Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Source findings available

Clarksville Data Center

Clarksville, AR · Serverfarm

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Read 2 source findings (2026-10-28)

Serverfarm's ARK campus lists four planned buildings ARK1 through ARK4; 108MW per building is advertised design capacity. No exact DCE-derived coordinate or existing commissioned standalone building is certified by this page. Evidence

Original 135-acre campus reporting and larger historic building counts differ from updated operator four-building plan; property and phase scope must be reconciled. Do not treat DCE 'proposed' as evidence a second distinct project exists. Evidence

research-final:AR:f4db4409dbdb829f1bf3
Source findings available

Serverfarm ARK Clarksville Data Center Campus

Clarksville, AR · Serverfarm

Reported status: under construction

Reported capacity: 432 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-18

Read 2 source findings (2026-10-28)

Operator page calls Clarksville campus ARK1 through ARK4, each rated at 108 MW design building capacity, 300,000 sq ft and closed-loop recirculating cooling; first phase expected by early 2028. $6.6B is operator-estimated investment. Does not certify 2026 operation, metered IT MW or site boundaries. Evidence

Arkansas press reports an interim ADEQ authority for planned adjacent 40-turbine gas generation while Title V review continues. A power-plant authorization is not a full data-center building permit or facility operating certificate; gas-plant gross rating is not server IT load. Evidence

research-final:AR:75fc1c279ec3faaeb3ea
Source findings available

Conway Data Center (Forgelight Ventures)

Conway, AR · Forgelight Ventures LLC; Unknown Fortune 100 Company

Reported status: proposed

Reported capacity: 10 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Read 3 source findings (2026-10-28)

City of Conway publicly called May 12, 2026 meeting for citizen comment on the proposed data center. City notice does not document a construction permit, final binding utility agreement or commissioning. Evidence

The City Council approved an MOU with Forgelight Ventures for a possible unnamed Fortune-100 end user, reported $1B and 300k gross sq ft; end-user identity remains undisclosed and MOU does not equal full site approval. Evidence

The Little Rock Port/Willowbend project shares a formation agent and similar MOU wording, but is a separate location and possible competing proposal, not an approved duplicate of Conway. Do not infer the same Fortune-100 tenant. Evidence

research-final:AR:f39323ff43ad91229ca8
Source findings available

Jones Eagle Bitcoin Mine

DeWitt, AR · Jones Eagle LLC

Reported status: operational

Exact location not published.

Original source · 2026-08-26

Read 3 source findings (2026-10-28)

Jan 30 2026 E.D. Arkansas Jones Eagle LLC v. Ward (4:24-cv-00990-KGB) grants discovery relief in part; judicial proceedings and prior injunction do not certify current mining operation, location or MW. This is a discovery ruling, not a final merits decision. Evidence

Eighth Circuit appeal 25-1047 filed Jan 13 2025; accessible excerpt does not establish final appellate disposition. Do not infer a definitive resolution from the earlier preliminary injunction. Evidence

Supplier labels mine operational with DeWitt-area approximate point; the historical ~2800-machine account and approximate coordinate are not measured 2026 compute load or cadastral mapping. Evidence

research-final:AR:22ebfcd8da4a3eda8167
Source findings available

Paradox Data Union County Campus

El Dorado, AR · Paradox Data LLC (definitive agreement for acquisition by Z Squared Inc.)

Reported status: proposed

Reported capacity: 150 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-18

Read 3 source findings (2026-10-28)

SEC filing confirms 100% Paradox Data acquisition closed September 8, 2026. Seller remains tenant and operates existing Bitcoin-mining building under lease; power agreement remains in seller name and Entergy consent to assignment had NOT been obtained as reported. No phased AI compute milestones achieved by filing date. Evidence

Company reports up to approximately 8.0 MW existing interruptible Entergy grid service and 150+ MW future combined utility/generation target. Electrical service is not measured AI IT load; expansion is not contracted or energized. Press summary does not supersede more precise filed consent/lease qualifications. Evidence

Agreement identifies Union County campus 713 Industrial Road, El Dorado, and conditional expansion milestones. Address is not certified building geocode and milestone plan is not proof of achieved capacity. Evidence

research-final:AR:0fce4fb99693b4ee4090
Source findings available

OzarksGo Fayetteville Data Center

Fayetteville, AR · OzarksGo, LLC

Reported status: operational

Exact location not published.

