Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableDigital Data Center
Glendale Heights, IL
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Glendale Heights generic Digital Data Center EPA at 188 Internationale Blvd lacks first-party physical facility/lifecycle validation.
research-final:IL:8885e47819b554512b2bReview notes availableT5 @ Chicago IV - Grayslake Campus
Grayslake, IL · T5@Chicago IV, LP; T5 Data Centers
Reported status: proposed
Reported capacity: 1.2 GW (scope and operation unverified)
Regulatory reference: FRS facility point (stated accuracy 5 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-07-17
Review note: Planned Grayslake CHI IV 18–20-building proposal is independent of Elk Grove CHI V and must not be counted as operational or copied to map.
research-final:IL:c5e420fbcb75d3d237c3Review notes availableSangha Systems Hennepin (82 River North)
Hennepin, IL · Sangha Systems
Reported status: operational
Reported capacity: 82 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-03
Review note: Former boiler-house Hennepin bitcoin mining project requires first-party operating facility, campus/taxonomy, current status and source-rights verification.
research-final:IL:0f28edced2ce298edab8Review notes availableCompass Datacenters - Hoffman Estates (Former Sears HQ)
Hoffman Estates, IL · Compass Datacenters
Reported status: under construction
Reported capacity: 500 MW (scope and operation unverified)
Approximate locality: address match (exact): 3333 BEVERLY RD, HOFFMAN ESTATES, IL, 60179. Census Geocoder; not a verified facility pin.
Original source · 2026-06-15
Review note: Compass confirms development at former Sears HQ, ~200 acres five hyperscale buildings. Two supplier rows represent same proposed campus, not two operational campuses; operator announcement says future development.
Read 1 source findings (2026-10-31)
Compass confirms development at former Sears HQ, ~200 acres five hyperscale buildings. Two supplier rows represent same proposed campus, not two operational campuses; operator announcement says future development. Evidence
research-final:IL:e56b081e189333591b9aReview notes availableCompass Datacenters Hoffman Estates Campus
Hoffman Estates, IL · Compass Datacenters
Reported status: under construction
Exact location not published.
Original source · 2026-09-21
Review note: Compass confirms development at former Sears HQ, ~200 acres five hyperscale buildings. Two supplier rows represent same proposed campus, not two operational campuses; operator announcement says future development.
Read 1 source findings (2026-10-31)
Compass confirms development at former Sears HQ, ~200 acres five hyperscale buildings. Two supplier rows represent same proposed campus, not two operational campuses; operator announcement says future development. Evidence
research-final:IL:7a0d2b0c37c37dfd44d1Review notes availableKaris Critical - Hoffman Estates Plum Farms Data Center
Hoffman Estates, IL · Karis Critical; H.E. Holdings LLC
Reported status: cancelled
Exact location not published.
Original source · 2026-07-17
Review note: Karis Plum Farms is not Compass former Sears headquarters: independently verify own physical parcel/phase and current status.
research-final:IL:d2909368fafbff4b3583Review notes availableMicrosoft Hoffman Estates Data Center
Hoffman Estates, IL · Microsoft
Reported status: operational
Exact location not published.
Original source · 2026-09-12
Review note: Microsoft Lakewood/Barrington proposal in Hoffman Estates should remain separate from Compass former Sears and Karis Plum Farms absent parcel-level source.
research-final:IL:56e26297feae751f274fReview notes availableNTT Chicago CH2 Data Center
Itasca, IL · NTT Global Data Centers
Reported status: operational
Reported capacity: 36 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-15
Review note: NTT CH2 officially 275 Pierce Road; Itasca municipality says second building opened 2023. Distinct from CH1 255 Pierce, with rated critical IT not measured consumption.
Read 2 source findings (2026-10-31)
NTT CH2 officially 275 Pierce Road; Itasca municipality says second building opened 2023. Distinct from CH1 255 Pierce, with rated critical IT not measured consumption. Evidence
NTT CH2 officially 275 Pierce Road; Itasca municipality says second building opened 2023. Distinct from CH1 255 Pierce, with rated critical IT not measured consumption. Evidence
research-final:IL:90f8efc2023d9480f05aReview notes availableNTT Chicago CH3 Data Center
Itasca, IL · NTT Global Data Centers
Reported status: under construction
Exact location not published.
