Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableLogistix Data Center
Frankfort, IN
Reported status: rejected/denied
Reported capacity: 300.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Logistix/Logix Realty 300MW Frankfort proposal: initial city petition rescinded July 2025 with developer promise to reapply, then county commissioners rejected January 20, 2026 on 715 acres; no permission to classify 300MW operating. Two IDs one proposed site, not two.
research-final:IN:c99c8e0ec3723a5d616aReview notes availableLogix Reality Frankfort Data Center
Frankfort, IN · Logix Reality LLC
Reported status: cancelled
Exact location not published.
Original source · 2026-09-01
Review note: Logistix/Logix Realty 300MW Frankfort proposal: initial city petition rescinded July 2025 with developer promise to reapply, then county commissioners rejected January 20, 2026 on 715 acres; no permission to classify 300MW operating. Two IDs one proposed site, not two.
research-final:IN:58d08f829f850b65a846Review notes availableGoogle Franklin Township Data Center (Withdrawn)
Franklin Township, IN · Google
Reported status: cancelled
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Franklin. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-18
Review note: Four original names are one 468-acre Google-affiliate Deep Meadow Ventures Project Flo proposal along I-74/Post Road in Franklin Township, **Indianapolis**, not Beech Grove. Filed formal withdrawal of rezoning in September/October 2025, no constructed center. Do not conflate with Google's Fort Wayne campus or count buildings.
research-final:IN:fce02b0a10434fedd478Accepted facility identity linkedLifeline Ft Wayne
Ft Wayne, IN · Lifeline Data Centers
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: First-party Lifeline lists Fort Wayne at 7601 S Anthony Blvd as physical facility. Original CSV1803 accepted canonical reviewed:lifeline-fort-wayne-in-20261029, no extra site.
Read 2 source findings (2026-10-31)
First-party Lifeline lists Fort Wayne at 7601 S Anthony Blvd as physical facility. Original CSV1803 accepted canonical reviewed:lifeline-fort-wayne-in-20261029, no extra site. Evidence
Current operator locations page identifies the operating Fort Wayne facility at this exact address. Evidence
Existing project record
research-final:IN:4b2416be40a9ca21cb5eReview notes availableTakanock Goshen Data Center
Goshen, IN · Takanock
Reported status: proposed
Reported capacity: 1500 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-14
Review note: Takanock Goshen acts as developer/entitler, not known compute facility operator; planned speculative campus cannot be operational or counted per phase.
research-final:IN:a622625874eb84768d00Review notes availableGranger Data Center Expansion
Granger, IN · Microsoft Corporation
Reported status: proposed
Exact location not published.
Original source · 2026-06-23
Review note: Microsoft EKI/Granger/Mishawaka former St Joe Farm (~939ac) references one proposed multi-building campus; CSV1806 source URL explicitly dated **2026-11-25**, a future date relative to **2026-10-30**, so source is **chronologically impossible to verify as a published current permit**. Quarantine future-dated permit assertion, keep 2026 site acquisition evidence with unknown operation/status, preserve original row/hash.
research-final:IN:ed26110a2154dfd5ebb1Review notes availableMicrosoft EKI Campus - proposed data center (IDEM new-source construction and FESOP application F 141-50527-00655)
Granger, IN · Microsoft
Reported status: proposed
Exact location not published.
Original source · 2026-10-26
Review note: Microsoft EKI/Granger/Mishawaka former St Joe Farm (~939ac) references one proposed multi-building campus; CSV1806 source URL explicitly dated **2026-11-25**, a future date relative to **2026-10-30**, so source is **chronologically impossible to verify as a published current permit**. Quarantine future-dated permit assertion, keep 2026 site acquisition evidence with unknown operation/status, preserve original row/hash.
research-final:IN:461edd5305e03da3ec12Review notes availableMicrosoft Granger Data Center
Granger, IN · Microsoft
Reported status: under construction
Reported capacity: 1000 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: Microsoft EKI/Granger/Mishawaka former St Joe Farm (~939ac) references one proposed multi-building campus; CSV1806 source URL explicitly dated **2026-11-25**, a future date relative to **2026-10-30**, so source is **chronologically impossible to verify as a published current permit**. Quarantine future-dated permit assertion, keep 2026 site acquisition evidence with unknown operation/status, preserve original row/hash.
