Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Source findings availableBlockOps Russellville Bitcoin Mine
Russellville, AR · BlockOps
Reported status: operational
Exact location not published.
Original source · 2026-09-15
Read 2 source findings (2026-10-29)
BlockOps' October 8, 2026 operator statement says it operates a Russellville mine as well as Moreland and Helena sites while Marion remains planned. Its disclosed industrial-capacity, machine and investment figures are historical and Helena-related, not a Russellville-specific metered MW or commissioning receipt. Evidence
KATV in March 2024 described BlockOps as already having a Russellville mining site while discussing a different new Moreland mine. Does not establish 2026 parcel, building, load or regulatory condition for Russellville. Evidence
research-final:AR:9c0f439fa93218bdba7dSource findings availableBrightspeed Data Center
Russellville, AR
Reported status: operational
Exact location not published.
Original source · 2026-06-18
Read 2 source findings (2026-10-29)
DCD April 9, 2025 reports Cushman & Wakefield/Sage Partners offering 214 S Denver Ave as a 44,650-square-foot former CenturyLink telecom property for $4.5M sale-leaseback with proposed 20-year terms. Offered leaseback does not prove closing, identity of tenant, dedicated 2026 IT hall, operating capacity or MW. Evidence
Directory associates the Russellville address and footprint with Brightspeed, but secondary colocation features are not independent evidence of the current lease, data-hall occupancy or electrical load. Evidence
research-final:AR:679a2bcf0afc8378022bSource findings availableSearcy Information Technologies
Searcy, AR · City of Searcy
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Read 2 source findings (2026-10-29)
City of Searcy currently lists its IT Building at 107 N Elm and describes a fiber-backed network operations center with protected access, backup generator, cooling and an internal server farm. The municipal description does not certify that supplied OSM way represents an independent 4,580-square-foot data hall, surveyed point, current operating IT MW or commercial facility. Evidence
OSM way 1020721870 is the source footprint behind the supplier/DCE and existing IM3 building reference im3:building:01020721870. Address/provenance must reconcile with the city's 107 N Elm listing; multiple source IDs describe one referenced object, not three separate centers. Evidence
research-final:AR:31e74c572d891239acc9Source findings availableSheridan Data Center (Clean Cloud Energy, Grant County)
Sheridan, AR · Clean Cloud Energy (Sheridan Data Center LLC)
Reported status: proposed
Reported capacity: 800 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-18
Read 1 source findings (2026-10-28)
Official catalog identifies Resolution 2025-06 as preliminary intent for Sheridan PILOT, not final construction or operating approval. County-hosted process does not substantiate supplier government/education keyword type. Evidence
research-final:AR:b3c1c1893298d5899e87Source findings availableTyson Foods, Inc. Data Center
Springdale, AR
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
Read 2 source findings (2026-10-28)
Primary ECHO detail unavailable. Supplier gives no NAICS/CAA evidence and 99999999 m accuracy, an unusable precision value. Evidence
Second FRS ID unavailable for independent review. Two registry references do not prove two operating data halls or an approved duplicate merge; 500 SE Walton Boulevard, supplied city and point need reconciliation. Evidence
research-final:AR:5933f3a2fa303d5a3b0dSource findings availableBentaus Texarkana AI Data Center (Chadbourne Ranch site)
Texarkana, AR · Bentaus
Reported status: proposed
Reported capacity: 200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-15
Read 1 source findings (2026-10-28)
Developer announces site acquisition, initial 48-MW ESA, expansion up to 200 MW and up to 3000 acres, with Chadbourn expected co-development. Contract and expansion claims do not certify energized IT demand or final permits. Evidence
research-final:AR:2ebfd89ceb8a625abcc4Source findings availableInterstate Holdings Blockchain Vilonia Mine (proposed, denied)
Vilonia, AR · Interstate Holdings Blockchain
Reported status: cancelled
Exact location not published.
Original source · 2026-08-05
Read 2 source findings (2026-10-28)
May 20 2025 agenda index identifies conditional-use denial request from planning commission; redirected full PDF inaccessible. Agenda alone does not certify final council vote. Evidence
Dated report describes council rejection of the named proposal. Bounded reported application outcome, not permanent corporate cancellation or proof no appeal/reapplication exists. Evidence
research-final:AR:a458de70e52b1f242f3aSource findings availableImmersionBTC Walnut Ridge Mine
Walnut Ridge, AR · ImmersionBTC
Reported status: operational
Exact location not published.
