Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableFlint Hills Digital Campus
Emporia, KS · Kanza Park Place LLC
Reported status: proposed
Reported capacity: 1.0 GW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Kanza Park Place Flint Hills Emporia vendor report cannot itself verify project permitting/operations or exact parcel.
research-final:KS:db3f7c6b679d790a061bReview notes availableBeale Infrastructure Gardner Campus
Gardner, KS · Beale Infrastructure
Reported status: cancelled
Exact location not published.
Original source · 2026-10-22
Review note: Beale Gardner Project Brewer cancelled, and distinct from Project Pilot De Soto.
research-final:KS:134f955c6cc8f92c3f50Review notes availableProject Brewer Gardner Data Center Campus
Gardner, KS · Beale Infrastructure
Reported status: cancelled
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Gardner. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-06-15
Review note: Project Brewer Gardner second supplier title is same cancelled property as original 1921, not another campus.
research-final:KS:e6a303fd52b6bc4fce31Review notes availableWest Sedgwick County data center land acquisitions
Goddard, KS · Monarch Energy; NextEra Energy (separate land deals)
Reported status: proposed
Exact location not published.
Original source · 2026-09-23
Review note: Monarch and NextEra west Sedgwick land purchases are separate real estate deals, not one data center building or campus.
research-final:KS:14d5177ad59e39941d1eReview notes availableCloud Storage Corp
Hays, KS
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: OpenStreetMap Cloud Storage Corp building name is not independently verified as a colocation facility or licensed coordinate.
research-final:KS:68fc51b5d3a819e14a00Review notes availableVine Energy Iola Data Center
Iola, KS · Vine Energy LLC
Reported status: under construction
Reported capacity: 3 MW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for Iola. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-18
Review note: Vine Energy Iola vendor construction status requires current first-party or local approval plus parcel before promotion.
research-final:KS:767d1780930a9f845c64Review notes availableAstra Enterprise Park
Kansas City, KS · Digital Realty Trust, Inc.
Reported status: proposed
Exact location not published.
Original source · 2026-06-30
Review note: Astra Enterprise Park SEC filing entity does not establish a separate building from Digital Realty De Soto Jayhawk.
research-final:KS:bc54253beaf51f1786dcReview notes availableKansas City, KS (SEC-disclosed)
Kansas City, KS · Digital Realty Trust, Inc.
Reported status: proposed
Exact location not published.
Original source · 2026-06-23
Review note: Generic Digital Realty KC-KS SEC filing is legal/portfolio metadata, not a second operating facility.
research-final:KS:925128e528d6f527dbe3Review notes availableKCK Data Center
Kansas City, KS
Reported status: proposed
Exact location not published.
Original source · 2026-06-17
Review note: KCK unspecified news-referenced data center needs original council filing and actual physical project identity.
research-final:KS:280c1d20729af6f327f6Review notes availableProject Yardbird
Kansas City, KS · PowerTransitions
Reported status: proposed
Reported capacity: 200 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-21
Review note: Project Yardbird conversion of former power-plant site remains proposed; electricity capacity is not compute operations.
research-final:KS:4e7de82e11de998c2fb8Review notes availableRed Wolf DCD Properties Data Center Campus
Kansas City, KS · Red Wolf DCD Properties LLC
Reported status: proposed
Reported capacity: 600 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Red Wolf DCD proposed six data halls comprise one planned campus; no commissioned hall demonstrated.
research-final:KS:ebf1a3a1dfa409a970f1Review notes availableData Center Lenexa
Lenexa, KS · Prime Data Centers
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Prime Lenexa OSM label not a verified facility; compare operator exact addresses against distinct DataBank and TierPoint.
research-final:KS:d66ef0fa5d6d0a4e5f99Review notes availableDatabank Ltd Mci 3 (Air)
Lenexa, KS
Reported status: approved/permitted (EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: EPA legal entity MCI3 11200 Lakeview matches first-party MCI3, not new building and not operational proof alone.
Read 1 source findings (2026-10-31)
EPA legal entity MCI3 11200 Lakeview matches first-party MCI3, not new building and not operational proof alone. Evidence
research-final:KS:c9ebdc30d1b31e137cc5Review notes availableDataBank MCI3 South Lake Campus Data Center
Lenexa, KS · DataBank
Reported status: operational
Reported capacity: 12.75 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-10-21
Review note: DataBank directly confirms MCI3 11200 Lakeview Lenexa and distinguishes Pine Ridge MCI2 10605 W 84th Terrace.
Read 1 source findings (2026-10-31)
DataBank directly confirms MCI3 11200 Lakeview Lenexa and distinguishes Pine Ridge MCI2 10605 W 84th Terrace. Evidence
research-final:KS:bd0ba94d5c02a27c75a6Accepted facility identity linkedLightEdge Lenexa Data Center
Lenexa, KS · LightEdge
Reported status: operational
Exact location not published.
Original source · 2026-10-21
Review note: Accepted LightEdge Lenexa cavern original CSV1934 current operator 17501 West 98th; no duplicate or surveyed cavern geometry.
Read 2 source findings (2026-10-31)
Accepted LightEdge Lenexa cavern original CSV1934 current operator 17501 West 98th; no duplicate or surveyed cavern geometry. Evidence
Operator identifies current underground colocation suites at this street address. The Census point represents the surface street-address range; it is not surveyed entrance or underground-cavern geometry. Evidence
Existing project record
research-final:KS:919f9d10c16465e7b441Review notes availableTierPoint Kansas City - Lenexa
Lenexa, KS · TierPoint
Reported status: operational
Exact location not published.