Original source · 2026-09-29

Read 2 source findings (2026-10-28)

Operator offers full/half racks, private cages, 24/7 unescorted site access, dual AC/DC supply, generator/UPS and cross-connects, and claims Arkansas's only DNS root instance. Supports marketed colocation capability, not exact independently surveyed site pin, active tenant utilization or measured IT MW. Evidence

PeeringDB identifies OzarksGo facility at 3641 Wedington Dr with nine networks and location coordinates; status/registered peers reflect interconnection directory presence, not separately certified 2026 occupancy, power load or parcel geometry. Evidence

research-final:AR:b579af3b7a2f76be513d
Source findings available

ARE-ON Forrest City

Forrest City, AR · Arkansas Research and Education Optical Network (AREON)

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 2 source findings (2026-10-28)

PeeringDB shows ARE-ON Forrest City, 1802 New Castle Road, 1 connected network and zero local exchanges; last update Sep 26 2025. Directory listing supports network presence but cannot certify a separately operated 2026 data hall, measured IT capacity or licensed building point. Evidence

OzarksGo Fayetteville has separate facility ID 5522 and its own marketed colocation service. Do not merge ARE-ON Forrest City with OzarksGo or infer equivalent data-hall services from the common directory label. Evidence

research-final:AR:9d0865c3ce364cc38204
Source findings available

Project Pulse - Gum Springs Data Center

Gum Springs, AR · DC Devco LLC; unnamed end buyer

Reported status: cancelled

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Gum Springs. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 3 source findings (2026-10-28)

Economic Development Corp. of Clark County CEO confirms contracted $200,000 earnest deposit was not made in deadline, so DC Devco land agreement terminated under contractual terms. May 1 special meeting was called to acknowledge termination; not signed proof of every future reuse/cancellation. Evidence

May 1 EDCCC special meeting reported as formalizing contract termination of the proposed site purchase; obtain signed minutes/notification for primary final outcome before broader project-cancellation status. Evidence

Supplier timeline tags the April 16 proposed agreement and April 30 termination. The listed approximate Gum Springs point is a town centroid, not the 991-acre parcel. Power/GW and investment aspirations not energized IT load. Evidence

research-final:AR:b0e8ff85f0f7a82d8ffe
Source findings available

Green Digital Harrison Mine (proposed, withdrawn)

Harrison, AR · Green Digital LLC

Reported status: cancelled

Exact location not published.

Original source · 2026-08-05

Read 3 source findings (2026-10-28)

Chamber timeline distinguishes 2022 land negotiations, a reported January 2023 Entergy 10-MW contract, stopped construction in March pending city land-use process, and April 2023 conditional-use and large-scale-development applications. A power contract and preliminary site work do not prove a powered/operating mine. Evidence

May 25, 2023 City Council mayoral statement records Green Digital written withdrawal of its conditional-use permit; company might reapply. This is a withdrawn application, not a permanent ban on a parcel or a verified 2026 facility cancellation. Evidence

Harrison council removed a general crypto-mining moratorium in November 2023; removal did not reinstate Green Digital's withdrawn land-use application or approve operation. Evidence

research-final:AR:f043c01c45df2b1919c3
Source findings available

Harrison Data Center

Harrison, AR · Windstream

Reported status: operational

Exact location not published.

Original source · 2026-06-18

Read 2 source findings (2026-10-28)

Contemporaneous reporting on JLL eight-property switch portfolio lists Graham Street 202, Harrison, Arkansas at about 34,625 square feet and says tenant occupancy dated from at least 2014; only Lexington and Colorado Springs are specifically described as large data center hubs. Telco switch tenancy is not independent proof of a standalone commercial colocation data hall. Evidence

Source supplier links JLL 8-asset portfolio but exact original listing returned HTTP 404 in 2026 review; retrieve archived offering memorandum or deed/tenant filing before treating ownership, location or building type as current. Evidence

research-final:AR:2ae430da534609a2f31c
Source findings available

Apollo Project - Helena Harbor Data Center

Helena, AR · Stadium Partners; Garrison Data Partners

Reported status: cancelled

Reported capacity: 500 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Phillips County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-10-02

