Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

DataBank Chicago (ORD2)

Chicago, IL · DataBank, Ltd.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:665b68d41a1d0704f95f
Review notes available

Digital Realty - ORD10 (350 East Cermak)

Chicago, IL · Digital Realty

Reported status: operational

Reported capacity: 109 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Digital Realty first-party ORD10 at 350 E Cermak, existing Lakeside Technology Center physical building; source-reported 109MW not inferred actual IT demand.

Read 1 source findings (2026-10-31)

Digital Realty first-party ORD10 at 350 E Cermak, existing Lakeside Technology Center physical building; source-reported 109MW not inferred actual IT demand. Evidence

research-final:IL:96e3b7d6f6d486405b34
Review notes available

Digital Realty 330 E. Cermak Current Facility Build

Chicago, IL · Colocation America Corporation

Reported status: under construction

Exact location not published.

Original source · 2026-07-19

Review note: Original 330 E Cermak source points into Digital Realty's 350 Cermak campus. Official redevelopment page does not support a distinct operating building, power or exact new geometry.

Read 1 source findings (2026-10-31)

Original 330 E Cermak source points into Digital Realty's 350 Cermak campus. Official redevelopment page does not support a distinct operating building, power or exact new geometry. Evidence

research-final:IL:2326f21d75f475c2ca3a
Review notes available

Digital Realty ORD10

Chicago, IL · Digital Realty

Reported status: operational

Exact location not published.

Original source · 2026-07-23

Review note: Same Digital Realty ORD10 location as CSV1591, 350 E Cermak; vendor ODbL geometry rejected.

Read 1 source findings (2026-10-31)

Same Digital Realty ORD10 location as CSV1591, 350 E Cermak; vendor ODbL geometry rejected. Evidence

research-final:IL:5fe0ca6ff8db39012c1b
Accepted facility identity linked

Digital Realty ORD11

Chicago, IL · Digital Realty

Reported status: operational

Exact location not published.

Original source · 2026-07-23

Review note: Digital Realty first-party independently confirms ORD11 at 600 S Federal, and existing published root uses this original research ID; distinct from ORD10 350 E Cermak.

Read 2 source findings (2026-10-31)

Digital Realty first-party independently confirms ORD11 at 600 S Federal, and existing published root uses this original research ID; distinct from ORD10 350 E Cermak. Evidence

Digital Realty identifies this eight-story carrier-hotel building. DataBank ORD1 occupies suites 150 and 142 at the same address; one physical-location record is admitted, not another building for the tenant. Evidence

Existing project record

research-final:IL:d84311327ce85331b261
Review notes available

Equinix CH1

Chicago, IL · Equinix

Reported status: operational

Reported capacity: 6.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-23

Review note: Equinix CH1 occupies 350 E Cermak already represented by Lakeside/Digital Realty ORD10; retain tenant identity without duplicating building.

Read 1 source findings (2026-10-31)

Equinix CH1 occupies 350 E Cermak already represented by Lakeside/Digital Realty ORD10; retain tenant identity without duplicating building. Evidence

research-final:IL:7765cddcde451912ba3c
Review notes available

Fidelity Information Serivces

Chicago, IL

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 5 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:a78768a62c08c6f5c579
Review notes available

HydraVault - Chicago AI Data Center

Chicago, IL · HydraVault; Power Construction; Gensler

Reported status: under construction

Reported capacity: 20 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:4fb91523d7f10d07efac
Review notes available

Iron Mountain Data & Record Storage

Chicago, IL · Iron Mountain Incorporated

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Iron Mountain Data & Record Storage category alone does not establish a currently operated colocation or hyperscale data hall.

research-final:IL:eb02bb6cf1881ff563ad
Review notes available

Lakeside Technology Center

Chicago, IL

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Lakeside Technology Center is the existing physical building at 350 E Cermak; compare with ORD10 original source CSV1591/1593.

Read 1 source findings (2026-10-31)

Lakeside Technology Center is the existing physical building at 350 E Cermak; compare with ORD10 original source CSV1591/1593. Evidence

research-final:IL:342071f3cba09a046a74
Review notes available

Lambda Chicago EdgeConneX AI Factory

Chicago, IL · Lambda

Reported status: under construction

Reported capacity: 23 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:8daecb7026bce69955f9
Review notes available

Level(3) Chicago (Canal)

Chicago, IL · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:1144e2a2f501dcbb00a9
Review notes available

Level(3) Chicago (Kingsbury)

Chicago, IL · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:6377a9e42247f6dba89a
Review notes available

Menlo Digital Chicago Exchange (601 West Polk)

Chicago, IL · Menlo Digital (Menlo Equities)

Reported status: operational

Reported capacity: 8 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-25

Review note: Original source record inspected; current independent site/operator evidence and exact campus/tenant/collision mapping remain unresolved. Neither archive operating status nor supplied coordinates are adopted.

research-final:IL:536319c8527256ede8bb
Review notes available

Metro Edge - Illinois Medical District

Chicago, IL · Metro Edge Development Partners

Reported status: proposed

Reported capacity: 53 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Chicago. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Metro Edge IMD1 Illinois Medical District project; independent developer confirms one 4-floor project; not independently established operational.

Read 1 source findings (2026-10-31)

Metro Edge IMD1 Illinois Medical District project; independent developer confirms one 4-floor project; not independently established operational. Evidence

research-final:IL:dcd1ff668a24c7324c84
Review notes available

Metro Edge IMD1

Chicago, IL · Metro Edge Development Partners

Reported status: approved/permitted

Reported capacity: 53 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-15

Review note: Same IMD1 site as CSV1604; developer's 53 MW is total planned utility service, not measured operating demand.