Original source · 2026-08-05
Read 1 source findings (2026-10-28)
Mayor distinguishes first mine on Custom Road near airport from second under construction on Midway Road. Report does not independently name ImmersionBTC as first-site owner or establish current operation. Evidence
research-final:AR:d247e1fa4dd8e8e8223eSource findings availableGoogle West Memphis Data Center
West Memphis, AR · Google (Groot LLC)
Reported status: under construction
Exact location not published.
Original source · 2026-09-24
Read 2 source findings (2026-10-28)
Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence
State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence
research-final:AR:63c88e844380499355e8Source findings availableGoogle West Memphis Data Center (Project Pyramid)
West Memphis, AR · Google LLC
Reported status: under construction
Reported capacity: 1.4 GW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for West Memphis. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-19
Read 2 source findings (2026-10-28)
Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence
State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence
research-final:AR:dc4923a5583ea6b9e19bSource findings availableGoogle West Memphis data center campus
West Memphis, AR · Google LLC
Reported status: under construction
Exact location not published.
Original source · 2026-02-26
Read 2 source findings (2026-10-28)
Google announces Arkansas investment through 2027 including West Memphis and a separate planned 600-MW solar project. Solar generation is not facility IT demand. Evidence
State announces campus construction on more than 1000 acres. Historic construction report does not establish current commissioning or exact building point. Evidence
research-final:AR:cfdd2099f7ec56dc4501Source findings availableUnnamed research feature in Apache Junction
Apache Junction, AZ
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Read 1 source findings (2026-10-28)
Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence
research-final:AZ:dbad9525e3687001448fSource findings availableUnnamed research feature in Apache Junction
Apache Junction, AZ
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Read 1 source findings (2026-10-28)
Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence
research-final:AZ:3ad2110a1aa6a5b6e729Source findings availableUnnamed research feature in Apache Junction
Apache Junction, AZ
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
Read 1 source findings (2026-10-28)
Current version 1 dated December 8 2025 has building=yes and telecom=data_center, with no name/operator/address tags. Feature existence and database tag cannot certify operating data hall or ownership; no geometry copied. Evidence
research-final:AZ:c2c5edbc0b1022535050Source findings availableCyrusOne Mesa PHX20 — Shell Building 1, two-storey 243,332 sq ft data hall building under construction (Mesa permit PMT25-13240)
Apache Junction, AZ · CyrusOne
Reported status: under construction
Exact location not published.
Original source · 2026-10-16
Read 2 source findings (2026-10-28)
Bounded 100-record sample at 3255 S 96th St lists Mesa municipality with rough-in/partial approvals through October 21 2026; sample is capped and not proof no final exists. City address point differs from supplier building point. Evidence
Operator describes civil grading permit PMT25-11012 from November 2025 for future buildings, not a completed operating hall. Existing Chandler PHX1-PHX8 campus must not be conflated with Mesa PHX20 supplier label. Evidence
research-final:AZ:51a9814824dbec3a7ffeSource findings availableNTT Phoenix (Mesa) PH5 — Building 3, two-storey 225,606 sq ft data center under construction (Mesa permit PMT24-17530)
Apache Junction, AZ · NTT Global Data Centers Americas
Reported status: under construction
Exact location not published.
