolio retains the facility. Exact geography remains unverified, so coordinates and map eligibility are withheld. Evidence

Existing project record

research-final:TX:0ee4d72f788e155ac32b
Awaiting source review

Meta El Paso Current Development

, TX · BlackRock (managed funds); Meta Platforms

Reported status: under construction

Exact location not published.

Original source · 2026-07-28

research-final:TX:f977ef596067134fe380
Awaiting source review

ServerDomes Global Hudspeth County Data Center (Desert Haven)

Desert Haven area (unincorporated), TX · ServerDomes Global (Boise, ID) - named by Hudspeth County as one of the organizations involved

Reported status: proposed

Exact location not published.

Original source · 2026-10-09

research-final:TX:272e4b0aebe19a911b10
Accepted facility identity linked

DataBank Granite Point Campus (SLC2-SLC6)

Bluffdale, UT · DataBank

Reported status: operational

Exact location not published.

Original source · 2026-08-15

Read 1 source findings (2026-10-29)

Current operator identifies one Granite Point campus encompassing SLC2 through SLC6. Represented by the operator SLC2 address at 14944 South Pony Express Road. Census omits South, so no exact-normalized geometry is asserted; campus buildings and source aliases are not separately admitted. Evidence

Existing project record

research-final:UT:0d33e43913155050508b
Research database | Compute Equity Atlas