Read 2 source findings (2026-10-28)

Source reports Oct. 1 written statement from Helena Harbor counsel and economic-development director John Edwards that Port Authority never sold or leased land to Garrison or Stadium, had no current agreement or discussion, and that partners reportedly separated. Underlying signed communication not independently obtained; scope is this promoted land deal, not every future use of harbor land. Evidence

Promotional Apollo name and 500-MW marketed capacity are not a signed harbor deed, secured power, construction permit, commissioned data center, or utility-metered load. Evidence

research-final:AR:0eaed59a893431b17edb
Source findings available

BlockOps Helena-West Helena Bitcoin Mine (Dragon Woodland sawmill site)

Helena-West Helena, AR · BlockOps

Reported status: operational

Reported capacity: 8 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-18

Read 2 source findings (2026-10-28)

BlockOps' 2026 first-party account identifies its Helena-West Helena purchased sawmill and states company operates regional facilities. Its 2,900-miner and $13.5M investment descriptions are claims or projections, and it also describes the facility as something that 'will be' air cooled. Does not supply independently audited Oct. 2026 meter load, actual commissioning date, cadastral parcel boundary or utility service. Evidence

Supplier cites March 2025 municipal approval and 8-MW planned utility demand, and independently marks 2026 operation only operator-reported with no independent in-service check. Source geocode returned more than one address candidate; do not reuse it as exact mapped site. Evidence

research-final:AR:86116219ca5a572b88c1
Source findings available

ARE-ON Hope

Hope, AR · Arkansas Research and Education Optical Network (AREON)

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Read 2 source findings (2026-10-28)

PeeringDB Hope facility 1669 is listed at 358 Hwy 174 N, Hope, with two networks (AREON AS40581 and Southwest Arkansas Telephone Coop AS46632); the facility record was last updated September 26, 2025. Interconnection listing and published geocode do not establish a staffed data hall, 2026 energized rack inventory, MW draw or independently surveyed parcel. Evidence

AREON network AS40581 associates with both Hope (fac 1669) and Forrest City (fac 1670); those are distinct interconnection-location records, not evidence that an unknown number of commercial data-center halls operates at each. Evidence

research-final:AR:a4eea37b24ec804f018f
Source findings available

Ritter Communications Data Technology Center

Jonesboro, AR · Ritter Communications

Reported status: operational

Reported capacity: 0.75 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Read 2 source findings (2026-10-28)

Operator announced the November 2020 opening of an 8,544-square-foot multi-user facility with charter customers. This supports historical commissioning, not a new facility identity. Evidence

Operator offers colocation and cloud services and specifies 0.75 MW power capacity, 82 racks and N+2 backup. The 0.75 MW is directly supported as capacity, correcting the supplier note that it was merely investment-derived; it is not measured IT use. Footer address alone is not surveyed building geometry. Evidence

research-final:AR:7605ab8a665cec8c8d6a
Source findings available

AVAIO Digital Leo

Little Rock, AR · AVAIO Digital Partners; Entergy Arkansas

Reported status: proposed

Reported capacity: 1.1 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-08-25

Read 1 source findings (2026-10-28)

Developer describes ground breaking, approved site plan and executed Entergy ESA; initial grid energization is Q4 2027, later than supplier June 2027 occupancy. Page identifies 296 acres versus supplier narrative 760 acres, and planned 1070 MW baseload including 570 MW grid and 500 MW behind-the-meter. These are development/power scope, not operating IT load. Developer point 34.623375,-92.246825 differs from supplier point; neither replaces existing geometry in this review. Evidence

research-final:AR:874ba87c38cfc452b53a
Source findings available

Data center

Little Rock, AR · Willowbend Capital LLC

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Read 2 source findings (2026-10-28)

April 29 2025 city agenda lists authorization for a Willowbend development MOU at Little Rock Port. Agenda is evidence of scheduled governmental action, not a signed final approval or commissioning. Evidence