Original source · 2026-10-07
Read 2 source findings (2026-10-28)
82 records bind PMT24-17530 to 10256 E Elliot Rd Building 3, Mesa. Electric Final approved September 29 2026 and Zoning Final canceled October 20 are distinct inspections, not whole-building occupancy or operational certification. PH5 label not resolved by Building 3 alone. Evidence
NTT publishes PH1 at Elliot Road Mesa. PH1 36-MW critical IT design and 240-MW campus design are not Building 3/PH5 measured IT; separate PH10 expansion is not automatically same project. Evidence
research-final:AZ:8eba93eefc2fe2f57005Source findings availableUnnamed source-mapped location
Apache Junction, AZ
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
Read 1 source findings (2026-10-28)
DOI landing unavailable. Immutable reconciliation matches five published building IDs; database presence does not independently establish one operating facility. Three IDs overlap distinct OSM features reviewed in rows 132–134; not five additional data centers. Evidence
research-final:AZ:e855491b1641ea0e9f2aSource findings availableAvondale Campus
Avondale, AZ · Prime Data Centers
Reported status: under construction
Reported capacity: 240 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-10
Read 1 source findings (2026-10-28)
Operator states five-building 240-MW IT design, 48 MW each; first three buildings broke ground. Commissioned first substation phase is not delivery of 144 MW of operating IT. Conflicts with older 210-MW supplier description. Evidence
research-final:AZ:5b0c643a666c32e7d524Source findings availablePrime Data Centers Phoenix Campus
Avondale, AZ · Prime Data Centers
Reported status: under construction
Reported capacity: 210 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Read 1 source findings (2026-10-28)
Current operator identifies 66.5-acre Avondale campus, five 48-MW IT design buildings, and first-three-building groundbreaking. Supplier older 210-MW description must not add capacity to the same 240-MW planned campus or imply current IT load. Evidence
research-final:AZ:dcdd773e1ce646ed7358Source findings availableSTACK Infrastructure PHX01 Campus
Avondale, AZ · STACK Infrastructure
Reported status: operational
Reported capacity: 225 MW planned (scope and operation unverified)
Source reference: address match (exact): 3001 S LITCHFIELD RD, AVONDALE, AZ, 85323. Census Geocoder; not a verified facility pin.
Original source · 2026-09-10
Read 1 source findings (2026-10-28)
Current operator lists PHX01 Avondale at 225-MW critical capacity and PHX02 Central Phoenix at 250-MW capacity. Neither is measured energized IT and site figures must not be added as PHX01 demand. Supplier 500-MW two-campus aggregate is not current exact per-campus design. Evidence
research-final:AZ:8cd95aba7eeadc4c490cSource findings availableDirecTV
Benson, AZ · DirecTV
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Read 1 source findings (2026-10-28)
Exact OSM way version 2 dated July 27 2025 tags building=data_center, telecom=data_center, operator=DirecTV and 401 Direct Way, Benson. This supports database-record identity, not independent operator confirmation of 2026 compute operation or MW. DCE derivative is not independent second evidence. Evidence
research-final:AZ:8d92cb7e2bc604b1fb1dAwaiting source reviewUnnamed source-mapped location
Benson, AZ · DirecTV
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-02-09
research-final:AZ:7f1177c45ddf5807205fAwaiting source reviewBuckeye Tech Corridor
Buckeye, AZ · Tract
Reported status: approved/permitted
Reported capacity: 1800 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
research-final:AZ:db5890c77412e5cc9966Awaiting source reviewMaricopa Data Center
Buckeye, AZ · Fortescue
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
research-final:AZ:4ce59176b77411b70b87Awaiting source reviewProject Range
Buckeye, AZ · Tract
Reported status: proposed
Exact location not published.
Original source · 2026-08-28
research-final:AZ:ec303e6cb9b3717848c7Awaiting source reviewTract Buckeye Data Center Park
Buckeye, AZ · Tract
Reported status: proposed
Reported capacity: 1.8 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-02-05
research-final:AZ:7235c16801052d31aa54Awaiting source reviewQTS Pinal County Campus
Cactus Forest, AZ · QTS Realty Trust, LLC
Reported status: under construction
Reported capacity: 420.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-21
research-final:AZ:50f56b5be7b81c16ac65Awaiting source reviewProject Midway Data Center
Casa Grande, AZ · LPI Group
Reported status: proposed
Reported capacity: 400 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-10
research-final:AZ:cb820530d366311a611bAwaiting source reviewSouthwest Crossing Data Center
Casa Grande, AZ · Ryan Companies
Reported status: proposed
Reported capacity: 400 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Casa Grande. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-18
research-final:AZ:fcdf5e52926d2c2a2c53Awaiting source reviewAll About Serving Process Server
Chandler, AZ
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-10 (QLever osm-planet)
research-final:AZ:ce702651a2aec384d32d