6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Accepted facility identity linked

IUPUI Informatics & Communications Technology Complex

Indianapolis, IN · Indiana University

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Indiana University IUPUI ICTC original PeeringDB facility roots canonical reviewed:iu-indianapolis-in-20261029 at 535 W Michigan. Preserve physical academic building without new campus. Need owner validation of operation for further fields.

Read 1 source findings (2026-10-31)

Current university data-center operations page identifies its Indianapolis data center in the Informatics and Communications Technology Complex at this address. Evidence

Existing project record

research-final:IN:5ca6f23230e961e50f8e
Accepted facility identity linked

Lifeline Data Centers - Eastgate

Indianapolis, IN · Lifeline Data Centers

Reported status: operational

Reported capacity: 9 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Review note: Lifeline Eastgate firstparty at 401 N Shadeland Ave former mall hosts existing operating data center / emergency ops center. Exact original root accepted canonical reviewed:lifeline-eastgate-in-20261029, no second location.

Read 3 source findings (2026-10-31)

Lifeline Eastgate firstparty at 401 N Shadeland Ave former mall hosts existing operating data center / emergency ops center. Exact original root accepted canonical reviewed:lifeline-eastgate-in-20261029, no second location. Evidence

Lifeline Eastgate firstparty at 401 N Shadeland Ave former mall hosts existing operating data center / emergency ops center. Exact original root accepted canonical reviewed:lifeline-eastgate-in-20261029, no second location. Evidence

Current operator identifies its operating Eastgate data center. The whole physical campus is represented once. Evidence

Existing project record

research-final:IN:be0c774db03fc32139af
Review notes available

Lifeline Data Centers - Henry

Indianapolis, IN · Lifeline Data Centers

Reported status: operational

Approximate locality: address match (exact): 733 W HENRY ST, INDIANAPOLIS, IN, 46225. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Review note: Lifeline Henry address 733 W Henry Indianapolis is numerically close to DataBank IND1 731 W Henry, may be same multitenant carrier building or legacy tenant. Don't count extra building until firstparty 733 property/site distinctness verified.

research-final:IN:83ecfa628de4ccd50e7b
Review notes available

Lilly Ltc-N K323 Modular Data Center Addition

Indianapolis, IN

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: EPA Eli Lilly LTC-N K323 modular computer room addition at 1555 S Harding likely tenant/industrial campus module, not standalone public facility; independent physical and privacy/right checks required.

research-final:IN:8c3a65ec4f9a2591a50e
Review notes available

Metrobloks Martindale-Brightwood Data Center

Indianapolis, IN · Metrobloks

Reported status: proposed

Reported capacity: 72 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Metrobloks Martindale-Brightwood Indianapolis proposal is still a development concept; no first-party completed building/campus status independently verified.

research-final:IN:5754180195394104f902
Review notes available

Netrality - Indy Telcom Center - 701 W. Henry

Indianapolis, IN · Netrality Data Centers

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Netrality Indy Telcom Center at 701 W Henry is a different street number from existing DataBank IND1 731 and IND2 650; verify physical operator, building and overlapping network/service tenancy before making a new standalone center.

research-final:IN:810352a5468e11d467d6
Review notes available

Sabey Decatur Township Data Center

Indianapolis, IN · Sabey

Reported status: proposed

Reported capacity: 250 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Sabey first-party confirms one **130-acre** proposed Decatur Township campus **6400 Kentucky Ave**, Indianapolis, 2 buildings totaling ~1m sqft, expected construction Q2 2027 and phased occupancy Q4 2029–2035. Earlier original CSV1792 same project; CSV1892 mislabeled Plainfield nearest-Census, not separate data center.

Read 1 source findings (2026-10-31)

Sabey first-party confirms one **130-acre** proposed Decatur Township campus **6400 Kentucky Ave**, Indianapolis, 2 buildings totaling ~1m sqft, expected construction Q2 2027 and phased occupancy Q4 2029–2035. Earlier original CSV1792 same project; CSV1892 mislabeled Plainfield nearest-Census, not separate data center. Evidence

research-final:IN:cb11eb9b05df2e1ad191
Review notes available

US Signal Data Center

Indianapolis, IN

Reported status: operational

Exact location not published.

Original source · 2026-06-18

Review note: US Signal acquisition of an Indianapolis facility is a distinct city/site from its Aurora IL02; verify first-party acquisition address, predecessor ownership and collision against 701 W Henry Netrality and DataBank two separate Henry sites before accepted update.

research-final:IN:feac8b7407ddb6ed8a7a
Review notes available

Meta Data Center

Jeffersonville, IN · Meta Platforms, Inc.