USACE search index identifies Willowbend applicant and a light industrial data-center complex under SWL 2026-00038. Full PDF retrieval returned 403; exact permit scope/outcome not independently read and not certified. Evidence

research-final:AR:b752a1bf59edfe873ad7
Source findings available

Little Rock Data Center

Little Rock, AR

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Read 1 source findings (2026-10-28)

EPA detailed-facility page could not be retrieved by search tool. Supplier regulatory record alone is unverified; no NAICS or CAA permits listed. Stated 30 m accuracy is registry metadata, not independent rooftop verification. Evidence

research-final:AR:6adcb724766e0957f3e6
Source findings available

Little Rock Data Center

Little Rock, AR

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Read 1 source findings (2026-10-28)

EPA detailed-facility page could not be retrieved by search tool. Supplier regulatory record alone is unverified; no NAICS or CAA permits listed. Stated 30 m accuracy is registry metadata, not independent rooftop verification. Evidence

research-final:AR:c99a5aefd7a01f6d4a89
Source findings available

Little Rock Port Data Center (Willowbend Capital)

Little Rock, AR · Willowbend Capital LLC; Google LLC

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Little Rock. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Read 3 source findings (2026-10-28)

Google confirms its April 2026 purchase of land for a potential Port of Little Rock data center; the project page still labels engineering/environmental/utility diligence and public reviews in progress, final construction decision future. It separately reports June 2026 USACE Section 404 application withdrawal for design optimization, not final permit approval or permanent cancellation. Evidence

Little Rock Water Reclamation Authority describes one prospective Google data center at the Port and a 2025 wastewater treatment feasibility evaluation. Sewage capacity and funding commitments are not an operating computing facility, 2026 energized MW, final building permits, or exact parcel. Evidence

City meeting agenda archive is a path for signed MOU/ordinance and later decisions; the existence of a city process does not establish final site approval. Supplier Census point is the Little Rock city centroid, not the purchased Port parcel. Evidence

research-final:AR:272ba69c894876751bc9
Source findings available

Mainstream Technologies Little Rock Data Center

Little Rock, AR · Mainstream Technologies

Reported status: operational

Exact location not published.

Original source · 2026-09-29

Read 2 source findings (2026-10-28)

Operator advertises a dedicated downtown Little Rock colocation site with raised floor, N+1 electrical/cooling and 24/7 access. This is first-party site-existence/service evidence, not independently dated occupied IT load, audited building boundary or energized MW. Evidence

PeeringDB facility 14193 lists Mainstream Little Rock, 325 West Capitol Avenue Suite 200, and 2025-09-26 listing update with four networks. Status ok and published map point are directory data only; do not treat as separate proof of 2026 commissioned capacity. Evidence

research-final:AR:969660290a6b6ac7f5ca
Source findings available

Sollensys Little Rock Data Center

Little Rock, AR · Sollensys Corp

Reported status: operational

Exact location not published.

Original source · 2026-10-18

Read 2 source findings (2026-10-28)

Sollensys reported an April 2022 acquisition of a 5,044-sq-ft former data-center building on approximately one acre in Little Rock. The historic announcement describes backup generator and cooling infrastructure, not current 2026 operations or IT load. Evidence

SEC filing discusses the acquisition and Celerit context. It does not establish present operator, exact building survey, occupied racks, or service continuity in October 2026. Evidence

research-final:AR:2717ef65f6cf3ef60581
Source findings available

TierPoint Little Rock Data Center

Little Rock, AR · TierPoint

Reported status: operational

Exact location not published.

Original source · 2026-07-18

Read 3 source findings (2026-10-28)

Operator lists Little Rock (LIT), 15707 Chenal Parkway, as NOW AVAILABLE with 30,000+ total square feet and 9,000+ raised floor; two 2.25 MW generators are backup equipment, not 4.5 MW measured customer IT demand. Evidence

Operator's current facilities index includes a Little Rock center; site existence is supported but does not validate imported third-party coordinate precision or current 2026 utilized MW. Evidence

PeeringDB facility object 8593 is an identity reference only. Existing IM3 building 00388148510 is a separate published source reference, not proof of a second canonical facility. Evidence

research-final:AR:47885cea1052bbd213bf
Source findings available

Arvest Data Center

Lowell, AR

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Read 2 source findings (2026-10-28)

