Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableRadius Data Center
Plainfield, IN
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: RadiusDC 31-acre Plainfield site has planned Indy I and **future Indy II** ~100k sqft buildings. CSV1891 accepted original canonical campus root reviewed:radiusdc-indy-campus-in-20261029, CSV1890 same proposal not new campus; approval of primary plat not operations.
research-final:IN:7a111fc711a5bc52618cAccepted facility identity linkedRadiusDC Plainfield Campus (Indy I / Indy II)
Plainfield, IN · RadiusDC
Reported status: proposed
Reported capacity: 24 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-13
Review note: RadiusDC 31-acre Plainfield site has planned Indy I and **future Indy II** ~100k sqft buildings. CSV1891 accepted original canonical campus root reviewed:radiusdc-indy-campus-in-20261029, CSV1890 same proposal not new campus; approval of primary plat not operations.
Read 1 source findings (2026-10-31)
Current developer identifies the two-building Indy I/Indy II development at AllPoints Parkway. Town records confirm primary plat and development-plan approval. Planned status is retained: generic In-Service specification headings do not prove commissioned capacity. Exact address Census query has no match; no town centroid is substituted. Evidence
Existing project record
research-final:IN:c8935494512870f6266eReview notes availableSabey Indianapolis Decatur Township Data Center Campus — proposed campus
Plainfield, IN · Sabey Data Centers
Reported status: proposed
Reported capacity: 250.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-08-27
Review note: Sabey first-party confirms one **130-acre** proposed Decatur Township campus **6400 Kentucky Ave**, Indianapolis, 2 buildings totaling ~1m sqft, expected construction Q2 2027 and phased occupancy Q4 2029–2035. Earlier original CSV1792 same project; CSV1892 mislabeled Plainfield nearest-Census, not separate data center.
Read 1 source findings (2026-10-31)
Sabey first-party confirms one **130-acre** proposed Decatur Township campus **6400 Kentucky Ave**, Indianapolis, 2 buildings totaling ~1m sqft, expected construction Q2 2027 and phased occupancy Q4 2029–2035. Earlier original CSV1792 same project; CSV1892 mislabeled Plainfield nearest-Census, not separate data center. Evidence
research-final:IN:b9348f8985a2172d39d9Review notes availableAWS Portage Data Center (AmeriPlex at the Port)
Portage, IN · Amazon Web Services
Reported status: operational
Exact location not published.
Original source · 2026-09-14
Review note: Amazon AWS Portage AmeriPlex proposed campus is not Hobart or AWS New Carlisle (and differs parcels/city); needs local building inspection/phase proof for operations.
research-final:IN:74168c6e34592d02eba9Review notes availableData Center
Portage, IN
Reported status: existing (EPA facility record; status unverified)
Exact location not published.
Original source · 2026-10-28
Review note: Generic EPA Data Center 6350 Prairie School Dr Portage cannot establish Amazon Portage tenant/operator, data hall status or geometry without primary proof.
research-final:IN:ced79b56570e780b5bd2Review notes availableGibson County Data Center
Princeton, IN · Undisclosed
Reported status: proposed
Reported capacity: 600 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-09-13
Review note: Undisclosed Gibson County Princeton 600MW proposal mentioned only in secondary trackers, no owner/current county permit; do not manufacture a canonical facility.
research-final:IN:fcf1dd81120335e28f93Review notes availablePrologis Shelbyville Data Center (Project Hackman)
Shelbyville, IN · Prologis
Reported status: proposed
Reported capacity: 500 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Prologis Shelbyville Project Hackman proposal is geographically different from denied Leesburg and distinct from Joliet Prologis, no operation or parcel-precise public point.
research-final:IN:c365f1b7b49d66c894c3Accepted facility identity linkedAunalytics South Bend Datacenter (AUSB)
South Bend, IN · Aunalytics
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Aunalytics AUSB South Bend original PeeringDB ID is accepted canonical root reviewed:aunalytics-ausb-in-20261029 at 1440 Ignition Drive, keep unknown operating MW and independent proof for future field updates.
