6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

Aspen Creek Digital — Olathe Solar Bitcoin Mine

Olathe, CO · Aspen Creek Digital Corporation

Reported status: operational

Reported capacity: 6 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-08-26

Review note: Source lists Aspen Creek Digital — Olathe Solar Bitcoin Mine in Olathe with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Aspen Creek Digital — Olathe Solar Bitcoin Mine in Olathe with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:91fe2f4155c14d4fcd2b
Review notes available

Flexential Parker (Compark)

Parker, CO · Flexential

Reported status: under construction

Reported capacity: 22.5 MW planned (scope and operation unverified)

Regulatory reference: FRS facility point (stated accuracy 200 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-19

Review note: Flexential Parker is one build; marketed 22.5MW design is not measured operation and CSV825/843 are not extra campuses.

Read 1 source findings (2026-10-30)

Flexential Parker is one build; marketed 22.5MW design is not measured operation and CSV825/843 are not extra campuses. Evidence

research-final:CO:69e1b1546dfbcc03872c
Review notes available

Flexential Parker Data Center

Parker, CO · Flexential

Reported status: under construction

Reported capacity: 22.5 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Parker. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: Flexential Parker is same site as CSV825/842, not second facility.

Read 1 source findings (2026-10-30)

Flexential Parker is same site as CSV825/842, not second facility. Evidence

research-final:CO:b3ed012a4d47657187fd
Review notes available

Irea Highfield Data Center Sss4275

Parker, CO

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Source lists Irea Highfield Data Center Sss4275 in Parker with claimed existing (EPA facility record; status unverified) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Irea Highfield Data Center Sss4275 in Parker with claimed existing (EPA facility record; status unverified) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:1c5b8dc87870a55d8497
Review notes available

Viawest Inc - Englewood Data Center

Parker Area, CO

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Source lists Viawest Inc - Englewood Data Center in Parker Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Viawest Inc - Englewood Data Center in Parker Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:925cfccc296f9b2708bb
Review notes available

Prometheus Hyperscale Pueblo

Pueblo, CO · Prometheus Hyperscale

Reported status: proposed

Exact location not published.

Original source · 2026-08-26

Review note: Source lists Prometheus Hyperscale Pueblo in Pueblo with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Prometheus Hyperscale Pueblo in Pueblo with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:3e163b961266cfdf335c
Review notes available

Granite Renewables Logan County Data Center Campus

Sterling, CO · Granite Renewables

Reported status: proposed

Reported capacity: 2000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-26

Review note: Source lists Granite Renewables Logan County Data Center Campus in Sterling with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Granite Renewables Logan County Data Center Campus in Sterling with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:15b276eef1254ea4d364
Review notes available

Sterling Data Center

Sterling, CO · Granite Renewables

Reported status: proposed

Reported capacity: 2000.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Source lists Sterling Data Center in Sterling with claimed proposed status; the supplier's DataCentersExposed 2026-10-27 (ODbL) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Sterling Data Center in Sterling with claimed proposed status; the supplier's DataCentersExposed 2026-10-27 (ODbL) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:fdc399cdf305de7ea141
Review notes available

11:11 Systems Thornton Data Center (DEN550)

Thornton, CO · 11:11 Systems

Reported status: operational

Exact location not published.

Original source · 2026-10-19

Review note: 11:11 Systems Thornton DEN550 is an operator name requiring exact building/legal transfer audit versus Sungard CSV850.

Read 1 source findings (2026-10-30)

11:11 Systems Thornton DEN550 is an operator name requiring exact building/legal transfer audit versus Sungard CSV850. Evidence

research-final:CO:e643ab078128ea2e085d
Review notes available

Sungard AS Thornton

Thornton, CO · Sungard Availability Services

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Historical Sungard Thornton may overlap 11:11 Systems DEN550, not proven from PeeringDB alone.

Read 1 source findings (2026-10-30)

Historical Sungard Thornton may overlap 11:11 Systems DEN550, not proven from PeeringDB alone. Evidence

research-final:CO:31691526fce9b6272907
Review notes available

Google - Thornton

Thorton, CO · Google LLC

Reported status: existing (mapped + EPA air-permit record)

Exact location not published.

Original source · 2026-06-14

Review note: Source lists Google - Thornton in Thorton with claimed existing (mapped + EPA air-permit record) status; the supplier's DataCentersExposed 2026-10-27 (ODbL); EPA ECHO / FRS (public domain); OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Google - Thornton in Thorton with claimed existing (mapped + EPA air-permit record) status; the supplier's DataCentersExposed 2026-10-27 (ODbL); EPA ECHO / FRS (public domain); OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:f4ebdc39d43f12bde43f
Review notes available

Crusoe Energy Digital Flare Mitigation — Oxbow Well Pad

Walden, CO · NYDIG DFM

Reported status: operational

Exact location not published.

