Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

Ybor Data Center

Tampa, FL

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 5 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original FL1080 Ybor Data Center supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:da0ef3b36e4c485a1aa1
Review notes available

NocRoom Miami IT Services

Virginia Gardens, FL

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-12

Review note: Original FL1081 NocRoom Miami IT Services supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:4f54f3b07ff1b1a50bd3
Review notes available

Cloud South West Palm Beach 1

West Palm Beach, FL · Cloud South

Reported status: operational

Source reference: address match (exact): 513 HAMPTON RD, WEST PALM BEACH, FL, 33405. Census Geocoder; not a verified facility pin.

Original source · 2026-10-02

Review note: Original FL1082 Cloud South West Palm Beach 1 supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:e7d860f9b009f302fe90
Review notes available

Iron Mountain MIA-1

Westview, FL · Iron Mountain

Reported status: under construction

Reported capacity: 16 MW planned (scope and operation unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-20

Review note: Iron Mountain MIA-1 original FL1016/1017 is a single project; 16MW maximum capability not measured operational draw.

Read 1 source findings (2026-10-30)

Iron Mountain MIA-1 original FL1016/1017 is a single project; 16MW maximum capability not measured operational draw. Evidence

research-final:FL:d9e68ee2d224e180643f
Review notes available

E-Foam

Winter Garden, FL

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original FL1084 E-Foam supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:f45ae7d4beeb8583b317
Review notes available

ACW Winter Haven

Winter Haven, FL · Alternative Choice Wireless, LLC

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Original FL1085 ACW Winter Haven supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:1790d21c7a636c32dace
Review notes available

Osceola County Hyperscale Data Center Campus

Yeehaw Junction, FL · US Development

Reported status: proposed

Reported capacity: 700 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Yeehaw Junction. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Original FL1086 Osceola County Hyperscale Data Center Campus supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:ab9ac30804a59b4f0b7c
Review notes available

US Development Yeehaw Junction Data Center Campus

Yeehaw Junction, FL · US Development (end tenant undisclosed)

Reported status: proposed

Exact location not published.

Original source · 2026-09-10

Review note: Original FL1087 US Development Yeehaw Junction Data Center Campus supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.

research-final:FL:484ff2cb0df1b3d5110f
Review notes available

Unnamed source-mapped location

Acworth, GA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Original GA1088 (Unnamed source-mapped location) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:ae458ab637c09fbb865a
Review notes available

Dixon Data Center/Project Sassy

Adairsville, GA · AtlasEdge

Reported status: proposed

Reported capacity: 200.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-21

Review note: Original GA1089 (Dixon Data Center/Project Sassy) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:9e0a2b31473e954fb261
Review notes available

Project Springbank

Adairsville, GA · Atlas Development LLC

Reported status: proposed

Reported capacity: 432 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Original GA1090 (Project Springbank) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:7f82a63ea7ffd5025f8f
Accepted facility identity linked

365 Data Centers Alpharetta (GA1)

Alpharetta, GA · 365 Data Centers

Reported status: operational

Reported capacity: 4.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Exact original source research-final:GA:2c324526352759298c1d already accepted by first-party materializer as reviewed:365-alpharetta-ga-20261029, operator 365 Data Centers, address 11650 Great Oaks Way, Alpharetta, GA 30022. No second site or inferred MW.

Read 2 source findings (2026-10-30)

Exact original source research-final:GA:2c324526352759298c1d already accepted by first-party materializer as reviewed:365-alpharetta-ga-20261029, operator 365 Data Centers, address 11650 Great Oaks Way, Alpharetta, GA 30022. No second site or inferred MW. Evidence

Operator identifies its current Alpharetta colocation and managed-hosting facility, with on-site support. Evidence

Existing project record

research-final:GA:2c324526352759298c1d
Review notes available

Adp Data Center (Dc1)

Alpharetta, GA

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original GA1092 (Adp Data Center (Dc1)) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:26f171af9be353eff7d8
Review notes available

Ascent - Atlanta Data Center

Alpharetta, GA · Prime Data Centers

Reported status: existing (mapped; status unverified)

Reported capacity: 12.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Original GA1093 (Ascent - Atlanta Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:3cc193e8ce1f84d2a19b
Review notes available

ENTERPRISE SERVICES, LLC

Alpharetta, GA

Reported status: existing (mapped; status unverified)

Reported capacity: 11.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Original GA1094 (ENTERPRISE SERVICES, LLC) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:bac23cfae95d2e79cfd7
Accepted facility identity linked

Flexential Atlanta - Alpharetta Data Center

Alpharetta, GA · Flexential

Reported status: operational

Reported capacity: 6 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Review note: Exact original source research-final:GA:52e3b8fb7470a93b2913 already accepted by first-party materializer as reviewed:flexential-alpharetta-ga-20261029, operator Flexential, address independently unknown. No second site or inferred MW.