Original source · 2026-10-21
Review note: TierPoint operator separately verifies 14500 West 105th Lenexa, not LightEdge cavern or MCI3.
Read 1 source findings (2026-10-31)
TierPoint operator separately verifies 14500 West 105th Lenexa, not LightEdge cavern or MCI3. Evidence
research-final:KS:74ddf9328084e41d1ff1Review notes availableCrypto Colo Center McLouth Data Center (proposed) — cancelled
McLouth, KS · Crypto Colo Center Corp
Reported status: cancelled
Exact location not published.
Original source · 2026-08-05
Review note: Crypto Colo Center McLouth cancelled proposal; no constructed live computing facility established.
research-final:KS:c9a189f79e399b13f45aReview notes availableSC
Medicine Lodge, KS · SC
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-12
Review note: OSM feature SC Medicine Lodge has no verified operator, compute function or transferable geolocation.
research-final:KS:e33e801d0b2457bdd35aReview notes availablePrairie Horizon Data Campus
near St. Marys, KS · Beltline Energy
Reported status: proposed
Reported capacity: 1.2 GW (scope and operation unverified)
Approximate locality: approximate: Census 2024 Gazetteer place centroid for St. Marys. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-17
Review note: Prairie Horizon St Marys Beltline project is vendor-proposed only; no current municipal land proof.
research-final:KS:f5aeaac937d14a9d253bReview notes availableQTS New Century Commerce Center (Building B1)
New Century, KS · QTS Data Centers
Reported status: proposed
Exact location not published.
Original source · 2026-10-21
Review note: Warehouse Building B1 lease/adaptation is not proof of QTS built/energized data center or measured IT load.
research-final:KS:64a37da9f220cd0b6ea4Review notes availableClop Olathe - 10Mw Data Center (Air)
Olathe, KS
Reported status: existing (mapped + EPA air-permit record)
Exact location not published.
Original source · 2026-10-28
Review note: EPA CLOP Olathe 10MW air permit at 23800 W Valley does not establish commissioned IT demand or operating status.
research-final:KS:7429680daa62dbf7f848Review notes availableState Farm Data Center
Olathe, KS · Prime Data Centers
Reported status: existing (mapped + EPA air-permit record)
Exact location not published.
Original source · 2026-06-14
Review note: OSM State Farm Olathe and Prime attribution conflict; verify physical/current operator before admission.
research-final:KS:615e985c9bcfe8cc0891Review notes availableU.S. Bank National Data Process Center
Olathe, KS
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: US Bank National Data Process Center OSM feature requires first-party physical operating site proof before promotion.
research-final:KS:ccb0a1a56d2be71fa5e9Review notes availableAlcove Osawatomie Northland Data Center
Osawatomie, KS · Alcove Development
Reported status: proposed
Reported capacity: 500 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Alcove Osawatomie Northland and Project Catalyst likely refer to same proposed campus.
research-final:KS:808f1ba994ede91a8a22Review notes availableProject Catalyst (Osawatomie)
Osawatomie, KS · Alcove Development
Reported status: proposed
Reported capacity: 500 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-21
Review note: Project Catalyst Osawatomie is same proposed Alcove Northland campus, not second operation.
research-final:KS:090bd7b4e6eb899cf7c2Review notes availableLightfield Energy Proximity Park Technology Campus
Ottawa, KS · Lightfield Energy LLC
Reported status: proposed
Reported capacity: 440 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Lightfield Ottawa Proximity Park proposed separate from Alcove Osawatomie, no construction/parcel proof.
research-final:KS:402083ed82abd63d2b37Review notes availableDataBank Kansas City (MCI2)
Overland Park, KS · DataBank, Ltd.
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: PeeringDB DataBank Kansas City MCI2 is existing operator MCI2 10605 W 84th; registry status alone not relied upon.
Read 1 source findings (2026-10-31)
PeeringDB DataBank Kansas City MCI2 is existing operator MCI2 10605 W 84th; registry status alone not relied upon. Evidence
research-final:KS:1b389bac22968316dfbfReview notes availableDataBank MCI2 Pine Ridge Data Center
Overland Park, KS · DataBank
Reported status: operational
Reported capacity: 2 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-13
Review note: DataBank first-party verifies MCI2 Pine Ridge 10605 W 84th Overland Park, distinct MCI3 South Lake.
Read 1 source findings (2026-10-31)
DataBank first-party verifies MCI2 Pine Ridge 10605 W 84th Overland Park, distinct MCI3 South Lake. Evidence
research-final:KS:60bd1ef07524e1273640Review notes availableQTS Overland Park Data Center (OVP1)
Overland Park, KS · QTS Data Centers
Reported status: operational
Exact location not published.
Original source · 2026-09-13
Review note: Former QTS Overland Park OVP1 site redirects portfolio; no inferred closure or active operations.
research-final:KS:1b8e2917e4002c9b88c2Review notes availableWANSEC DC16
Overland Park, KS · WANSecurity, Inc.
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: WANSEC DC16 PDB listing with no supplier-reported networks does not prove a physical operating facility.
research-final:KS:0ab44a5c4d440f31930a