Unnamed research feature in Putney
Putney, VT · The Putney School
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:VT:4f346aec33e01388dd296,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.
Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Putney, VT · The Putney School
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:VT:4f346aec33e01388dd29Rutland, VT · Vermont Electric Power Company (VELCO)
Reported status: operational
Reported capacity: 1.6 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Rutland. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-18
research-final:VT:442d029c94562f95fb75Rutland, VT · Vermont Electric Power Company, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:VT:32f97651e320b191adeaSouth Burlington, VT · Lightboard ☆ Built On Light
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:VT:84a6d81d6bbebe0edf0aSouth Burlington, VT · Lightboard
Reported status: operational
Source reference: address match (exact): 530 COMMUNITY DR, SOUTH BURLINGTON, VT, 05403. Census Geocoder; not a verified facility pin.
Original source · 2026-10-11
research-final:VT:e07c4177dc0791649064South Burlington, VT · Tech Vault, Inc.; Continent 8 Group
Reported status: operational
Reported capacity: 0.8 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
research-final:VT:72ab9be55a236367fbf1South Burlington, VT · University of Vermont
Reported status: operational
Source reference: address match (exact): 530 COMMUNITY DR, SOUTH BURLINGTON, VT, 05403. Census Geocoder; not a verified facility pin.
Original source · 2026-10-11
University 2026 Research Week explicitly places tours of VACC computing clusters at 530 Community Drive in South Burlington. Current maintenance documentation confirms active data-center power and cooling upgrades. No ZIP was supplied on the location source. Lightboard carrier-hotel rows at the same address are not separate physical-building points. Evidence
St. Albans, VT · Unnamed developer
Reported status: cancelled
Exact location not published.
Original source · 2026-09-12
research-final:VT:9c3b59dd413d7d7d585cSt. Albans, VT · Undisclosed developer; St. Albans municipal economic-development officials
Reported status: cancelled
Approximate locality: approximate: Census 2024 Gazetteer place centroid for St. Albans. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
research-final:VT:3fec7f80d9655b8ff2b1Stowe, VT · Power Shift
Reported status: operational
Approximate locality: address match (exact): 571 S MAIN ST, STOWE, VT, 05672. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
research-final:VT:a33c2be048cd1695e065Vernon, VT · PowerTransitions
Reported status: proposed
Exact location not published.
Original source · 2026-10-11
research-final:VT:980abc3b67879146a748Williston, VT · FirstLight Fiber
Reported status: operational
Reported capacity: 2 MW (scope and operation unverified)
Source reference: address match (exact): 45 KRUPP DR, WILLISTON, VT, 05495. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
research-final:VT:da8879faf3e0c0850a18Bellevue, WA · IsoFusion / Colocation Northwest
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Current operator facility page and linked specification sheet confirm active colocation in Bellevue. No primary street-address binding was established, so directory coordinates remain off map. Evidence
Bellingham, WA · CSS Communications
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:WA:ee6205334e1e26e3af2dBothell, WA · Ziply Fiber
Reported status: operational
Exact location not published.
Original source · 2026-06-18
research-final:WA:40325036dcbb4917f91aBothell, WA · Bothell Data Services
Reported status: operational
Exact location not published.
Original source · 2026-06-17
research-final:WA:1084df62c5bf50655be6Bothell, WA
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:WA:220f5d2c8c58aa3c767aBothell, WA
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:WA:1cce815a2a4f60c9e3e1Cashmere, WA · Salcido Enterprises, LLC
Reported status: operational
Exact location not published.
Original source · 2026-09-21
research-final:WA:b8eeb79b3e842971b42fCle Elum, WA · Blue Fern Development
Reported status: proposed
Reported capacity: 20 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-12
research-final:WA:9ef8090a488eb2ed6bf0Dallesport, WA · Webster Orchards (landowner; developer not selected)
Reported status: proposed
Exact location not published.
Original source · 2026-10-12
research-final:WA:987ee6af0d9e2647f89cDallesport, WA · Lakeside Industries
Reported status: proposed
Exact location not published.
Original source · 2026-10-12
research-final:WA:3fec2d1d9aaa8a1ce8b4East Wenatchee, WA · Actapio, Inc.
Reported status: operational
Exact location not published.
Original source · 2026-09-17
research-final:WA:17b55ad9964619101ff6East Wenatchee, WA
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:WA:8ec573edad07880cf967East Wenatchee, WA · Bitdeer
Reported status: under construction
Reported capacity: 13 MW planned (scope and operation unverified)
Regulatory reference: FRS facility point (stated accuracy 330 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-09-10
research-final:WA:f8deb1e7eee4448530a0East Wenatchee, WA
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
research-final:WA:775e90f10f2f4ba5ff7bEast Wenatchee, WA
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
research-final:WA:5060c227d0b7f738d3ceEast Wenatchee, WA · Giga Watt Inc.
Reported status: cancelled
Exact location not published.
Original source · 2026-08-05
research-final:WA:8306ebe167e19754b1ecEast Wenatchee, WA · Google LLC
Reported status: proposed
Reported capacity: 480.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-14
research-final:WA:04dc84516ae103c8c192East Wenatchee, WA · Microsoft
Reported status: under construction
Reported capacity: 180 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
research-final:WA:1c2688fb75c6344cb4fc