Original source · 2026-10-15
Review note: Itasca municipal source says CH3 third building scheduled for completion 2026; no completed/operating claim until dated inspection or operator launch.
Read 1 source findings (2026-10-31)
Itasca municipal source says CH3 third building scheduled for completion 2026; no completed/operating claim until dated inspection or operator launch. Evidence
research-final:IL:dcd39c6e9c0a9f295c43Review notes availableNTT Chicago CH4 Data Center
Itasca, IL · NTT Global Data Centers
Reported status: approved/permitted
Exact location not published.
Original source · 2026-10-15
Review note: Municipality lists fourth ITASCA building as future in four-building plan; later fifth phase potential requires its own dated legal review; no double-count as CH3 or existing CH1/2.
Read 1 source findings (2026-10-31)
Municipality lists fourth ITASCA building as future in four-building plan; later fifth phase potential requires its own dated legal review; no double-count as CH3 or existing CH1/2. Evidence
research-final:IL:f785f55605c4e80b59a0Review notes availableNtt Data Center To Tss 101
Itasca, IL
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 330 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA NTT to TSS101 at 1262 Inverness relates to electric facility/tie, not separate IT data center, nor CH1/CH2 alias.
Read 1 source findings (2026-10-31)
EPA NTT to TSS101 at 1262 Inverness relates to electric facility/tie, not separate IT data center, nor CH1/CH2 alias. Evidence
research-final:IL:ac94c0847c8f2387a889Accepted facility identity linkedNTT Global Data Centers - Itasca CH1
Itasca, IL · NTT DATA
Reported status: operational
Reported capacity: 36 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Exact original root reviewed:ntt-itasca-il-20261029. NTT operator 255 Pierce Road, village reports operational 2019. CH2/CH3/CH4 are separate buildings and may share campus, not duplicate CH1.
Read 3 source findings (2026-10-31)
Exact original root reviewed:ntt-itasca-il-20261029. NTT operator 255 Pierce Road, village reports operational 2019. CH2/CH3/CH4 are separate buildings and may share campus, not duplicate CH1. Evidence
Exact original root reviewed:ntt-itasca-il-20261029. NTT operator 255 Pierce Road, village reports operational 2019. CH2/CH3/CH4 are separate buildings and may share campus, not duplicate CH1. Evidence
Current operator confirms operating CH1 on its Itasca campus. One campus identity uses CH1 as its physical anchor; CH2/CH3/CH4 archive rows do not create duplicate campuses. Itasca is distinct from the existing Northlake Chicago CH1 record. Evidence
Existing project record
research-final:IL:3b463b3db0f6a3ca43aaReview notes availablePowerHouse Data Centers
Jackson Twp/ Joliet, IL
Reported status: proposed
Reported capacity: 1800.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: PowerHouse/Hillwood Joliet Technology Center proposal covers same ~795-acre campus in Jackson Township near Joliet; authorization/annexation does not prove any of 24 proposed halls operational.
research-final:IL:cef2a026e9e709610081Review notes availableJoliet Technology Center
Joliet, IL · Hillwood; PowerHouse Data Centers; Joliet Technology Center LLC
Reported status: proposed
Reported capacity: 1.8 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: PowerHouse/Hillwood Joliet Technology Center proposal covers same ~795-acre campus in Jackson Township near Joliet; authorization/annexation does not prove any of 24 proposed halls operational.
research-final:IL:eef3c38968a0bc94d550Review notes availablePowerHouse Hillwood Holding
Joliet, IL · PowerHouse Hillwood Holding
Reported status: under construction
Reported capacity: 1800.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: PowerHouse/Hillwood Joliet Technology Center proposal covers same ~795-acre campus in Jackson Township near Joliet; authorization/annexation does not prove any of 24 proposed halls operational.
research-final:IL:7547c792625d9f26d531Review notes availableHut 8 - Logan Prairie Data Center
Latham, IL · Hut 8
Reported status: proposed
Reported capacity: 500 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Hut 8 explicitly states Logan Prairie in Latham is early development subject to local approvals and NO construction without permitting, power/utility studies. One 50-acre proposal, not 2 operating facilities.