research-final:IN:b57274c0ab9da9d640d6Review notes availableMicrosoft Mishawaka/Granger Data Center
Granger, IN · Microsoft
Reported status: under construction
Reported capacity: 110 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Granger. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Microsoft EKI/Granger/Mishawaka former St Joe Farm (~939ac) references one proposed multi-building campus; CSV1806 source URL explicitly dated **2026-11-25**, a future date relative to **2026-10-30**, so source is **chronologically impossible to verify as a published current permit**. Quarantine future-dated permit assertion, keep 2026 site acquisition evidence with unknown operation/status, preserve original row/hash.
research-final:IN:0b3b81b02771e47e9818Review notes availableHancock County MegaSite (Withdrawn)
Greenfield, IN · Surge Development LLC
Reported status: cancelled
Reported capacity: 143 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Greenfield. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Surge Hancock County 775-acre Buck Creek Township MegaSite withdrew its rezoning petition amid opposition in May 2025; CSV1790 Cumberland nearest-Census versus CSV1809 Greenfield same developer/site. No operation; permit resubmission remains separate future question.
research-final:IN:dc8c9f4483ea61ec7aaaReview notes availableJumping Bison Greensburg Data Center
Greensburg, IN · Jumping Bison LLC
Reported status: proposed
Exact location not published.
Original source · 2026-09-01
Review note: Jumping Bison Greensburg proposed 2-phase site/550-acre zone should not be treated as two operating data center facilities; developer permits required.
research-final:IN:5de868e8c8b5c9a04edcAccepted facility identity linkedDigital Crossroad
Hammond, IN · Digital Crossroad
Reported status: operational
Reported capacity: 180.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Digital Crossroad Hammond DX1 existing canonical root reviewed:digital-crossroad-dx1-in-20261029, built 105k sqft Phase 1 and 2024 **proposed** 180k sqft second phase, distinct expansion not verified operational. EPA central plant / JV at 701 Casino Center vs 100 Digital Crossroads needs physical site tie, not two independent facilities. Vendor states 180MW expansion but 2024 report says proposed 20MW second phase; do not transfer either to measured consumption.
Read 1 source findings (2026-10-31)
Current operator confirms active DX-1 colocation in Hammond. Campus phases and future power are not additional facilities or measured operating load. Operator ZIP 46302 differs from the network provider listing 46320; exact operator-address Census query returns no match, so no pin is admitted. Evidence
Existing project record
research-final:IN:1f1afe885e12ea369d35Review notes availableDigital Crossroads Hammond Expansion
Hammond, IN · Decennial Group; Digital Crossroads; CoreWeave
Reported status: cancelled
Reported capacity: 180 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Digital Crossroad Hammond DX1 existing canonical root reviewed:digital-crossroad-dx1-in-20261029, built 105k sqft Phase 1 and 2024 **proposed** 180k sqft second phase, distinct expansion not verified operational. EPA central plant / JV at 701 Casino Center vs 100 Digital Crossroads needs physical site tie, not two independent facilities. Vendor states 180MW expansion but 2024 report says proposed 20MW second phase; do not transfer either to measured consumption.
research-final:IN:78eee8fd9767e6e3e5e3Review notes availableDigital Crossroads Of America Data Center & Central Plant
Hammond, IN
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Digital Crossroad Hammond DX1 existing canonical root reviewed:digital-crossroad-dx1-in-20261029, built 105k sqft Phase 1 and 2024 **proposed** 180k sqft second phase, distinct expansion not verified operational. EPA central plant / JV at 701 Casino Center vs 100 Digital Crossroads needs physical site tie, not two independent facilities. Vendor states 180MW expansion but 2024 report says proposed 20MW second phase; do not transfer either to measured consumption.