Read 2 source findings (2026-10-30)

Exact original source research-final:GA:52e3b8fb7470a93b2913 already accepted by first-party materializer as reviewed:flexential-alpharetta-ga-20261029, operator Flexential, address independently unknown. No second site or inferred MW. Evidence

Current operator page identifies this Alpharetta colocation facility and round-the-clock technical services. No independently verified street address was obtained, so geography remains held. Evidence

Existing project record

research-final:GA:52e3b8fb7470a93b2913
Review notes available

Hewlett-Packard

Alpharetta, GA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original GA1096 (Hewlett-Packard) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:622864417252b9bcbc81
Review notes available

Mapletree Industrial

Alpharetta, GA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original GA1097 (Mapletree Industrial) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:d13939b0345246f9ce68
Review notes available

Secure Data Center

Alpharetta, GA · Prime Data Centers

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original GA1098 (Secure Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:e0c334173d3712fefd2c
Accepted facility identity linked

STACK ATL01 (formerly T5@Atlanta)

Alpharetta, GA · STACK Infrastructure

Reported status: operational

Reported capacity: 20 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-08-08

Review note: Exact original source research-final:GA:6d02262d33a261238d0e already accepted by first-party materializer as reviewed:stack-atl01-ga-20261029, operator STACK Infrastructure, address 3200 Webb Bridge Road, Alpharetta, GA 30005. No second site or inferred MW.

Read 2 source findings (2026-10-30)

Exact original source research-final:GA:6d02262d33a261238d0e already accepted by first-party materializer as reviewed:stack-atl01-ga-20261029, operator STACK Infrastructure, address 3200 Webb Bridge Road, Alpharetta, GA 30005. No second site or inferred MW. Evidence

Current operator confirms its operating ATL01 campus with two buildings in Alpharetta. Its facility access-location schedule supplies the exact street address. One physical campus is admitted rather than separate ATL01A/B records. Evidence

Existing project record

research-final:GA:6d02262d33a261238d0e
Review notes available

Strategic Datasphere

Alpharetta, GA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original GA1100 (Strategic Datasphere) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:e96b6e219dfd581d0bdd
Review notes available

Unnamed source-mapped location

Alpharetta, GA

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Original GA1101 (Unnamed source-mapped location) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:e53b1be32d738564a8af
Review notes available

UPS Data Center

Alpharetta, GA · Prime Data Centers

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Original GA1102 (UPS Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:b63e2870c2a1185dc2d6
Review notes available

Voss Ii- Expansion Network Data Center

Alpharetta, GA

Reported status: existing (mapped + EPA facility record)

Exact location not published.

Original source · 2026-10-28

Review note: Original GA1103 (Voss Ii- Expansion Network Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:5191fabdf67713dda084
Review notes available

Westside Parkway Owner Llc

Alpharetta, GA

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original GA1104 (Westside Parkway Owner Llc) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:19533241a465d46c1394
Accepted facility identity linked

Google Columbia County (GreenPoint) Data Center Campus Development

Appling, GA · Kinetic Infrastructure Solutions

Reported status: proposed

Exact location not published.

Original source · 2026-10-19

Review note: Exact original source research-final:GA:c6bd89719b84c3a6ee32 already accepted by first-party materializer as reviewed:google-columbia-county-ga-20261029, operator Google, address independently unknown. No second site or inferred MW.

Read 2 source findings (2026-10-30)

Exact original source research-final:GA:c6bd89719b84c3a6ee32 already accepted by first-party materializer as reviewed:google-columbia-county-ga-20261029, operator Google, address independently unknown. No second site or inferred MW. Evidence

Operator Georgia milestones explicitly announce a new Columbia County development in 2026. County scope only; no verified site address, construction start, operation or power inferred. Evidence

Existing project record

research-final:GA:c6bd89719b84c3a6ee32
Review notes available

Project JGK

Appling, GA

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Original GA1106 (Project JGK) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:f696be4017e5880fed9e
Review notes available

White Oak Technology Park

Appling, GA · Trammell Crow Company; CBRE

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

Review note: Original GA1107 (White Oak Technology Park) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:d080c1e2571dbcbf99a5
Review notes available

Athens Studio Data Center

Athens, GA

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Original GA1108 (Athens Studio Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:39d7b82322454c13e744
Review notes available

Old Elberton Road data center proposal

Athens, GA · FAE Clark LLC (property owner/applicant)

Reported status: rejected/denied

Exact location not published.

Original source · 2026-09-23

Review note: Original GA1109 (Old Elberton Road data center proposal) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.

research-final:GA:bbcf06deac2f0495d5a8
Research database | Compute Equity Atlas