Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

123NET DC4 Grand Rapids Data Center

Byron Center, MI · 123NET

Reported status: operational

Exact location not published.

Original source · 2026-09-21

Review note: 123NET DC4 and US Signal MI02 are separate provider claims at one 400 76th Street physical building; avoid two physical-building map markers.

research-final:MI:0c23852082abf24c9be2
Review notes available

ManagedWay BYK1

Byron Center, MI · ManagedWay Company

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: ManagedWay BYK1 is operational in supplied research for Byron Center; supplier status, ManagedWay Company, coordinates and power are not independently accepted.

research-final:MI:73d7e6855097e1198d2f
Review notes available

US Signal MI02 Grand Rapids Data Center

Byron Center, MI · US Signal

Reported status: operational

Reported capacity: 0.25 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: 123NET DC4 and US Signal MI02 are separate provider claims at one 400 76th Street physical building; avoid two physical-building map markers.

research-final:MI:26f6800dad047720abfa
Review notes available

Amway Southbelt Data Center

Caledonia, MI

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Amway Southbelt Data Center is existing (mapped; status unverified) in supplied research for Caledonia; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:0b82077bc18bf964e199
Review notes available

Microsoft Caledonia Data Center

Caledonia, MI · Microsoft Corporation

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Microsoft Caledonia/Gaines/Grand Rapids planning leads overlap by metro but need parcel and sponsor reconciliation; no project count collapse merely by county.

research-final:MI:f5974b0c38442ef15e36
Review notes available

Microsoft Gaines Township data center

Caledonia, MI · Microsoft

Reported status: proposed

Exact location not published.

Original source · 2026-10-13

Review note: Microsoft Caledonia/Gaines/Grand Rapids planning leads overlap by metro but need parcel and sponsor reconciliation; no project count collapse merely by county.

research-final:MI:9478fc281248d4621092
Review notes available

Midwest Energy & Communications

Cassopolics, MI · Midwest Energy & Communications

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Midwest Energy & Communications is operational in supplied research for Cassopolics; supplier status, Midwest Energy & Communications, coordinates and power are not independently accepted.

research-final:MI:c52e9a2cdabf88d05a38
Review notes available

Project Peninsula

Cedar Springs, MI

Reported status: proposed

Exact location not published.

Original source · 2026-09-23

Review note: Project Peninsula is proposed in supplied research for Cedar Springs; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:bc68771237008a6b6b69
Review notes available

The Barn Stargate Current Data Center Build

Clinton, MI

Reported status: under construction

Exact location not published.

Original source · 2026-09-28

Review note: OpenAI/Oracle/Related Stargate Saline 'Barn' construction claims should map to one real campus with phases separated and no IT MW inferred from project scale; conflicting Clinton locality must remain a hold.

research-final:MI:1bf421f57afa97ded3f2
Review notes available

Dafter Township Bitcoin Mine

Dafter, MI · Odessa Partners

Reported status: operational

Exact location not published.

Original source · 2026-09-09

Review note: Dafter Township Bitcoin Mine is operational in supplied research for Dafter; supplier status, Odessa Partners, coordinates and power are not independently accepted.

research-final:MI:88dae97b787e22698df7
Review notes available

Cogent Detroit Data Center (1320 3rd St)

Detroit, MI · Cogent Communications

Reported status: operational

Exact location not published.

Original source · 2026-10-07

Review note: Cogent Detroit and Troy are distinct locations requiring 2026 ownership transfer recheck; never merge them as one site.

research-final:MI:aa1a50af4a4ed02098b3
Review notes available

Quicken Loans

Detroit, MI · Quicken Loans

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Quicken Loans is existing (mapped; status unverified) in supplied research for Detroit; supplier status, Quicken Loans, coordinates and power are not independently accepted.

research-final:MI:080cb96448133ffdc8f2
Accepted facility identity linked

Raeden Detroit Carrier Hotel (615 W Lafayette)

Detroit, MI · Raeden

Reported status: operational

Reported capacity: 0.4 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-14

Review note: Raeden 615 W Lafayette operating carrier hotel; Raeden Michigan 1 is a vendor-directory alias, never a second data center. First-party scope: Operator currently markets active 615 W Lafayette colocation.