research-final:IN:4844e848f97c049da5afReview notes availableDx Hammond Jv Llc
Hammond, IN
Reported status: approved/permitted (EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: Digital Crossroad Hammond DX1 existing canonical root reviewed:digital-crossroad-dx1-in-20261029, built 105k sqft Phase 1 and 2024 **proposed** 180k sqft second phase, distinct expansion not verified operational. EPA central plant / JV at 701 Casino Center vs 100 Digital Crossroads needs physical site tie, not two independent facilities. Vendor states 180MW expansion but 2024 report says proposed 20MW second phase; do not transfer either to measured consumption.
research-final:IN:f7b03cc1cc8680a05d10Review notes availableGoogle Fort Wayne data center
Hessen Cassel, IN · Google
Reported status: operational
Exact location not published.
Original source · 2026-10-09
Review note: Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count.
Read 1 source findings (2026-10-31)
Google official Indiana page confirms Fort Wayne site groundbreaking in 2024, **not proves it operating as of 2026**. Four source names reference the same Project Zodiac campus near East Tillman and Adams Center. CSV1791 Danville and CSV1815 Hessen Cassel are wrong nearest-place locality tags, not extra campuses. Avoid building-phase double count. Evidence
research-final:IN:313777946992a179fd8eReview notes availableAmazon Web Services (AWS) Hobart Tech Park
Hobart, IN · Amazon Web Services
Reported status: proposed
Reported capacity: 2.4 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: AWS Amazon Hobart Tech Park/Campus/rezoning/201 mass grading permit are phases and legal records for one proposed campus. Rezoning/earthworks is not proof of an operating hall, MW, or independent facilities. City site parcel must distinguish PowerHouse Hobart.
research-final:IN:f9d691add23bbcb25072Review notes availableAmazon Web Services Hobart data center campus
Hobart, IN
Reported status: proposed
Exact location not published.
Original source · 2026-08-25
Review note: AWS Amazon Hobart Tech Park/Campus/rezoning/201 mass grading permit are phases and legal records for one proposed campus. Rezoning/earthworks is not proof of an operating hall, MW, or independent facilities. City site parcel must distinguish PowerHouse Hobart.
research-final:IN:6105933f17ced057b128Review notes availableHobart Data Center
Hobart, IN · Amazon.com, Inc.
Reported status: under construction
Reported capacity: 2400.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: AWS Amazon Hobart Tech Park/Campus/rezoning/201 mass grading permit are phases and legal records for one proposed campus. Rezoning/earthworks is not proof of an operating hall, MW, or independent facilities. City site parcel must distinguish PowerHouse Hobart.
research-final:IN:c0967c9cba6d094aeeb6Review notes availableHobart Data Center Mass Grading - 1
Hobart, IN
Reported status: under construction (EPA site-work record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: AWS Amazon Hobart Tech Park/Campus/rezoning/201 mass grading permit are phases and legal records for one proposed campus. Rezoning/earthworks is not proof of an operating hall, MW, or independent facilities. City site parcel must distinguish PowerHouse Hobart.
research-final:IN:ed93ad7feb2b105689f6Review notes availablePowerHouse Hobart
Hobart, IN · PowerHouse Data Centers
Reported status: proposed
Reported capacity: 450 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-13
Review note: PowerHouse Hobart 170-acre up to six-building project is a separate developer from Amazon Hobart, may differ parcels. Do not merge on locality alone or claim 1.89m sqft constructed.
research-final:IN:30888c26ceef7f01b550Review notes availableAmerican Tower Pike Township Data Center
Indianapolis, IN · American Tower Corporation
Reported status: cancelled
Exact location not published.
