Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableAspen Creek Digital — Olathe Solar Bitcoin Mine
Olathe, CO · Aspen Creek Digital Corporation
Reported status: operational
Reported capacity: 6 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-08-26
Review note: Source lists Aspen Creek Digital — Olathe Solar Bitcoin Mine in Olathe with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Aspen Creek Digital — Olathe Solar Bitcoin Mine in Olathe with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:91fe2f4155c14d4fcd2bReview notes availableFlexential Parker (Compark)
Parker, CO · Flexential
Reported status: under construction
Reported capacity: 22.5 MW planned (scope and operation unverified)
Regulatory reference: FRS facility point (stated accuracy 200 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-19
Review note: Flexential Parker is one build; marketed 22.5MW design is not measured operation and CSV825/843 are not extra campuses.
Read 1 source findings (2026-10-30)
Flexential Parker is one build; marketed 22.5MW design is not measured operation and CSV825/843 are not extra campuses. Evidence
research-final:CO:69e1b1546dfbcc03872cReview notes availableFlexential Parker Data Center
Parker, CO · Flexential
Reported status: under construction
Reported capacity: 22.5 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Parker. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-19
Review note: Flexential Parker is same site as CSV825/842, not second facility.
Read 1 source findings (2026-10-30)
Flexential Parker is same site as CSV825/842, not second facility. Evidence
research-final:CO:b3ed012a4d47657187fdReview notes availableIrea Highfield Data Center Sss4275
Parker, CO
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: Source lists Irea Highfield Data Center Sss4275 in Parker with claimed existing (EPA facility record; status unverified) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Irea Highfield Data Center Sss4275 in Parker with claimed existing (EPA facility record; status unverified) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:1c5b8dc87870a55d8497Review notes availableViawest Inc - Englewood Data Center
Parker Area, CO
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Source lists Viawest Inc - Englewood Data Center in Parker Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Viawest Inc - Englewood Data Center in Parker Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:925cfccc296f9b2708bbReview notes availablePrometheus Hyperscale Pueblo
Pueblo, CO · Prometheus Hyperscale
Reported status: proposed
Exact location not published.
Original source · 2026-08-26
Review note: Source lists Prometheus Hyperscale Pueblo in Pueblo with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Prometheus Hyperscale Pueblo in Pueblo with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:3e163b961266cfdf335cReview notes availableGranite Renewables Logan County Data Center Campus
Sterling, CO · Granite Renewables
Reported status: proposed
Reported capacity: 2000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-26
Review note: Source lists Granite Renewables Logan County Data Center Campus in Sterling with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Granite Renewables Logan County Data Center Campus in Sterling with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:15b276eef1254ea4d364Review notes availableSterling Data Center
Sterling, CO · Granite Renewables
Reported status: proposed
Reported capacity: 2000.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Source lists Sterling Data Center in Sterling with claimed proposed status; the supplier's DataCentersExposed 2026-10-27 (ODbL) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Sterling Data Center in Sterling with claimed proposed status; the supplier's DataCentersExposed 2026-10-27 (ODbL) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:fdc399cdf305de7ea141Review notes available11:11 Systems Thornton Data Center (DEN550)
Thornton, CO · 11:11 Systems
Reported status: operational
Exact location not published.
Original source · 2026-10-19
Review note: 11:11 Systems Thornton DEN550 is an operator name requiring exact building/legal transfer audit versus Sungard CSV850.
Read 1 source findings (2026-10-30)
11:11 Systems Thornton DEN550 is an operator name requiring exact building/legal transfer audit versus Sungard CSV850. Evidence
research-final:CO:e643ab078128ea2e085dReview notes availableSungard AS Thornton
Thornton, CO · Sungard Availability Services
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Historical Sungard Thornton may overlap 11:11 Systems DEN550, not proven from PeeringDB alone.
Read 1 source findings (2026-10-30)
Historical Sungard Thornton may overlap 11:11 Systems DEN550, not proven from PeeringDB alone. Evidence
research-final:CO:31691526fce9b6272907Review notes availableGoogle - Thornton
Thorton, CO · Google LLC
Reported status: existing (mapped + EPA air-permit record)
Exact location not published.
Original source · 2026-06-14
Review note: Source lists Google - Thornton in Thorton with claimed existing (mapped + EPA air-permit record) status; the supplier's DataCentersExposed 2026-10-27 (ODbL); EPA ECHO / FRS (public domain); OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Google - Thornton in Thorton with claimed existing (mapped + EPA air-permit record) status; the supplier's DataCentersExposed 2026-10-27 (ODbL); EPA ECHO / FRS (public domain); OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:f4ebdc39d43f12bde43fReview notes availableCrusoe Energy Digital Flare Mitigation — Oxbow Well Pad
Walden, CO · NYDIG DFM
Reported status: operational
Exact location not published.