Original source · 2026-08-05

Review note: Source lists Crusoe Energy Digital Flare Mitigation — Oxbow Well Pad in Walden with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Crusoe Energy Digital Flare Mitigation — Oxbow Well Pad in Walden with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:3803e9e21d1f2273347d
Review notes available

Nydig Dfm - Gregory 0780 1-9H

Walden 11.2 Mi. N Of, CO

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

Review note: Source lists Nydig Dfm - Gregory 0780 1-9H in Walden 11.2 Mi. N Of with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Nydig Dfm - Gregory 0780 1-9H in Walden 11.2 Mi. N Of with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:28a703661d7e178764e4
Review notes available

Nydig Dfm - Surprise S4 Facility

Walden Area, CO

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

Review note: Source lists Nydig Dfm - Surprise S4 Facility in Walden Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Nydig Dfm - Surprise S4 Facility in Walden Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:3dbb3917814bcb20470e
Review notes available

BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center

Walsenburg, CO · BluSky AI Inc.

Reported status: proposed

Reported capacity: 15 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-26

Review note: Source lists BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center in Walsenburg with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center in Walsenburg with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:717f4a4e2596efab53db
Review notes available

DataBank DEN4 — existing edge colocation data-centre operations

Westminster, CO · DataBank

Reported status: operational

Exact location not published.

Original source · 2026-09-28

Review note: DataBank DEN4 Westminster is listed by operator as existing single facility.

Read 1 source findings (2026-10-30)

DataBank DEN4 Westminster is listed by operator as existing single facility. Evidence

research-final:CO:41ebcb0081439cbe0a8d
Review notes available

Datalogix, Inc. - 10075 Westmoor

Westminster, CO

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Source lists Datalogix, Inc. - 10075 Westmoor in Westminster with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Datalogix, Inc. - 10075 Westmoor in Westminster with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:e63f83a65a8829d586ab
Review notes available

Fontus Data Centre Project

, CO · Westbridge Renewable Energy

Reported status: proposed

Reported capacity: 380 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Source lists Fontus Data Centre Project in unspecified locality with claimed proposed status; the supplier's servercountry.org (v1) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Fontus Data Centre Project in unspecified locality with claimed proposed status; the supplier's servercountry.org (v1) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:bc8cbd83deeb4cc9407c
Review notes available

Unnamed source-mapped location

, CO

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Source lists Unnamed source-mapped location in unspecified locality with claimed existing (mapped; status unverified) status; the supplier's OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.

Read 1 source findings (2026-10-30)

Source lists Unnamed source-mapped location in unspecified locality with claimed existing (mapped; status unverified) status; the supplier's OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence

research-final:CO:dfd4112911cce0a78b9b
Review notes available

Global AI Windsor Data Center

Windsor, CO · Global AI

Reported status: under construction

Reported capacity: 1.0 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Windsor. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-09-30

Review note: Weld County conditional use approval USR26-0019 covers the former Carestream/Kodak facility near Windsor; this is not operating load or proof of completed construction.

Read 1 source findings (2026-10-30)

Weld County conditional use approval USR26-0019 covers the former Carestream/Kodak facility near Windsor; this is not operating load or proof of completed construction. Evidence

research-final:CO:cc866ecec7164c2ed632
Accepted facility identity linked

Beacon Falls Data Center Campus (1 Lopus Road)

Beacon Falls, CT · O&G Industries

Reported status: proposed

Reported capacity: 100 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-30

Review note: Same independently admitted Beacon Falls proposal; CSV861 is earlier 32 MW approval / later marketing variant on the same parcel; different claimed power is not measured demand.

Read 2 source findings (2026-10-30)

Same independently admitted Beacon Falls proposal; CSV861 is earlier 32 MW approval / later marketing variant on the same parcel; different claimed power is not measured demand. Evidence

Current project sales representative identifies the master developer, exact address and proposed construction status. Town August 20, 2026 minutes page 3 confirm no application before the commission at that meeting. This is a marketed ground-up proposal, not operating or under construction. Archive O&G row 861 is the same project. Evidence

Existing project record

research-final:CT:4b31582ad6e02f73ba90
Review notes available

O&G Industries Beacon Falls Data Center

Beacon Falls, CT · O&G Industries; CT Data Center LLC

Reported status: proposed

Reported capacity: 32 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Same O&G Beacon Falls site as CSV860; old 32MW permission does not establish the marketed 100MW as built or another campus.

Read 1 source findings (2026-10-30)

Same O&G Beacon Falls site as CSV860; old 32MW permission does not establish the marketed 100MW as built or another campus. Evidence

research-final:CT:c9b4f7962e956cd0aed5
Review notes available

Atlas Capital Group Bloomfield Data Center

Bloomfield, CT · Atlas Capital Group; River Bend Development CT

Reported status: proposed

Reported capacity: 100 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Bloomfield Atlas conceptual project at 132 Griffin Road North (town 2025 Planning and Zoning minutes); no completed building or valid ODbL geocode.