Original source · 2026-09-13
Review note: American Tower Pike Township 7701 Walnut Dr ~7ac edge site: company withdrew zoning petition Feb 2, 2026 **while considering reapplication**, so two IDs refer to one paused proposal, not operating, not necessarily permanently cancelled.
research-final:IN:47db9fd7325d87e163e5Review notes availableAmerican Tower/ ATC Watertown LLC/ Edge Data Center
Indianapolis, IN
Reported status: rejected/denied
Reported capacity: 4.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: American Tower Pike Township 7701 Walnut Dr ~7ac edge site: company withdrew zoning petition Feb 2, 2026 **while considering reapplication**, so two IDs refer to one paused proposal, not operating, not necessarily permanently cancelled.
research-final:IN:268012cd0346e04c6c5bReview notes availableCitynet Indianapolis
Indianapolis, IN · Citynet
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Citynet Indianapolis PeeringDB network facility not independently supported physical building; avoid duplicated colocated tenant.
research-final:IN:f6432dc46f8211c8c14aAccepted facility identity linkedDataBank Indianapolis (IND1)
Indianapolis, IN · DataBank, Ltd.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: DataBank current official IND1 street **731 W Henry**, Indianapolis, 2.1MW **rated critical IT capacity**; existing root reviewed:databank-ind1-in-20261029. Separate physical building from IND2 **650 W Henry**.
Read 2 source findings (2026-10-31)
DataBank current official IND1 street **731 W Henry**, Indianapolis, 2.1MW **rated critical IT capacity**; existing root reviewed:databank-ind1-in-20261029. Separate physical building from IND2 **650 W Henry**. Evidence
Current operator verifies operating carrier-hotel colocation at 731 West Henry Street. The explicit 731 address is distinct from canonical Netrality 701 and 733 West Henry records and from IND2 at 650 West Henry. Evidence
Existing project record
research-final:IN:423e34c84d9a13d862bdAccepted facility identity linkedDataBank Indianapolis (IND2)
Indianapolis, IN · DataBank, Ltd.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: DataBank official IND2 650 W Henry, 3.75MW rated critical IT, distinct building from IND1 731 W Henry and source is accepted root reviewed:databank-ind2-in-20261029.
Read 2 source findings (2026-10-31)
DataBank official IND2 650 W Henry, 3.75MW rated critical IT, distinct building from IND1 731 W Henry and source is accepted root reviewed:databank-ind2-in-20261029. Evidence
Operator identifies current IND2 colocation and interconnection at 650 West Henry Street. IND1 at 731 West Henry is held for physical-building overlap review against existing Netrality 733 West Henry; it is not added in this batch. Evidence
Existing project record
research-final:IN:0f71f0c3b2a029ba9040Review notes availableDC BLOX Thunderbird Commerce Center Data Center
Indianapolis, IN · DC BLOX
Reported status: proposed
Reported capacity: 78 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: DC BLOX Thunderbird Commerce Center Indianapolis planned project requires first-party operator and Indianapolis municipal approval, not assumed operating.
research-final:IN:9c0aafe9ac600d187ca2Review notes availableGoogle Franklin Township data center
Indianapolis, IN · Google (Deep Meadow Ventures)
Reported status: cancelled
Exact location not published.
Original source · 2026-09-23
Review note: Four original names are one 468-acre Google-affiliate Deep Meadow Ventures Project Flo proposal along I-74/Post Road in Franklin Township, **Indianapolis**, not Beech Grove. Filed formal withdrawal of rezoning in September/October 2025, no constructed center. Do not conflate with Google's Fort Wayne campus or count buildings.
research-final:IN:0c2ffa7cf49c262ea499Review notes availableGoogle Franklin Township Data Center (rezoning withdrawn)
Indianapolis, IN · Google
Reported status: cancelled
Exact location not published.
Original source · 2026-10-16
Review note: Four original names are one 468-acre Google-affiliate Deep Meadow Ventures Project Flo proposal along I-74/Post Road in Franklin Township, **Indianapolis**, not Beech Grove. Filed formal withdrawal of rezoning in September/October 2025, no constructed center. Do not conflate with Google's Fort Wayne campus or count buildings.
research-final:IN:683c7a24df90ca24cdbbReview notes availableHealth And Hospital Corporation
Indianapolis, IN
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA Health and Hospital Corporation 3838 N Rural St with NAICS category not proof dedicated physical data center hall.
research-final:IN:61d9656961cab2b2fa03