Reported status: under construction

Reported capacity: 407.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Meta Jeffersonville River Ridge campus sources refer to same development (also CSV1782), distinct from Meta **Lebanon**. Meta lists Jeffersonville for 2026 Community Action Grants, which confirms local presence, **not** commissioning or number of operating halls.

research-final:IN:8b6b7969fbac1180543f
Review notes available

Meta Jeffersonville Data Center

Jeffersonville, IN · Meta; Turner Construction

Reported status: under construction

Reported capacity: 225 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Meta Jeffersonville River Ridge campus sources refer to same development (also CSV1782), distinct from Meta **Lebanon**. Meta lists Jeffersonville for 2026 Community Action Grants, which confirms local presence, **not** commissioning or number of operating halls.

research-final:IN:f27b8557f5372211314c
Review notes available

Henry County Technology Park

Knightstown, IN · Surge Development LLC

Reported status: approved/permitted

Exact location not published.

Original source · 2026-10-16

Review note: Surge/GM Development Henry County Technology Park near I70/SR109 at Knightstown is one proposed campus under two names, distinct from withdrawn Hancock Buck Creek project and future operator unverified.

research-final:IN:7b3ef99969773c0900f1
Review notes available

Surge Development Knightstown Data Center

Knightstown, IN · Surge Development; GM Development

Reported status: proposed

Reported capacity: 1.0 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Knightstown. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-17

Review note: Surge/GM Development Henry County Technology Park near I70/SR109 at Knightstown is one proposed campus under two names, distinct from withdrawn Hancock Buck Creek project and future operator unverified.

research-final:IN:fa55aa27bd20b891cba3
Review notes available

Digital Realty Kokomo Data Center Campus (Industrial Park North)

Kokomo, IN · Digital Realty

Reported status: proposed

Reported capacity: 1500 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-16

Review note: Digital Realty Industrial Park North Kokomo ~3m sqft proposed 3 buildings on future land; neither built campus nor operating status verified by developer first-party; no 3 map pins.

research-final:IN:e5a9412cfbc07a0f3283
Review notes available

La Porte One / Project Cardinal Thomas Rose Industrial Park Data Center

La Porte, IN · La Porte One LLC

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for La Porte. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: La Porte One Project Cardinal Thomas Rose Industrial Park proposal requires separate parcel/owner check, not Microsoft La Porte Radius Industrial Park, not any identically named Yorkville Project Cardinal.

research-final:IN:65dc6c432160d8281df3
Review notes available

Microsoft La Porte Data Center

La Porte, IN · Microsoft

Reported status: under construction

Reported capacity: 538 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm.

Read 2 source findings (2026-10-31)

Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm. Evidence

Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm. Evidence

research-final:IN:f178f00cdca8830d3571
Review notes available

Microsoft La Porte First Phase Current Build

La Porte, IN · Microsoft Corporation

Reported status: under construction

Exact location not published.

Original source · 2026-06-18

Review note: Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm.

Read 2 source findings (2026-10-31)

Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm. Evidence

Microsoft confirms June 18 2026 La Porte groundbreaking and July 2026 grading/site prep for **future** datacenter, 489-acre Radius Industrial Park and eventual 17-building conceptual expansion. Microsoft says vertical construction future; 2029 likely completion, NOT current operations. Two source rows one campus distinct from Microsoft Mishawaka/St Joe Farm. Evidence

research-final:IN:b72e20e77e9a1ea615fd
Accepted facility identity linked

Wintek Corporation

Lafayette, IN · Wintek Corporation

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Wintek Corporation original PeeringDB network source is the accepted root reviewed:wintek-lafayette-in-20261029, but supplier-only facility type and current operation require direct operator corroboration for further changes.

Read 1 source findings (2026-10-31)

Operator identifies its Lafayette data center and describes active client hosting and colocation; current services continue to offer colocation. Street address remains unresolved from primary sources. The Sixth Street contact address is an office, not substituted as data-center geometry. Evidence

Existing project record

research-final:IN:0f3a36b05fa4ebaf34b6
Review notes available

Meta Lebanon (Project Domino)

Lebanon, IN · Meta

Reported status: under construction

Reported capacity: 1000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Meta 2026 Feb company release confirms under construction and breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville.