Read 1 source findings (2026-10-31)
May 2026 city record ties Aunalytics to 1440 Ignition Drive. The 2024 signed development agreement identifies server and AI infrastructure investment at this property, distinct from Stull Street offices. Current operator confirms owned Midwest data-center operations but does not establish completion of this site expansion; site-wide lifecycle remains unknown. Census returns no exact address match. Evidence
Existing project record
research-final:IN:a17fe90134dc1a866a1bReview notes availableGAP Union Station
South Bend, IN · Global Access Point
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: Global Access Point Union Station South Bend network/carrier facility may be shared building with Aunalytics or others; require operator physical address before another building admission.
research-final:IN:9e31ec8883cda0b245b9Review notes availableMeta Lebanon Indiana Current Development
Ulen, IN
Reported status: under construction
Exact location not published.
Original source · 2026-07-06
Review note: Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville.
Read 1 source findings (2026-10-31)
Meta 2026 Feb company release breaks ground for one **Lebanon LEAP** large campus and design 1GW **when operational**; CSV1899 Ulen nearest-Census locality actually Lebanon. Do not add four campuses or count proposed GW as energized operating MW. Distinct from Jeffersonville. Evidence
research-final:IN:0ae8b56b884dae9a0646Review notes availableQTS Boone County Campus
Ulen, IN · QTS Realty Trust, LLC
Reported status: existing (mapped; status unverified)
Reported capacity: 240.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-14
Review note: QTS Boone County campus vendor Ulen nearest place should not be merged with Meta Lebanon LEAP campus despite same county; need unique first-party legal parcel and status.
research-final:IN:1793604fb88cffd7cdc5Review notes availableAgincourt Valparaiso Data Center Campus
Valparaiso, IN · Agincourt Investments, LLC
Reported status: cancelled
Exact location not published.
Original source · 2026-09-13
Review note: Valparaiso mayor confirms Agincourt withdrew 2025 potential four-building proposal and released land option; no formal plans filed, no operating campus.
research-final:IN:74401612ff272e3480d5Review notes availableDC BLOX Warren Township Data Center
Warren Township, IN · DC BLOX
Reported status: approved/permitted
Reported capacity: 78 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: DC BLOX Warren Township three-building plan separate parcel from Thunderbird Commerce Center CSV1826 until primary DC BLOX proves same; no operating halls yet.
research-final:IN:dbf816f3704c7932a517Review notes availableOutrigger Industrial Washington Data Center
Washington, IN · Outrigger Industrial
Reported status: cancelled
Exact location not published.
Original source · 2026-08-05
Review note: Outrigger Washington Daviess County build-to-suit near I69/US50 is land option not active DC operations; no known committed operator.
research-final:IN:e0f2866fd198d71ca95aReview notes availableAgricultural and Biological Engineering
West Lafayette, IN
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: OSM Agricultural and Biological Engineering Purdue department node is an academic building/label, not independent validated data center identity, vendor map invalid.
research-final:IN:bff0485a1099e203893aReview notes availableLearning GIS!
West Lafayette, IN
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: OSM point named 'Learning GIS!' is clearly a generic mapping/tutorial annotation, not a physical data center; reject map-facility classification without modifying source row.
research-final:IN:7ff3a2ccbb0d55def653Review notes availableAmazon Data Center
Wheatfield, IN · Amazon.com, Inc.
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: AWS Wheatfield Project Rise/Jasper County is one **304-acre proposed nine-building** campus near NIPSCO Schahfer power plant, three source rows not three sites, proposed not measured energy draw or commissioning. Distinct from Amazon Hobart, Portage, New Carlisle.
research-final:IN:6d4e67db4258d5849112Review notes availableAmazon Web Services (AWS) Wheatfield/Jasper County Campus
Wheatfield, IN · Amazon Web Services; NIPSCO
Reported status: proposed
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Wheatfield. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: AWS Wheatfield Project Rise/Jasper County is one **304-acre proposed nine-building** campus near NIPSCO Schahfer power plant, three source rows not three sites, proposed not measured energy draw or commissioning. Distinct from Amazon Hobart, Portage, New Carlisle.
research-final:IN:be3fd03594afcc0e460cReview notes availableAWS Wheatfield Campus (Project Rise)
Wheatfield, IN · Amazon Web Services
Reported status: approved/permitted
Exact location not published.
Original source · 2026-10-22
Review note: AWS Wheatfield Project Rise/Jasper County is one **304-acre proposed nine-building** campus near NIPSCO Schahfer power plant, three source rows not three sites, proposed not measured energy draw or commissioning. Distinct from Amazon Hobart, Portage, New Carlisle.
research-final:IN:cb27b181ed1fa4bc1471Review notes availableQTS Project Jeremiah (Jeremiah A and B), Wheeler
Wheeler, IN · QTS Data Centers
Reported status: cancelled
Exact location not published.