Original source · 2026-08-05
Review note: Source lists Crusoe Energy Digital Flare Mitigation — Oxbow Well Pad in Walden with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Crusoe Energy Digital Flare Mitigation — Oxbow Well Pad in Walden with claimed operational status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:3803e9e21d1f2273347dReview notes availableNydig Dfm - Gregory 0780 1-9H
Walden 11.2 Mi. N Of, CO
Reported status: approved/permitted (EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: Source lists Nydig Dfm - Gregory 0780 1-9H in Walden 11.2 Mi. N Of with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Nydig Dfm - Gregory 0780 1-9H in Walden 11.2 Mi. N Of with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:28a703661d7e178764e4Review notes availableNydig Dfm - Surprise S4 Facility
Walden Area, CO
Reported status: approved/permitted (EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: Source lists Nydig Dfm - Surprise S4 Facility in Walden Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Nydig Dfm - Surprise S4 Facility in Walden Area with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:3dbb3917814bcb20470eReview notes availableBluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center
Walsenburg, CO · BluSky AI Inc.
Reported status: proposed
Reported capacity: 15 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-26
Review note: Source lists BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center in Walsenburg with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists BluSky AI Walsenburg (Indian Pool Ranch) Modular Data Center in Walsenburg with claimed proposed status; the supplier's Compute Atlas (CC BY 4.0) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:717f4a4e2596efab53dbReview notes availableDataBank DEN4 — existing edge colocation data-centre operations
Westminster, CO · DataBank
Reported status: operational
Exact location not published.
Original source · 2026-09-28
Review note: DataBank DEN4 Westminster is listed by operator as existing single facility.
Read 1 source findings (2026-10-30)
DataBank DEN4 Westminster is listed by operator as existing single facility. Evidence
research-final:CO:41ebcb0081439cbe0a8dReview notes availableDatalogix, Inc. - 10075 Westmoor
Westminster, CO
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Source lists Datalogix, Inc. - 10075 Westmoor in Westminster with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Datalogix, Inc. - 10075 Westmoor in Westminster with claimed approved/permitted (EPA air-permit record) status; the supplier's EPA ECHO / FRS (public domain) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:e63f83a65a8829d586abReview notes availableFontus Data Centre Project
, CO · Westbridge Renewable Energy
Reported status: proposed
Reported capacity: 380 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Source lists Fontus Data Centre Project in unspecified locality with claimed proposed status; the supplier's servercountry.org (v1) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Fontus Data Centre Project in unspecified locality with claimed proposed status; the supplier's servercountry.org (v1) requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:bc8cbd83deeb4cc9407cReview notes availableUnnamed source-mapped location
, CO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Review note: Source lists Unnamed source-mapped location in unspecified locality with claimed existing (mapped; status unverified) status; the supplier's OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point.
Read 1 source findings (2026-10-30)
Source lists Unnamed source-mapped location in unspecified locality with claimed existing (mapped; status unverified) status; the supplier's OpenStreetMap (ODbL) via QLever; IM3 Open Source Data Center Atlas v2026.02.09 (ODbL), via trackdatacenters.io source-reference file requires independent physical-site/canonical and rights review. It does not prove measured operating MW or a public map point. Evidence
research-final:CO:dfd4112911cce0a78b9bReview notes availableGlobal AI Windsor Data Center
Windsor, CO · Global AI
Reported status: under construction
Reported capacity: 1.0 GW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Windsor. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-09-30
Review note: Weld County conditional use approval USR26-0019 covers the former Carestream/Kodak facility near Windsor; this is not operating load or proof of completed construction.
Read 1 source findings (2026-10-30)
Weld County conditional use approval USR26-0019 covers the former Carestream/Kodak facility near Windsor; this is not operating load or proof of completed construction. Evidence
research-final:CO:cc866ecec7164c2ed632Accepted facility identity linkedBeacon Falls Data Center Campus (1 Lopus Road)
Beacon Falls, CT · O&G Industries
Reported status: proposed
Reported capacity: 100 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-30
Review note: Same independently admitted Beacon Falls proposal; CSV861 is earlier 32 MW approval / later marketing variant on the same parcel; different claimed power is not measured demand.
Read 2 source findings (2026-10-30)
Same independently admitted Beacon Falls proposal; CSV861 is earlier 32 MW approval / later marketing variant on the same parcel; different claimed power is not measured demand. Evidence
Current project sales representative identifies the master developer, exact address and proposed construction status. Town August 20, 2026 minutes page 3 confirm no application before the commission at that meeting. This is a marketed ground-up proposal, not operating or under construction. Archive O&G row 861 is the same project. Evidence
Existing project record
research-final:CT:4b31582ad6e02f73ba90Review notes availableO&G Industries Beacon Falls Data Center
Beacon Falls, CT · O&G Industries; CT Data Center LLC
Reported status: proposed
Reported capacity: 32 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Same O&G Beacon Falls site as CSV860; old 32MW permission does not establish the marketed 100MW as built or another campus.
Read 1 source findings (2026-10-30)
Same O&G Beacon Falls site as CSV860; old 32MW permission does not establish the marketed 100MW as built or another campus. Evidence
research-final:CT:c9b4f7962e956cd0aed5Review notes availableAtlas Capital Group Bloomfield Data Center
Bloomfield, CT · Atlas Capital Group; River Bend Development CT
Reported status: proposed
Reported capacity: 100 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Bloomfield Atlas conceptual project at 132 Griffin Road North (town 2025 Planning and Zoning minutes); no completed building or valid ODbL geocode.