Read 1 source findings (2026-10-31)

Meta 2026 Feb company release confirms under construction and breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville. Evidence

research-final:IN:6214127c58cd6215854e
Review notes available

Meta Lebanon Data Center

Lebanon, IN · Meta

Reported status: under construction

Reported capacity: 1000 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-23

Review note: Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville.

Read 1 source findings (2026-10-31)

Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville. Evidence

research-final:IN:c4f8b1f50cf62f2703bb
Review notes available

Meta Lebanon LEAP District Campus

Lebanon, IN · Meta

Reported status: under construction

Reported capacity: 1.0 GW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Lebanon. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville.

Read 1 source findings (2026-10-31)

Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville. Evidence

research-final:IN:f04b886335f5c14cc8d9
Review notes available

Orla Llc

Lebanon, IN

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

Review note: EPA Orla LLC 3062 W SR32 Lebanon regulated data record has possible campus/corporate links but not independent proof of Meta Lebanon legal entity, physical building or operation; preserve separate until matching.

research-final:IN:df6b7568c03fef5676d6
Review notes available

Prologis

Leesburg, IN

Reported status: cancelled

Exact location not published.

Original source · 2026-06-18

Review note: Prologis Kosciusko County Leesburg proposed 550-acre rezoning was **denied by planning commission April 2025**, pending any subsequent final commissioner/new petition; no operating hall or MW.

research-final:IN:d0b92b0b35966462c703
Review notes available

Project Zora

Lynnville, IN · Undisclosed

Reported status: proposed

Exact location not published.

Original source · 2026-10-16

Review note: Undisclosed Project Zora in Warrick County Lynnville has no publicly confirmed operator/end user, final permits or physical data hall; hold.

research-final:IN:cbc3fa0681a9eff14c8b
Review notes available

Jefferson Proving Ground Data Center

Madison, IN · Undisclosed

Reported status: approved/permitted

Exact location not published.

Original source · 2026-09-21

Review note: JPG Jefferson Proving Ground Jefferson County project and JPG Data Center name refer to one potential nine-building campus; zoning appeal dispute not proof of final commissioning/operation. Keep correct county vs nearest Madison.

research-final:IN:cc3afc83b8311ddb2bf3
Review notes available

JPG Data Center

Madison, IN · JPG Data Center

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Madison. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: JPG Jefferson Proving Ground Jefferson County project and JPG Data Center name refer to one potential nine-building campus; zoning appeal dispute not proof of final commissioning/operation. Keep correct county vs nearest Madison.

research-final:IN:0fb358691ca71066796e
Review notes available

Marion, Indiana Bitcoin Mining Site (Bitari hosting)

Marion, IN · Undisclosed (facility owner hosting Bitari Inc.)

Reported status: operational

Reported capacity: 20 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-16

Review note: Marion hosting for Bitari crypto ASIC mine has neither independently verified address nor actual facility operator; distinguish mining from general enterprise/hyperscale data center capacity.

research-final:IN:25bf2daae229b27e36cc
Review notes available

Project Riverjump

Marion, IN · Undisclosed

Reported status: cancelled

Exact location not published.

Original source · 2026-10-16

Review note: Project Riverjump west Marion unnamed developer and no current permit; cannot merge with Bitari miner or call a physical operating hall.

research-final:IN:7a5e50b973921064219b
Review notes available

Surge Development LLC

McCordsville, IN

Reported status: cancelled

Exact location not published.

Original source · 2026-06-18

Review note: Surge McCordsville Tuttle Orchards proposal should be checked against withdrawn Surge Buck Creek/Hancock MegaSite CSV1790/1809 by exact parcel. Similar owner/county alone not grounds for second campus or final withdrawal.

research-final:IN:55fec08a066efd9256b2
Review notes available

AboutBit Merom Cryptocurrency Mining Facility

Merom, IN · AboutBit

Reported status: proposed

Reported capacity: 115 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-02

Review note: AboutBit Merom coal-plant-adjacent ASIC mining has separate compute/mining taxonomy; proposed 115MW is not measured actual use, not the Fluidstack Sullivan Heartland site by name.

research-final:IN:707e5116be821562f10f
Review notes available

Heartland Industrial Park (Fluidstack Sullivan County Campus)

Merom, IN · Fluidstack

Reported status: under construction

Reported capacity: 2100 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-16

Review note: Fluidstack/Potentia Heartland Industrial Park Sullivan campus potential AI facility is distinct proposal from AboutBit coal-adjacent crypto miner; need current first-party operator/parcel/phase.

research-final:IN:4f85bf8b42a6755a9252