Read 1 source findings (2026-10-31)
Hut 8 explicitly states Logan Prairie in Latham is early development subject to local approvals and NO construction without permitting, power/utility studies. One 50-acre proposal, not 2 operating facilities. Evidence
research-final:IL:c90f45f431a087355281Review notes availableHut8 Data Center
Latham/ Laenna Twp, IL · Hut 8
Reported status: proposed
Reported capacity: 500.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Hut 8 explicitly states Logan Prairie in Latham is early development subject to local approvals and NO construction without permitting, power/utility studies. One 50-acre proposal, not 2 operating facilities.
Read 1 source findings (2026-10-31)
Hut 8 explicitly states Logan Prairie in Latham is early development subject to local approvals and NO construction without permitting, power/utility studies. One 50-acre proposal, not 2 operating facilities. Evidence
research-final:IL:d634c0a73fcc08895877Accepted facility identity linkedCentersquare ORD4 (Lisle)
Lisle, IL · Centersquare (Csquare)
Reported status: operational
Exact location not published.
Original source · 2026-10-22
Review note: Csquare ORD4 Lisle same existing physical site at 4513 Western Ave; CSV1697 is accepted root, CSV1698 same historical address operator source candidate for exact source ID link, not another facility.
Read 2 source findings (2026-10-31)
Csquare ORD4 Lisle same existing physical site at 4513 Western Ave; CSV1697 is accepted root, CSV1698 same historical address operator source candidate for exact source ID link, not another facility. Evidence
Current operator market page and 2026 specification identify the operating Lisle facility at this exact address. Utility power figures are not relabeled as operating IT load. Evidence
Existing project record
research-final:IL:5510d5487509a71a362dReview notes availableCenterSquare ORD4 - 4513 Western Avenue
Lisle, IL · 4513 Western Avenue LLC; CenterSquare
Reported status: proposed
Reported capacity: 88.9 MW (scope and operation unverified)
Approximate locality: address match (exact): 4513 WESTERN AVE, LISLE, IL, 60532. Census Geocoder; not a verified facility pin.
Original source · 2026-07-17
Review note: Csquare ORD4 Lisle same existing physical site at 4513 Western Ave; CSV1697 is accepted root, CSV1698 same historical address operator source candidate for exact source ID link, not another facility.
Read 1 source findings (2026-10-31)
Csquare ORD4 Lisle same existing physical site at 4513 Western Ave; CSV1697 is accepted root, CSV1698 same historical address operator source candidate for exact source ID link, not another facility. Evidence
research-final:IL:8ef9c452162f09d914e2Review notes availableCloud Centers Data Center
Lisle, IL · CloudBurst
Reported status: proposed
Reported capacity: 50.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Cloud Centers planned 711 Ogden Ave redevelopment is one distinct Lisle proposal, unrelated to Csquare ORD4 4513 Western. News meeting postponement not construction.
research-final:IL:80403b77ba75d90c76ceReview notes availableCloudCenters Lisle Data Center (711 Ogden Ave, former Lockformer site)
Lisle, IL · Cloud Centers, LLC
Reported status: cancelled
Reported capacity: 50 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-15
Review note: Cloud Centers planned 711 Ogden Ave redevelopment is one distinct Lisle proposal, unrelated to Csquare ORD4 4513 Western. News meeting postponement not construction.
research-final:IL:9ec052aa56adaa24e1e0Review notes availableCyrusOne Sangamon County Data Center Campus
Loami, IL · CyrusOne
Reported status: approved/permitted
Reported capacity: 630 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-25
Review note: CyrusOne Loami/Sangamon county proposal requires primary site entitlement/phase; do not infer power or construction from vendor.
research-final:IL:947513dbf7412797fc1fReview notes availableStar Innovation District Data Center (Lockport)
Lockport, IL · VME Developers
Reported status: cancelled
Exact location not published.
