Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

ColoSpace - Waltham, MA

Waltham, MA · FirstLight Fiber, Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: ColoSpace Waltham vendor label needs current FirstLight/other operator status and exact shared building check.

research-final:MA:fcf6ff42141754b18d33
Review notes available

Csquare Waltham BOS1 Data Center

Waltham, MA · Csquare

Reported status: operational

Reported capacity: 38.2 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Csquare current Boston locations lists Waltham BOS1, separate site from Watertown BOS4; marketed combined utility power is not operating load.

Read 1 source findings (2026-10-31)

Csquare current Boston locations lists Waltham BOS1, separate site from Watertown BOS4; marketed combined utility power is not operating load. Evidence

research-final:MA:4267fe8945c8ec11ff65
Review notes available

Equinix BO1

Waltham, MA · Equinix

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Review note: Legacy Equinix BO1 Waltham listing requires current operator facility confirmation; BO2 Billerica is distinct and verified.

research-final:MA:8244965238c9a110ce69
Review notes available

Csquare Watertown BOS4 Data Center

Watertown, MA · Csquare

Reported status: operational

Reported capacity: 19.1 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Review note: Csquare first-party differentiates Watertown BOS4 from Waltham BOS1 despite same Boston metro marketing.

Read 1 source findings (2026-10-31)

Csquare first-party differentiates Watertown BOS4 from Waltham BOS1 despite same Boston metro marketing. Evidence

research-final:MA:6641532086bbb8d066a7
Review notes available

Amazon Data Services Westborough

Westborough, MA · Amazon Data Services

Reported status: proposed

Source reference: address match (exact): 600 FRIBERG PKWY, WESTBOROUGH, MA, 01581. Census Geocoder; not a verified facility pin.

Original source · 2026-10-24

Review note: Supplier AWS Westborough proposal not evidence of operational facility; need applicant/parcel primary proof.

research-final:MA:0e429d34431b9621bff8
Review notes available

State Street Westborough Data Center

Westborough, MA

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: State Street Westborough EPA record not proof of AWS overlap nor live DC operations.

research-final:MA:72cbf7516314468bdaf7
Review notes available

Westborough Data Center

Westborough, MA

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Generic Westborough EPA facility entry cannot establish separate center or current operations.

research-final:MA:b27d65f2c8bfc3f6e22b
Review notes available

Amazon AWS Worcester County Properties

Westborough, Grafton, MA · Amazon Data Services Inc.

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Westborough. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: Regional AWS Worcester County properties aggregates proposed Grafton/Westborough leads; no additional third campus.

research-final:MA:b5faa54130a7f6996de9
Review notes available

Westfield Data Center Campus (Servistar Realties)

Westfield, MA · Servistar Realties

Reported status: proposed

Reported capacity: 274 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Westfield Servistar project is a proposal, no independently confirmed operating facility or parcel geometry.

research-final:MA:b43557c5cd386698f807
Review notes available

Crown Castle Worcester (474 Main Street)

Worcester, MA · Crown Castle

Reported status: operational

Exact location not published.

Original source · 2026-09-15

Review note: Crown Castle Worcester 474 Main requires first-party data-center physical service and whether network presence is in shared building.

research-final:MA:f8f1601081513512be59
Review notes available

Aligned Data Centers - Critical Digital Infrastructure Facility

Adamstown, MD · Aligned Data Centers

Reported status: under construction

Reported capacity: 264 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Adamstown. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: IAD-04 is one Aligned building in the Quantum Frederick data park; general Aligned development label and IAD04 do not add two facilities.

Read 1 source findings (2026-10-31)

IAD-04 is one Aligned building in the Quantum Frederick data park; general Aligned development label and IAD04 do not add two facilities. Evidence

research-final:MD:f36d76f483bcb8b53a41
Review notes available

Aligned Data Centers IAD-04 Frederick

Adamstown, MD · Aligned Data Centers

Reported status: under construction

Reported capacity: 72 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: IAD-04 is one Aligned building in the Quantum Frederick data park; general Aligned development label and IAD04 do not add two facilities.