Read 1 source findings (2026-10-31)

Same IMD1 site as CSV1604; developer's 53 MW is total planned utility service, not measured operating demand. Evidence

research-final:IL:35f9f802173eaaaa545c
Review notes available

Netrality 717 South Wells

Chicago, IL · Netrality Data Centers

Reported status: operational

Exact location not published.

Original source · 2026-07-23

Review note: Current Netrality operator confirms physical data center and 717 S Wells St, Chicago. New identity candidate after exact baseline/tenant/address collision audit; no imported vendor point.

Read 1 source findings (2026-10-31)

Current Netrality operator confirms physical data center and 717 S Wells St, Chicago. New identity candidate after exact baseline/tenant/address collision audit; no imported vendor point. Evidence

research-final:IL:59e2a3553317b341e806
Review notes available

Northwestern University co-location facility

Chicago, IL · 710facility@ittns.northwestern.edu

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: A PeeringDB facility listing does not independently prove ownership, operations or physical building of the university co-location.

research-final:IL:51fe5c2ae582de51d41e
Review notes available

Prime Data Centers - Chicago ORD Campus

Chicago, IL · Prime Data Centers

Reported status: operational

Reported capacity: 175 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Chicago. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Supplier notes three planned hyperscale facilities; preserve campus vs ORD phases and reconcile site before claiming an operating facility.

research-final:IL:1a5d9a690629703af3d8
Review notes available

QTS Chicago (CHI1)

Chicago, IL · QTS Realty Trust, Inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: QTS official Chicago 1 campus is 2800 S Ashland. Distinguish existing original building from QTS proposed second building; PeeringDB networks do not establish operating MW.

Read 1 source findings (2026-10-31)

QTS official Chicago 1 campus is 2800 S Ashland. Distinguish existing original building from QTS proposed second building; PeeringDB networks do not establish operating MW. Evidence

research-final:IL:eb95786535b40d313604
Review notes available

QTS Chicago Data Center

Chicago, IL · QTS Data Centers

Reported status: operational

Reported capacity: 40 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: QTS Chicago at 2800 S Ashland is same campus as CSV1609; first-party describes two buildings at full build-out, second available for pre-lease, not two fully operating buildings.

Read 1 source findings (2026-10-31)

QTS Chicago at 2800 S Ashland is same campus as CSV1609; first-party describes two buildings at full build-out, second available for pre-lease, not two fully operating buildings. Evidence

research-final:IL:15063bd05711bf6e4566
Review notes available

Quality Technology Services Llc

Chicago, IL

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: EPA entity at 2800 S Ashland is an address match to QTS Chicago 1, not independent proof of operating status nor a third facility.

Read 1 source findings (2026-10-31)

EPA entity at 2800 S Ashland is an address match to QTS Chicago 1, not independent proof of operating status nor a third facility. Evidence

research-final:IL:6b6ec09ff7a100205445
Review notes available

Related Digital South Works Campus (8080 S DuSable Lake Shore Drive)

Chicago, IL · Related Digital

Reported status: proposed

Reported capacity: 1000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-25

Review note: North side of former South Works and adjacent quantum campus must not be conflated. Require current first-party parcel and project rights.

research-final:IL:79cedbabd5217d957c0e
Review notes available

SBA Edge, LLC

Chicago, IL · SBA Edge, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: SBA Edge identifier sourced to PeeringDB, insufficient to determine unique physical Chicago building/operator.

research-final:IL:c1d81d57ed688f574e37
Review notes available

Serverfarm CH1

Chicago, IL · Serverfarm

Reported status: operational

Reported capacity: 21.5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-15

Review note: Serverfarm currently lists Chicago CH1 as a real separate facility. Source states Northlake, not downtown Chicago; reconcile exact physical address/collision before admission. No design power treated as operating IT load.

Read 1 source findings (2026-10-31)

Serverfarm currently lists Chicago CH1 as a real separate facility. Source states Northlake, not downtown Chicago; reconcile exact physical address/collision before admission. No design power treated as operating IT load. Evidence

research-final:IL:5f81f41ac4bf48c69a58
Review notes available

tzulo Chicago

Chicago, IL · tzulo, inc.

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: PeeringDB lists 427 S LaSalle suite; requires primary building/operator proof to avoid counting suite as new site.

research-final:IL:059c6332f2eead2dcb3d
Review notes available

West Monroe

Chicago, IL

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-12

Review note: OSM-only point named West Monroe cannot establish data center identity, ownership or licensable public coordinates.

research-final:IL:aa846f7b4a3fe4534872
Review notes available

Meridian Technology Park

Clarksdale, IL · Eagle Rock Partners

Reported status: cancelled

Reported capacity: 1000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-25

Review note: Source city Clarksdale conflicts with its Taylorville/Christian County project description; proposed ten-building campus not operational or geocoded from source.

research-final:IL:68593349ca3630547c4e
Review notes available

Aligned Coal City Campus

Coal City, IL · Aligned Data Centers

Reported status: proposed

Exact location not published.

Original source · 2026-09-12

Review note: Coal City concept is geographically distinct from Aligned Elk Grove/Northlake; require first-party site entitlement and lifecycle before admission.

research-final:IL:98e1516d5bd8f579c8a8
Review notes available

Data Center

Darien, IL

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Generic OSM data center polygon in Darien gives no defensible operator/campus identity or transferable point.

research-final:IL:79f3b5cebe544d81f652
Research database | Compute Equity Atlas