Read 1 source findings (2026-10-30)
Bloomfield Atlas conceptual project at 132 Griffin Road North (town 2025 Planning and Zoning minutes); no completed building or valid ODbL geocode. Evidence
research-final:CT:b6961bf3cd1a90ca4e0eReview notes availableGotSpace Data Center
Bozrah, CT
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Already-published GotSpace Bozrah project. Original PA article in source is wrong jurisdiction and ODbL point excluded.
Read 1 source findings (2026-10-30)
Already-published GotSpace Bozrah project. Original PA article in source is wrong jurisdiction and ODbL point excluded. Evidence
research-final:CT:9a76d2ad80a88e715c55Accepted facility identity linkedReNew Riverside Bristol Technology Center
Bristol, CT · ReNew Riverside LLC; ReNew Developers; Gray Wolf Data Centers
Reported status: proposed
Reported capacity: 4 MW (scope and operation unverified)
Approximate locality: address match (exact): 234 RIVERSIDE AVE, BRISTOL, CT, 06010. Census Geocoder; not a verified facility pin.
Original source · 2026-07-18
Review note: Already-admitted ReNew Riverside pad; developer says the buyer must obtain building permits, so no operating or construction claim.
Read 2 source findings (2026-10-30)
Already-admitted ReNew Riverside pad; developer says the buyer must obtain building permits, so no operating or construction claim. Evidence
Developer identifies an under-contract data-center pad at this address. Site-specific text says building permits remain the buyer responsibility; generic Gray Wolf partnership marketing does not establish completed operation at this pad. Census returns Riverside Avenue instead of the published Riverside Drive, so geometry remains held. Evidence
Existing project record
research-final:CT:d5289403dde9ee5361e7Accepted facility identity linkedReNew Amston 1
Colchester, CT · ReNew Developers; Gray Wolf Data Centers
Reported status: proposed
Reported capacity: 5 MW (scope and operation unverified)
Approximate locality: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.
Original source · 2026-07-18
Review note: Already-admitted Amston campus; ReNew marketing is not municipal zoning approval.
Read 2 source findings (2026-10-30)
Already-admitted Amston campus; ReNew marketing is not municipal zoning approval. Evidence
Developer identifies an under-contract site with options for one or two buildings and power pads. One campus identity is admitted; Amston 2 and 42 Old Amston research labels are not additional certified facilities. Fuel-cell pad approval is not building permission or IT operation. The zero-number address is not used for a map point. Evidence
Existing project record
research-final:CT:71532cb6ec1172c4d8b9Review notes availableReNew Amston 2
Colchester, CT · ReNew Developers
Reported status: proposed
Reported capacity: 18 MW (scope and operation unverified)
Approximate locality: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
Review note: Second proposed building/parcel label at the Amston campus; do not create an extra campus or treat fuel-cell MW as IT load.
Read 1 source findings (2026-10-30)
Second proposed building/parcel label at the Amston campus; do not create an extra campus or treat fuel-cell MW as IT load. Evidence
research-final:CT:854107fe9a58283695b0Review notes availableReNew Amston Data Center Campus (42 Old Amston Road)
Colchester, CT · ReNew Developers
Reported status: proposed
Reported capacity: 10 MW planned (scope and operation unverified)
Source reference: address match (exact): 42 OLD AMSTON RD, COLCHESTER, CT, 06415. Census Geocoder; not a verified facility pin.
Original source · 2026-10-19
Review note: 42 Old Amston Road campus reference covers Amston 1/2 proposal; September and October 2026 reporting confirms no formal zoning application.
Read 1 source findings (2026-10-30)
42 Old Amston Road campus reference covers Amston 1/2 proposal; September and October 2026 reporting confirms no formal zoning application. Evidence
research-final:CT:e4b5ac95decadee198f2Accepted facility identity linkedGlobal Common Fuel-Cell Data Center (Geer Street)
Cromwell, CT · Global Common LLC
Reported status: proposed
Reported capacity: 300 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-19
Review note: Already-admitted proposed Global Common Cromwell campus; industrial site plan and MW claims remain unverified operating values.
Read 2 source findings (2026-10-30)
Already-admitted proposed Global Common Cromwell campus; industrial site plan and MW claims remain unverified operating values. Evidence
Developer identifies its proposed data-center campus on Geer Street in Cromwell. Development plans do not establish operating capacity or construction start. Street-level identity lacks a verified site address and map geometry remains held. Evidence
Existing project record
research-final:CT:d0dc9000589508f09628Review notes availableErgonomic Group
Glastonbury, CT
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: Existing Ergonomic Group Glastonbury canonical; OSM only provides name and point, not current operating status or geometry reuse rights.
Read 1 source findings (2026-10-30)
Existing Ergonomic Group Glastonbury canonical; OSM only provides name and point, not current operating status or geometry reuse rights. Evidence
research-final:CT:595407108517d964d5bf