Read 1 source findings (2026-10-31)

IAD-04 is one Aligned building in the Quantum Frederick data park; general Aligned development label and IAD04 do not add two facilities. Evidence

research-final:MD:46044159532c9f72b358
Review notes available

Quantum Frederick Campus

Adamstown, MD · TPG Real Estate; Catellus Development Corporation

Reported status: under construction

Reported capacity: 2.4 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Quantum Frederick is a park containing multiple separately operated/phased facilities, not a third Aligned/Rowan building.

Read 2 source findings (2026-10-31)

Quantum Frederick is a park containing multiple separately operated/phased facilities, not a third Aligned/Rowan building. Evidence

Quantum Frederick is a park containing multiple separately operated/phased facilities, not a third Aligned/Rowan building. Evidence

research-final:MD:773bc59a1422d93209d2
Review notes available

Rowan Digital Infrastructure - Bauxite I

Adamstown, MD · Rowan Digital Infrastructure

Reported status: operational

Reported capacity: 231 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Rowan's own Bauxite I is a distinct project phase within its Maryland campus, substantially complete in 2025; not proof that customer IT power is commissioned.

Read 1 source findings (2026-10-31)

Rowan's own Bauxite I is a distinct project phase within its Maryland campus, substantially complete in 2025; not proof that customer IT power is commissioned. Evidence

research-final:MD:0a219a19c79d71f4b5f8
Review notes available

Rowan Digital Infrastructure - Bauxite II

Adamstown, MD · Rowan Digital Infrastructure; Amazon Data Services, Inc.

Reported status: under construction

Reported capacity: 230 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-19

Review note: Rowan's Bauxite II is separately phased, delivery targeted 2026, not a duplicate of Bauxite I or necessarily a separate campus.

Read 1 source findings (2026-10-31)

Rowan's Bauxite II is separately phased, delivery targeted 2026, not a duplicate of Bauxite I or necessarily a separate campus. Evidence

research-final:MD:bfb71df89cce5878fb07
Review notes available

Rowan Digital Infrastructure - Bauxite III

Adamstown, MD · Rowan Digital Infrastructure

Reported status: proposed

Reported capacity: 165 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Rowan's Bauxite III separately phased, delivery targeted 2027; preserve separate building/phase vs single campus count.

Read 1 source findings (2026-10-31)

Rowan's Bauxite III separately phased, delivery targeted 2027; preserve separate building/phase vs single campus count. Evidence

research-final:MD:b4e9247873e41b3f16a9
Review notes available

Annapolis Data Center

Annapolis, MD

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Annapolis EPA facility record does not prove current data center operator, operating lifecycle or separate building.

research-final:MD:79bdfc40eb4ab294f093
Review notes available

Ibm Annapolis Data Center

Annapolis, MD

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 150 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: IBM Annapolis EPA permit alone does not confirm active data center, independent building or company tenancy.

research-final:MD:afe1cbcd7f12ff547413
Review notes available

Microsoft Annapolis Junction Data Center Campus

Annapolis Junction, MD · Microsoft

Reported status: under construction

Exact location not published.

Original source · 2026-10-22

Review note: Microsoft Annapolis Junction campus is supplied as construction; first-party commissioning and phase/building identity not established.

research-final:MD:908ebd8a1848f872b0a9
Review notes available

Microsoft Corporation - Yellow Facility

Annapolis Junction, MD

Reported status: approved/permitted (EPA air-permit record)

Exact location not published.

Original source · 2026-10-28

Review note: Microsoft Yellow Facility EPA entity might be part of Annapolis Junction campus but cannot be counted as an extra operating data center.

research-final:MD:fba6521795c781c34d4e
Review notes available

Unnamed source-mapped location

Ballenger Creek, MD

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Unnamed DOI source point lacks independent building/operator identity.

research-final:MD:c994f53e6717435fee36
Accepted facility identity linked

AiNET One Market Center (Baltimore Carrier Hotel)

Baltimore, MD · AiNET

Reported status: operational

Reported capacity: 80 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-13

Review note: AiNET One Market carrier hotel source needs current provider address and multi-tenant crosswalk; Zayo 111 Market Place may be presence in same building.

