6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Source findings available

BlockOps Russellville Bitcoin Mine

Russellville, AR · BlockOps

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Read 2 source findings (2026-10-29)

BlockOps' October 8, 2026 operator statement says it operates a Russellville mine as well as Moreland and Helena sites while Marion remains planned. Its disclosed industrial-capacity, machine and investment figures are historical and Helena-related, not a Russellville-specific metered MW or commissioning receipt. Evidence

KATV in March 2024 described BlockOps as already having a Russellville mining site while discussing a different new Moreland mine. Does not establish 2026 parcel, building, load or regulatory condition for Russellville. Evidence

research-final:AR:9c0f439fa93218bdba7d
Source findings available

Brightspeed Data Center

Russellville, AR

Reported status: operational

Exact location not published.

Original source · 2026-06-18

Read 2 source findings (2026-10-29)

DCD April 9, 2025 reports Cushman & Wakefield/Sage Partners offering 214 S Denver Ave as a 44,650-square-foot former CenturyLink telecom property for $4.5M sale-leaseback with proposed 20-year terms. Offered leaseback does not prove closing, identity of tenant, dedicated 2026 IT hall, operating capacity or MW. Evidence

Directory associates the Russellville address and footprint with Brightspeed, but secondary colocation features are not independent evidence of the current lease, data-hall occupancy or electrical load. Evidence

research-final:AR:679a2bcf0afc8378022b
Source findings available

Searcy Information Technologies

Searcy, AR · City of Searcy

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Read 2 source findings (2026-10-29)

City of Searcy currently lists its IT Building at 107 N Elm and describes a fiber-backed network operations center with protected access, backup generator, cooling and an internal server farm. The municipal description does not certify that supplied OSM way represents an independent 4,580-square-foot data hall, surveyed point, current operating IT MW or commercial facility. Evidence

OSM way 1020721870 is the source footprint behind the supplier/DCE and existing IM3 building reference im3:building:01020721870. Address/provenance must reconcile with the city's 107 N Elm listing; multiple source IDs describe one referenced object, not three separate centers. Evidence

research-final:AR:31e74c572d891239acc9
Source findings available

Sheridan Data Center (Clean Cloud Energy, Grant County)

Sheridan, AR · Clean Cloud Energy (Sheridan Data Center LLC)

Reported status: proposed

Reported capacity: 800 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-18

Read 1 source findings (2026-10-28)

Official catalog identifies Resolution 2025-06 as preliminary intent for Sheridan PILOT, not final construction or operating approval. County-hosted process does not substantiate supplier government/education keyword type. Evidence

research-final:AR:b3c1c1893298d5899e87
Source findings available

Tyson Foods, Inc. Data Center

Springdale, AR

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

Read 2 source findings (2026-10-28)

Primary ECHO detail unavailable. Supplier gives no NAICS/CAA evidence and 99999999 m accuracy, an unusable precision value. Evidence

Second FRS ID unavailable for independent review. Two registry references do not prove two operating data halls or an approved duplicate merge; 500 SE Walton Boulevard, supplied city and point need reconciliation. Evidence

research-final:AR:5933f3a2fa303d5a3b0d
Source findings available

Bentaus Texarkana AI Data Center (Chadbourne Ranch site)

Texarkana, AR · Bentaus

Reported status: proposed

Reported capacity: 200 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-15

Read 1 source findings (2026-10-28)

Developer announces site acquisition, initial 48-MW ESA, expansion up to 200 MW and up to 3000 acres, with Chadbourn expected co-development. Contract and expansion claims do not certify energized IT demand or final permits. Evidence

research-final:AR:2ebfd89ceb8a625abcc4
Source findings available

Interstate Holdings Blockchain Vilonia Mine (proposed, denied)

Vilonia, AR · Interstate Holdings Blockchain

Reported status: cancelled

Exact location not published.