Supplier lists FRS 110025073792 under Arvest Data Center, South Goad Springs Road, Lowell. EPA detailed record could not be independently retrieved; no NAICS or CAA program is listed in supplier data. A registry point with stated 30m accuracy does not verify a 2026 computing operation or exact data hall. Evidence

EPA describes FRS as environmental identity aggregation. Existence of a record, status value, or permit does not prove operational compute load. Evidence

research-final:AR:eccc4cd672622904eef7
Source findings available

J B Hunt Transport Data Center

Lowell, AR

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Read 1 source findings (2026-10-28)

Direct EPA detail retrieval unavailable. Supplier names a data-center environmental record without NAICS or air program. No current corporate facility or compute operation established. Evidence

research-final:AR:87442d3ecb950693432a
Source findings available

Wave Garden Macedonia Cryptomine

Macedonia, AR · Wave Garden, LLC

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Read 1 source findings (2026-10-28)

Reprint describes a mine already operating off County Road 12 and resident noise concerns in 2024. The reprint and its original are one reporting chain, not two independent confirmations. No current operator or 2026 site inspection obtained. Evidence

research-final:AR:30e9ee29634327eee51b
Source findings available

BTC Digital Manila Bitcoin Mining and Hosting Facility

Manila, AR · BTC Digital Ltd.

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Read 2 source findings (2026-10-28)

Issuer identifies Manila hosting facility and signed Tianci agreement. Service start depends on equipment delivery, registration, testing and written notice. Signed hosting agreement alone does not certify service commencement or metered load. Evidence

Issuer describes unnamed Arkansas facility acquisition for $1.99M using the dimensionally invalid 6MV power phrase. City is absent; completion wording includes future ownership language. No independent link to Manila, no silent conversion to 6 MW, and no 2026 capacity proof. Evidence

research-final:AR:b7f3ef3f5bd81dc6e36f
Source findings available

BlockOps Marion Bitcoin Mine (planned)

Marion, AR · BlockOps

Reported status: proposed

Exact location not published.

Original source · 2026-09-15

Read 1 source findings (2026-10-28)

Current operator page distinguishes existing Moreland and Russellville operations from further development planned in Marion. No Marion parcel, timetable, commissioned building or power figure published. Portfolio figures for Helena cannot be transferred. Evidence

research-final:AR:87e8376b7bf0e70223b7
Source findings available

BlockOps Moreland Bitcoin Mine

Moreland, AR · BlockOps

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Read 1 source findings (2026-10-28)

Operator directly says it operates in Moreland in rural Pope County and distinguishes planned Marion. Page cautions historical investment and machine counts are approval-time figures rather than current operating report; no Moreland-specific capacity, parcel or commissioning receipt. Evidence

research-final:AR:91a8a45d0238a00d3a2d
Source findings available

Moreland Holding Cryptomine

Moreland, AR · Moreland Holding LLC

Reported status: proposed

Exact location not published.

Original source · 2026-09-15

Read 2 source findings (2026-10-29)

KATV March 10, 2024 reports two distinct mine proposals in Moreland, one associated with Moreland Holding LLC and another with BlockOps across the street from First Baptist Church. Reporting does not establish that Moreland Holding completed construction, energized service or operates in October 2026; residents' ownership allegations are not proven corporate control. Evidence

Compute Atlas currently labels this distinct Moreland Holding project proposed based on 2024 reporting and gives only a Moreland community-level coordinate. The 2026 compilation date is not present-day operational evidence. Evidence

research-final:AR:45bb86c0b561a49225bb
Source findings available

GMI Computing Mountain Pine Bitcoin Mine

Mountain Pine, AR · GMI Computing (General Mint Inc.)

Reported status: operational

Exact location not published.

Original source · 2026-09-13

Read 2 source findings (2026-10-29)

KATV October 10, 2023 interviewed neighbors at GMI Computing's then newly operating crypto mine and reported the city noise ordinance and soundproofing order. This proves historical activity, not continued operation, completed noise remediation or October 2026 operating status. Evidence

Supplier facility label remains operational but its status-history basis is 2023 reporting; no dated current commissioning, exact road address or measured IT/mining load verified. Evidence

research-final:AR:779748591c9c33413bc4
Research database | Compute Equity Atlas