Read 1 source findings (2026-10-31)

Current operator identifies One Market Center carrier hotel at 300 West Lexington Street, serving colocation clients and network providers. DataBank BWI1 tenant reference at the same building is not an extra physical facility. Evidence

Existing project record

research-final:MD:5c3ecae154ba07f5cff9
Review notes available

Crown Castle Baltimore

Baltimore, MD · Crown Castle Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Crown Castle ODbL tagged network facility not independent operating data center proof.

research-final:MD:4b1a2c7f9abb7541e3d1
Review notes available

DataBank BWI1 (Downtown Baltimore Data Center)

Baltimore, MD · DataBank

Reported status: operational

Reported capacity: 1.5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-13

Review note: DataBank supplier BWI1 Downtown Baltimore must not be mistaken for Expedient BWI1 Owings Mills, different operator/sites; require DataBank first-party building.

research-final:MD:25c4002add8c45530e6a
Review notes available

Expedient Baltimore - Tide Point

Baltimore, MD · Expedient

Reported status: operational

Reported capacity: 2 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-07-22

Review note: Expedient Baltimore Tide Point label needs exact physical confirmation distinct from its currently marketed Owings Mills BWI1 at Red Run Boulevard.

Read 1 source findings (2026-10-31)

Expedient Baltimore Tide Point label needs exact physical confirmation distinct from its currently marketed Owings Mills BWI1 at Red Run Boulevard. Evidence

research-final:MD:d0cc007f53161226235b
Review notes available

Johns Hopkins Bayview Research Computing Data Center

Baltimore, MD · Johns Hopkins University

Reported status: proposed

Exact location not published.

Original source · 2026-10-22

Review note: Hopkins Bayview research-computing proposal, ODbL Johns Hopkins existing site and general data science proposal may be different buildings or project versions; no triple-count.

research-final:MD:a496c924493665f5cb64
Accepted facility identity linked

Johns Hopkins Data Center

Baltimore, MD

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Hopkins Bayview research-computing proposal, ODbL Johns Hopkins existing site and general data science proposal may be different buildings or project versions; no triple-count.

Read 1 source findings (2026-10-31)

University identifies the existing MARCC research computing and server-colocation facility on its Bayview campus, now administered by ARCH, and supplies its physical address separately from its Homewood offices. This admits the existing facility, not a second record for the 2026 proposed expansion. Census geometry is independently queried; IM3 and OSM points are not promoted. Evidence

Existing project record

research-final:MD:3c74a79c76df6c06095e
Review notes available

Johns Hopkins University - Data Science and Computing Infrastructure Data Center

Baltimore, MD · Johns Hopkins University

Reported status: proposed

Approximate locality: address match (exact): 5400 E LOMBARD ST, BALTIMORE, MD, 21224. Census Geocoder; not a verified facility pin.

Original source · 2026-06-15

Review note: Hopkins Bayview research-computing proposal, ODbL Johns Hopkins existing site and general data science proposal may be different buildings or project versions; no triple-count.

research-final:MD:f804d062dd9bb685f0d8
Review notes available

Lumen Baltimore 1

Baltimore, MD · Lumen Technologies

Reported status: operational

Exact location not published.

Original source · 2026-07-23

Review note: Lumen Baltimore supplier label requires current separate physical data center evidence.

research-final:MD:f0f1e273cabd3e0f2404
Review notes available

MAG Partners - Baltimore Peninsula Data Center

Baltimore, MD · MAG Partners

Reported status: cancelled

Reported capacity: 50 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Vendor marks MAG Baltimore Peninsula proposal cancelled; require first-party withdrawal and versions before terminal lifecycle disposition.

research-final:MD:f2ddbbacbd796c2b2863
Research database | Compute Equity Atlas