Read 1 source findings (2026-10-30)

Bloomfield Atlas conceptual project at 132 Griffin Road North (town 2025 Planning and Zoning minutes); no completed building or valid ODbL geocode. Evidence

research-final:CT:b6961bf3cd1a90ca4e0e
Review notes available

GotSpace Data Center

Bozrah, CT

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Already-published GotSpace Bozrah project. Original PA article in source is wrong jurisdiction and ODbL point excluded.

Read 1 source findings (2026-10-30)

Already-published GotSpace Bozrah project. Original PA article in source is wrong jurisdiction and ODbL point excluded. Evidence

research-final:CT:9a76d2ad80a88e715c55
Accepted facility identity linked

ReNew Riverside Bristol Technology Center

Bristol, CT · ReNew Riverside LLC; ReNew Developers; Gray Wolf Data Centers

Reported status: proposed

Reported capacity: 4 MW (scope and operation unverified)

Approximate locality: address match (exact): 234 RIVERSIDE AVE, BRISTOL, CT, 06010. Census Geocoder; not a verified facility pin.

Original source · 2026-07-18

Review note: Already-admitted ReNew Riverside pad; developer says the buyer must obtain building permits, so no operating or construction claim.

Read 2 source findings (2026-10-30)

Already-admitted ReNew Riverside pad; developer says the buyer must obtain building permits, so no operating or construction claim. Evidence

Developer identifies an under-contract data-center pad at this address. Site-specific text says building permits remain the buyer responsibility; generic Gray Wolf partnership marketing does not establish completed operation at this pad. Census returns Riverside Avenue instead of the published Riverside Drive, so geometry remains held. Evidence

Existing project record

research-final:CT:d5289403dde9ee5361e7
Accepted facility identity linked

ReNew Amston 1

Colchester, CT · ReNew Developers; Gray Wolf Data Centers

Reported status: proposed

Reported capacity: 5 MW (scope and operation unverified)

Approximate locality: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.

Original source · 2026-07-18

Review note: Already-admitted Amston campus; ReNew marketing is not municipal zoning approval.

Read 2 source findings (2026-10-30)

Already-admitted Amston campus; ReNew marketing is not municipal zoning approval. Evidence

Developer identifies an under-contract site with options for one or two buildings and power pads. One campus identity is admitted; Amston 2 and 42 Old Amston research labels are not additional certified facilities. Fuel-cell pad approval is not building permission or IT operation. The zero-number address is not used for a map point. Evidence

Existing project record

research-final:CT:71532cb6ec1172c4d8b9
Review notes available

ReNew Amston 2

Colchester, CT · ReNew Developers

Reported status: proposed

Reported capacity: 18 MW (scope and operation unverified)

Approximate locality: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Review note: Second proposed building/parcel label at the Amston campus; do not create an extra campus or treat fuel-cell MW as IT load.

Read 1 source findings (2026-10-30)

Second proposed building/parcel label at the Amston campus; do not create an extra campus or treat fuel-cell MW as IT load. Evidence

research-final:CT:854107fe9a58283695b0
Review notes available

ReNew Amston Data Center Campus (42 Old Amston Road)

Colchester, CT · ReNew Developers

Reported status: proposed

Reported capacity: 10 MW planned (scope and operation unverified)

Source reference: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.

Original source · 2026-10-19

Review note: 42 Old Amston Road campus reference covers Amston 1/2 proposal; September and October 2026 reporting confirms no formal zoning application.

Read 1 source findings (2026-10-30)

42 Old Amston Road campus reference covers Amston 1/2 proposal; September and October 2026 reporting confirms no formal zoning application. Evidence

research-final:CT:e4b5ac95decadee198f2
Accepted facility identity linked

Global Common Fuel-Cell Data Center (Geer Street)

Cromwell, CT · Global Common LLC

Reported status: proposed

Reported capacity: 300 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-19

Review note: Already-admitted proposed Global Common Cromwell campus; industrial site plan and MW claims remain unverified operating values.

Read 2 source findings (2026-10-30)

Already-admitted proposed Global Common Cromwell campus; industrial site plan and MW claims remain unverified operating values. Evidence

Developer identifies its proposed data-center campus on Geer Street in Cromwell. Development plans do not establish operating capacity or construction start. Street-level identity lacks a verified site address and map geometry remains held. Evidence

Existing project record

research-final:CT:d0dc9000589508f09628
Review notes available

Ergonomic Group

Glastonbury, CT

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-12

Review note: Existing Ergonomic Group Glastonbury canonical; OSM only provides name and point, not current operating status or geometry reuse rights.

Read 1 source findings (2026-10-30)

Existing Ergonomic Group Glastonbury canonical; OSM only provides name and point, not current operating status or geometry reuse rights. Evidence

research-final:CT:595407108517d964d5bf