Original source · 2026-08-05

Read 2 source findings (2026-10-28)

May 20 2025 agenda index identifies conditional-use denial request from planning commission; redirected full PDF inaccessible. Agenda alone does not certify final council vote. Evidence

Dated report describes council rejection of the named proposal. Bounded reported application outcome, not permanent corporate cancellation or proof no appeal/reapplication exists. Evidence

research-final:AR:a458de70e52b1f242f3a
Source findings available

ImmersionBTC Walnut Ridge Mine

Walnut Ridge, AR · ImmersionBTC

Reported status: operational

Exact location not published.

Original source · 2026-08-05

Read 1 source findings (2026-10-28)

Mayor distinguishes first mine on Custom Road near airport from second under construction on Midway Road. Report does not independently name ImmersionBTC as first-site owner or establish current operation. Evidence

research-final:AR:d247e1fa4dd8e8e8223e
Source findings available

Google West Memphis Data Center

West Memphis, AR · Google (Groot LLC)

Reported status: under construction

Exact location not published.

Original source · 2026-09-24

Read 2 source findings (2026-10-28)

Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence

State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence

research-final:AR:63c88e844380499355e8
Source findings available

Google West Memphis Data Center (Project Pyramid)

West Memphis, AR · Google LLC

Reported status: under construction

Reported capacity: 1.4 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for West Memphis. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Read 2 source findings (2026-10-28)

Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence

State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence

research-final:AR:dc4923a5583ea6b9e19b
Source findings available

Google West Memphis data center campus

West Memphis, AR · Google LLC

Reported status: under construction

Exact location not published.

Original source · 2026-02-26

Read 2 source findings (2026-10-28)

Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence

State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence

research-final:AR:cfdd2099f7ec56dc4501
Source findings available

Unnamed research feature in Apache Junction

Apache Junction, AZ

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

Read 1 source findings (2026-10-28)

Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence

research-final:AZ:dbad9525e3687001448f
Source findings available

Unnamed research feature in Apache Junction

Apache Junction, AZ

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

Read 1 source findings (2026-10-28)

Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence

research-final:AZ:3ad2110a1aa6a5b6e729
Source findings available

Unnamed research feature in Apache Junction

Apache Junction, AZ

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

Read 1 source findings (2026-10-28)

Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence

research-final:AZ:c2c5edbc0b1022535050
Source findings available

CyrusOne Mesa PHX20 — Shell Building 1, two-storey 243,332 sq ft data hall building under construction (Mesa permit PMT25-13240)

Apache Junction, AZ · CyrusOne

Reported status: under construction

Exact location not published.

Original source · 2026-10-16

Read 2 source findings (2026-10-28)

Bounded 100-record sample at 3255 S 96th St lists Mesa municipality with rough-in/partial approvals through October 21 2026; sample is capped and not proof no final exists. City address point differs from supplier building point. Evidence

Operator describes civil grading permit PMT25-11012 from November 2025 for future buildings, not a completed operating hall. Existing Chandler PHX1-PHX8 campus must not be conflated with Mesa PHX20 supplier label. Evidence

research-final:AZ:51a9814824dbec3a7ffe
Source findings available

NTT Phoenix (Mesa) PH5 — Building 3, two-storey 225,606 sq ft data center under construction (Mesa permit PMT24-17530)

Apache Junction, AZ · NTT Global Data Centers Americas

Reported status: under construction

Exact location not published.

Original source · 2026-10-07

Read 2 source findings (2026-10-28)

82 records bind PMT24-17530 to 10256 E Elliot Rd Building 3, Mesa. Electric Final approved September 29 2026 and Zoning Final canceled October 20 are distinct inspections, not whole-building occupancy or operational certification. PH5 label not resolved by Building 3 alone. Evidence

NTT publishes PH1 at Elliot Road Mesa. PH1 36-MW critical IT design and 240-MW campus design are not Building 3/PH5 measured IT; separate PH10 expansion is not automatically same project. Evidence

research-final:AZ:8eba93eefc2fe2f57005
Source findings available

Unnamed source-mapped location

Apache Junction, AZ

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Read 1 source findings (2026-10-28)

