Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableYbor Data Center
Tampa, FL
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 5 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original FL1080 Ybor Data Center supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:da0ef3b36e4c485a1aa1Review notes availableNocRoom Miami IT Services
Virginia Gardens, FL
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: Original FL1081 NocRoom Miami IT Services supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:4f54f3b07ff1b1a50bd3Review notes availableCloud South West Palm Beach 1
West Palm Beach, FL · Cloud South
Reported status: operational
Source reference: address match (exact): 513 HAMPTON RD, WEST PALM BEACH, FL, 33405. Census Geocoder; not a verified facility pin.
Original source · 2026-10-02
Review note: Original FL1082 Cloud South West Palm Beach 1 supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:e7d860f9b009f302fe90Review notes availableIron Mountain MIA-1
Westview, FL · Iron Mountain
Reported status: under construction
Reported capacity: 16 MW planned (scope and operation unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-20
Review note: Iron Mountain MIA-1 original FL1016/1017 is a single project; 16MW maximum capability not measured operational draw.
Read 1 source findings (2026-10-30)
Iron Mountain MIA-1 original FL1016/1017 is a single project; 16MW maximum capability not measured operational draw. Evidence
research-final:FL:d9e68ee2d224e180643fReview notes availableE-Foam
Winter Garden, FL
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original FL1084 E-Foam supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:f45ae7d4beeb8583b317Review notes availableACW Winter Haven
Winter Haven, FL · Alternative Choice Wireless, LLC
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: Original FL1085 ACW Winter Haven supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:1790d21c7a636c32daceReview notes availableOsceola County Hyperscale Data Center Campus
Yeehaw Junction, FL · US Development
Reported status: proposed
Reported capacity: 700 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Yeehaw Junction. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Original FL1086 Osceola County Hyperscale Data Center Campus supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:ab9ac30804a59b4f0b7cReview notes availableUS Development Yeehaw Junction Data Center Campus
Yeehaw Junction, FL · US Development (end tenant undisclosed)
Reported status: proposed
Exact location not published.
Original source · 2026-09-10
Review note: Original FL1087 US Development Yeehaw Junction Data Center Campus supplier research lead reviewed against pre-existing canonical identities and separate building, campus, tenant and phase concepts; independently supported current operator site/address and source terms still require proof.
research-final:FL:484ff2cb0df1b3d5110fReview notes availableUnnamed source-mapped location
Acworth, GA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Review note: Original GA1088 (Unnamed source-mapped location) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:ae458ab637c09fbb865aReview notes availableDixon Data Center/Project Sassy
Adairsville, GA · AtlasEdge
Reported status: proposed
Reported capacity: 200.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-21
Review note: Original GA1089 (Dixon Data Center/Project Sassy) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:9e0a2b31473e954fb261Review notes availableProject Springbank
Adairsville, GA · Atlas Development LLC
Reported status: proposed
Reported capacity: 432 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Original GA1090 (Project Springbank) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:7f82a63ea7ffd5025f8fAccepted facility identity linked365 Data Centers Alpharetta (GA1)
Alpharetta, GA · 365 Data Centers
Reported status: operational
Reported capacity: 4.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Exact original source research-final:GA:2c324526352759298c1d already accepted by first-party materializer as reviewed:365-alpharetta-ga-20261029, operator 365 Data Centers, address 11650 Great Oaks Way, Alpharetta, GA 30022. No second site or inferred MW.
Read 2 source findings (2026-10-30)
Exact original source research-final:GA:2c324526352759298c1d already accepted by first-party materializer as reviewed:365-alpharetta-ga-20261029, operator 365 Data Centers, address 11650 Great Oaks Way, Alpharetta, GA 30022. No second site or inferred MW. Evidence
Operator identifies its current Alpharetta colocation and managed-hosting facility, with on-site support. Evidence
Existing project record
research-final:GA:2c324526352759298c1dReview notes availableAdp Data Center (Dc1)
Alpharetta, GA
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original GA1092 (Adp Data Center (Dc1)) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:26f171af9be353eff7d8Review notes availableAscent - Atlanta Data Center
Alpharetta, GA · Prime Data Centers
Reported status: existing (mapped; status unverified)
Reported capacity: 12.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Original GA1093 (Ascent - Atlanta Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:3cc193e8ce1f84d2a19bReview notes availableENTERPRISE SERVICES, LLC
Alpharetta, GA
Reported status: existing (mapped; status unverified)
Reported capacity: 11.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Original GA1094 (ENTERPRISE SERVICES, LLC) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:bac23cfae95d2e79cfd7Accepted facility identity linkedFlexential Atlanta - Alpharetta Data Center
Alpharetta, GA · Flexential
Reported status: operational
Reported capacity: 6 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-21
Review note: Exact original source research-final:GA:52e3b8fb7470a93b2913 already accepted by first-party materializer as reviewed:flexential-alpharetta-ga-20261029, operator Flexential, address independently unknown. No second site or inferred MW.