Original source · 2026-10-16
Review note: QTS Project Jeremiah A 351.85 acres and B 434.46 acres are **two separately described planned parcels** under one Wheeler master project; neither active facility and no collapsing as one already-built building.
research-final:IN:abe1ac94a8bfdb1da011Review notes availableWolcott Data Center
Wolcott, IN · Blue Ladder Development
Reported status: approved/permitted
Exact location not published.
Original source · 2026-09-01
Review note: Blue Ladder Wolcott US24/N1100W site proposed in Mid-America Commerce zone with no confirmed independent operating data center or owned coordinates.
research-final:IN:051b426c109fc07f5fccReview notes availableBeloit-NOC
Beloit, KS · North Central Kansas Community Network Co.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: PeeringDB status ok and North Central Kansas network homepage do not independently prove an operating colocation facility; supplier lists zero networks.
research-final:KS:ec2466b300d31e77f1d2Review notes availableMonarch Energy Colwich/Andale Site
Colwich, KS · Monarch Energy
Reported status: proposed
Exact location not published.
Original source · 2026-10-21
Review note: Monarch land-purchase discussion does not prove zoning, construction, tenancy or current facility; separate NextEra west Sedgwick parcels.
research-final:KS:1dc063a8d65a872d1845Review notes availableDe Soto Data Center Campus (Project Pilot)
De Soto, KS · Mount Sunflower Properties, LLC; Beale Infrastructure; Blue Owl
Reported status: under construction
Reported capacity: 443 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: De Soto municipal source confirms Beale/Mount Sunflower Flint Commerce Center Project Pilot future phased sitework; four future buildings are not four live facilities.
Read 1 source findings (2026-10-31)
De Soto municipal source confirms Beale/Mount Sunflower Flint Commerce Center Project Pilot future phased sitework; four future buildings are not four live facilities. Evidence
research-final:KS:4e58e33b258f508232e3Review notes availableDigital Realty Astra North Phase One (Project Jayhawk) — proposed two-storey 450,000 sq ft data center with private and Evergy substations
De Soto, KS · Digital Realty
Reported status: approved/permitted
Exact location not published.
Original source · 2026-10-21
Review note: Astra North/Project Jayhawk municipal proposal for Digital Realty is a separate operator/site from Beale Project Pilot; no completed building.
Read 1 source findings (2026-10-31)
Astra North/Project Jayhawk municipal proposal for Digital Realty is a separate operator/site from Beale Project Pilot; no completed building. Evidence
research-final:KS:0755ca9214a1081bd390Review notes availableDigital Realty De Soto Data Center Development
De Soto, KS · Digital Realty
Reported status: proposed
Reported capacity: 600 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for De Soto. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Digital Realty De Soto development aliases Astra North/Project Jayhawk; do not multiply campuses by description.
Read 1 source findings (2026-10-31)
Digital Realty De Soto development aliases Astra North/Project Jayhawk; do not multiply campuses by description. Evidence
research-final:KS:008bf96500ade5304087Review notes availableMount Sunflower Properties LLC Data Center
DeSoto, KS
Reported status: proposed
Exact location not published.
Original source · 2026-06-18
Review note: Mount Sunflower Douglas County K-10 property may be distinct from Johnson County De Soto Project Pilot, verify plats; cannot merge or multiply yet.
research-final:KS:a3d79dfeb803d9332758Review notes availableEdgerton Data Center
Edgerton, KS
Reported status: rejected/denied
Exact location not published.
Original source · 2026-06-17
Review note: Edgerton reported denial has uncertain parcel overlap with proposed DAMAC Heartland and unrelated EPA record; not proof of operations.
research-final:KS:61d8671f5bb5adb05ce2Review notes availableEDGERTON PROJECT
Edgerton, KS
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: EDGERTON PROJECT EPA ECHO regulatory permit is not operational status and no automatic identity link to denied parcel.
research-final:KS:2d1451a60270c4a62d65Review notes availableHeartland Data Center Project
Edgerton, KS · DAMAC Digital
Reported status: proposed
Reported capacity: 151.5 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-19
Review note: DAMAC Heartland Edgerton proposed campus lacks independently verified construction or exact relationship to denied Edgerton filing.
research-final:KS:34b84636d669c3f83594