DOI landing unavailable. Immutable reconciliation matches five published building IDs; database presence does not independently establish one operating facility. Three IDs overlap distinct OSM features reviewed in rows 132–134; not five additional data centers. Evidence

research-final:AZ:e855491b1641ea0e9f2a
Source findings available

Avondale Campus

Avondale, AZ · Prime Data Centers

Reported status: under construction

Reported capacity: 240 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

Read 1 source findings (2026-10-28)

Operator states five-building 240-MW IT design, 48 MW each; first three buildings broke ground. Commissioned first substation phase is not delivery of 144 MW of operating IT. Conflicts with older 210-MW supplier description. Evidence

research-final:AZ:5b0c643a666c32e7d524
Source findings available

Prime Data Centers Phoenix Campus

Avondale, AZ · Prime Data Centers

Reported status: under construction

Reported capacity: 210 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Read 1 source findings (2026-10-28)

Current operator identifies 66.5-acre Avondale campus, five 48-MW IT design buildings, and first-three-building groundbreaking. Supplier older 210-MW description must not add capacity to the same 240-MW planned campus or imply current IT load. Evidence

research-final:AZ:dcdd773e1ce646ed7358
Source findings available

STACK Infrastructure PHX01 Campus

Avondale, AZ · STACK Infrastructure

Reported status: operational

Reported capacity: 225 MW planned (scope and operation unverified)

Source reference: address match (exact): 3001 S LITCHFIELD RD, AVONDALE, AZ, 85323. Census Geocoder; not a verified facility pin.

Original source · 2026-09-10

Read 1 source findings (2026-10-28)

Current operator lists PHX01 Avondale at 225-MW critical capacity and PHX02 Central Phoenix at 250-MW capacity. Neither is measured energized IT and site figures must not be added as PHX01 demand. Supplier 500-MW two-campus aggregate is not current exact per-campus design. Evidence

research-final:AZ:8cd95aba7eeadc4c490c
Source findings available

DirecTV

Benson, AZ · DirecTV

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Read 1 source findings (2026-10-28)

Exact OSM way version 2 dated July 27 2025 tags building=data_center, telecom=data_center, operator=DirecTV and 401 Direct Way, Benson. This supports database-record identity, not independent operator confirmation of 2026 compute operation or MW. DCE derivative is not independent second evidence. Evidence

research-final:AZ:8d92cb7e2bc604b1fb1d
Awaiting source review

Unnamed source-mapped location

Benson, AZ · DirecTV

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

research-final:AZ:7f1177c45ddf5807205f
Awaiting source review

Buckeye Tech Corridor

Buckeye, AZ · Tract

Reported status: approved/permitted

Reported capacity: 1800 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

research-final:AZ:db5890c77412e5cc9966
Awaiting source review

Maricopa Data Center

Buckeye, AZ · Fortescue

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

research-final:AZ:4ce59176b77411b70b87
Awaiting source review

Project Range

Buckeye, AZ · Tract

Reported status: proposed

Exact location not published.

Original source · 2026-08-28

research-final:AZ:ec303e6cb9b3717848c7
Awaiting source review

Tract Buckeye Data Center Park

Buckeye, AZ · Tract

Reported status: proposed

Reported capacity: 1.8 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-02-05

research-final:AZ:7235c16801052d31aa54
Awaiting source review

QTS Pinal County Campus

Cactus Forest, AZ · QTS Realty Trust, LLC

Reported status: under construction

Reported capacity: 420.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-21

research-final:AZ:50f56b5be7b81c16ac65
Awaiting source review

Project Midway Data Center

Casa Grande, AZ · LPI Group

Reported status: proposed

Reported capacity: 400 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-10

research-final:AZ:cb820530d366311a611b
Awaiting source review

Southwest Crossing Data Center

Casa Grande, AZ · Ryan Companies

Reported status: proposed

Reported capacity: 400 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Casa Grande. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

research-final:AZ:fcdf5e52926d2c2a2c53
Awaiting source review

All About Serving Process Server

Chandler, AZ

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10 (QLever osm-planet)

research-final:AZ:ce702651a2aec384d32d