Read 2 source findings (2026-10-30)
Exact original source research-final:GA:52e3b8fb7470a93b2913 already accepted by first-party materializer as reviewed:flexential-alpharetta-ga-20261029, operator Flexential, address independently unknown. No second site or inferred MW. Evidence
Current operator page identifies this Alpharetta colocation facility and round-the-clock technical services. No independently verified street address was obtained, so geography remains held. Evidence
Existing project record
research-final:GA:52e3b8fb7470a93b2913Review notes availableHewlett-Packard
Alpharetta, GA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original GA1096 (Hewlett-Packard) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:622864417252b9bcbc81Review notes availableMapletree Industrial
Alpharetta, GA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original GA1097 (Mapletree Industrial) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:d13939b0345246f9ce68Review notes availableSecure Data Center
Alpharetta, GA · Prime Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original GA1098 (Secure Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:e0c334173d3712fefd2cAccepted facility identity linkedSTACK ATL01 (formerly T5@Atlanta)
Alpharetta, GA · STACK Infrastructure
Reported status: operational
Reported capacity: 20 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-08-08
Review note: Exact original source research-final:GA:6d02262d33a261238d0e already accepted by first-party materializer as reviewed:stack-atl01-ga-20261029, operator STACK Infrastructure, address 3200 Webb Bridge Road, Alpharetta, GA 30005. No second site or inferred MW.
Read 2 source findings (2026-10-30)
Exact original source research-final:GA:6d02262d33a261238d0e already accepted by first-party materializer as reviewed:stack-atl01-ga-20261029, operator STACK Infrastructure, address 3200 Webb Bridge Road, Alpharetta, GA 30005. No second site or inferred MW. Evidence
Current operator confirms its operating ATL01 campus with two buildings in Alpharetta. Its facility access-location schedule supplies the exact street address. One physical campus is admitted rather than separate ATL01A/B records. Evidence
Existing project record
research-final:GA:6d02262d33a261238d0eReview notes availableStrategic Datasphere
Alpharetta, GA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original GA1100 (Strategic Datasphere) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:e96b6e219dfd581d0bddReview notes availableUnnamed source-mapped location
Alpharetta, GA
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Review note: Original GA1101 (Unnamed source-mapped location) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:e53b1be32d738564a8afReview notes availableUPS Data Center
Alpharetta, GA · Prime Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Original GA1102 (UPS Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:b63e2870c2a1185dc2d6Review notes availableVoss Ii- Expansion Network Data Center
Alpharetta, GA
Reported status: existing (mapped + EPA facility record)
Exact location not published.
Original source · 2026-10-28
Review note: Original GA1103 (Voss Ii- Expansion Network Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:5191fabdf67713dda084Review notes availableWestside Parkway Owner Llc
Alpharetta, GA
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Original GA1104 (Westside Parkway Owner Llc) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:19533241a465d46c1394Accepted facility identity linkedGoogle Columbia County (GreenPoint) Data Center Campus Development
Appling, GA · Kinetic Infrastructure Solutions
Reported status: proposed
Exact location not published.
Original source · 2026-10-19
Review note: Exact original source research-final:GA:c6bd89719b84c3a6ee32 already accepted by first-party materializer as reviewed:google-columbia-county-ga-20261029, operator Google, address independently unknown. No second site or inferred MW.
Read 2 source findings (2026-10-30)
Exact original source research-final:GA:c6bd89719b84c3a6ee32 already accepted by first-party materializer as reviewed:google-columbia-county-ga-20261029, operator Google, address independently unknown. No second site or inferred MW. Evidence
Operator Georgia milestones explicitly announce a new Columbia County development in 2026. County scope only; no verified site address, construction start, operation or power inferred. Evidence
Existing project record
research-final:GA:c6bd89719b84c3a6ee32Review notes availableProject JGK
Appling, GA
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Original GA1106 (Project JGK) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:f696be4017e5880fed9eReview notes availableWhite Oak Technology Park
Appling, GA · Trammell Crow Company; CBRE
Reported status: proposed
Exact location not published.
Original source · 2026-06-15
Review note: Original GA1107 (White Oak Technology Park) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:d080c1e2571dbcbf99a5Review notes availableAthens Studio Data Center
Athens, GA
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Original GA1108 (Athens Studio Data Center) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:39d7b82322454c13e744Review notes availableOld Elberton Road data center proposal
Athens, GA · FAE Clark LLC (property owner/applicant)
Reported status: rejected/denied
Exact location not published.
Original source · 2026-09-23
Review note: Original GA1109 (Old Elberton Road data center proposal) is research lead only. Require current operator/building/phase evidence and exact existing canonical and held-record collision; vendor operational/status, capacity, geometry and EPA permit claims are not physical operation proof.
research-final:GA:bbcf06deac2f0495d5a8