Original source · 2026-09-25
Review note: Lockport former refinery brownfield innovation district source requires proponent/City current zoning/building permit before status and exact geometry.
research-final:IL:737fb484e795f02bb89eAccepted facility identity linked360 Tcs Llc
Lombard, IL
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Existing original source root reviewed:360tcs-lombard-il-20261029, EPA regulated entity at 360 E 22nd. Keep measured power unknown; do not treat NAICS/permit as operation.
Read 1 source findings (2026-10-31)
Current operator confirms active Lombard colocation; its contact page supplies the exact street address. Network operator independently identifies this same address as the 360TCS carrier-neutral data center, distinct from CyrusOne Lombard at Springer Drive. Evidence
Existing project record
research-final:IL:187b53113823943228f2Review notes availableCyrusOne Chicago (Lombard)
Lombard, IL · CyrusOne Inc.
Reported status: operational
Reported capacity: 18.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: PeeringDB CyrusOne Lombard may refer to 360 E 22nd multi-tenant building; cannot infer distinct building or connect source IDs without first-party address and legal operating identity.
research-final:IL:2fea966a3667619795afReview notes availableQuad State Internet METRO1 Colocation
Metropolis, IL · Quad State Internet LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: PeeringDB METRO1 Colocation provider record does not establish independently supported physical building; no map promotion.
research-final:IL:37f22cb1500f1a3f0774Accepted facility identity linkedEquinix CH8 Minooka
Minooka, IL · Equinix
Reported status: proposed
Exact location not published.
Original source · 2026-10-22
Review note: CSV1706 roots accepted Equinix Minooka CH8 project with unknown lifecycle; 1707 EPA legal record at Ridge Rd may relate to same project, but operation and exact geometry cannot follow from EPA alone.
Read 1 source findings (2026-10-31)
Current Village transparency portal explicitly reports Equinix campus construction at the northeast corner of Ridge and Holt roads. Street intersection and historic farm parcel are insufficient for an exact campus map anchor. CH8 label is not used as evidence of operating status. Evidence
Existing project record
research-final:IL:8514c69667adc8003e17Review notes availableEquinix Llc
Minooka, IL
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 5 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: CSV1706 roots accepted Equinix Minooka CH8 project with unknown lifecycle; 1707 EPA legal record at Ridge Rd may relate to same project, but operation and exact geometry cannot follow from EPA alone.
research-final:IL:fe52ee875531acfd67daReview notes availableMorris Technology Park
Morris, IL · Tract
Reported status: approved/permitted
Reported capacity: 1000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-15
Review note: Tract first-party confirms one 343-acre Morris Technology Park acquired and zoned January 2026, planned up to 1GW full buildout, **first energization targeted 2028**. Three original source rows not three sites. 1GW is plan, not current load.
Read 1 source findings (2026-10-31)
Tract first-party confirms one 343-acre Morris Technology Park acquired and zoned January 2026, planned up to 1GW full buildout, **first energization targeted 2028**. Three original source rows not three sites. 1GW is plan, not current load. Evidence
research-final:IL:f3bed3a8946c57c60df1Review notes availableMorris Technology Park
Morris, IL
Reported status: proposed
Exact location not published.
Original source · 2026-01-27
Review note: Tract first-party confirms one 343-acre Morris Technology Park acquired and zoned January 2026, planned up to 1GW full buildout, **first energization targeted 2028**. Three original source rows not three sites. 1GW is plan, not current load.
Read 1 source findings (2026-10-31)
Tract first-party confirms one 343-acre Morris Technology Park acquired and zoned January 2026, planned up to 1GW full buildout, **first energization targeted 2028**. Three original source rows not three sites. 1GW is plan, not current load. Evidence
research-final:IL:7d2277c807792be23eca