Read 2 source findings (2026-10-31)

Raeden 615 W Lafayette operating carrier hotel; Raeden Michigan 1 is a vendor-directory alias, never a second data center. First-party scope: Operator currently markets active 615 W Lafayette colocation. Evidence

Current operator page and linked specification sheet identify available colocation at 615 West Lafayette Boulevard. The PDF filename says 650 but its facility address and page text both say 615; filename is not treated as the address. Street-range point is not rooftop geometry. Evidence

Existing project record

research-final:MI:66528d81cb41454bfac8
Existing facility identity linked

Raeden Michigan 1

Detroit, MI · Raeden

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Raeden 615 W Lafayette operating carrier hotel; Raeden Michigan 1 is a vendor-directory alias, never a second data center. First-party scope: Operator locates actual carrier hotel at 615 W Lafayette; directory site-code requires root linkage.

Read 1 source findings (2026-10-31)

Raeden 615 W Lafayette operating carrier hotel; Raeden Michigan 1 is a vendor-directory alias, never a second data center. First-party scope: Operator locates actual carrier hotel at 615 W Lafayette; directory site-code requires root linkage. Evidence

Existing project record

research-final:MI:6ec399e96d30b36311cb
Accepted facility identity linked

Raeden One Campus Martius (1050 Woodward)

Detroit, MI · Raeden

Reported status: operational

Reported capacity: 3 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-14

Review note: Raeden 1050 Woodward is physically separate from 615 West Lafayette; scalable power is not current operating MW. First-party scope: Operator lists distinct One Campus Martius 1050 Woodward.

Read 2 source findings (2026-10-31)

Raeden 1050 Woodward is physically separate from 615 West Lafayette; scalable power is not current operating MW. First-party scope: Operator lists distinct One Campus Martius 1050 Woodward. Evidence

Current operator page and linked specification sheet identify active colocation at One Campus Martius, 1050 Woodward Avenue, distinct from Lafayette. Scalable power is not equated with operating IT load. Evidence

Existing project record

research-final:MI:b1f6da955a23e0e584fc
Review notes available

Shoemaker Street Data Center Proposal (11031 & 11081 Shoemaker St, Detroit east side)

Detroit, MI · Undisclosed developer (respondent to City of Detroit RFP)

Reported status: cancelled

Source reference: address match (exact): 11081 SHOEMAKER ST, DETROIT, MI, 48213. Census Geocoder; not a verified facility pin.

Original source · 2026-09-21

Review note: Shoemaker Street Data Center Proposal (11031 & 11081 Shoemaker St, Detroit east side) is cancelled in supplied research for Detroit; supplier status, Undisclosed developer (respondent to City of Detroit RFP), coordinates and power are not independently accepted.

research-final:MI:04ba5b8001d6ec323289
Review notes available

Unnamed source-mapped location

Detroit, MI · Quicken Loans

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-02-09

Review note: Unnamed source-mapped location is existing (mapped; status unverified) in supplied research for Detroit; supplier status, Quicken Loans, coordinates and power are not independently accepted.

research-final:MI:019b7923e1ca2f54f818
Review notes available

Verizon Wireless

Detroit, MI · Verizon Communications Inc.

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Verizon Wireless is existing (mapped; status unverified) in supplied research for Detroit; supplier status, Verizon Communications Inc., coordinates and power are not independently accepted.

research-final:MI:679b2ef92a4e98dbdb53
Review notes available

EdgeConneX DET01

Detroit (Oakland County), MI · EdgeConneX

Reported status: operational

Reported capacity: 3.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-07

Review note: EDCDET01 EdgeConneX/TelNet shared interconnect listings need facility/operator and metro-label reconciliation; don't infer three buildings.

research-final:MI:2be341efeae3a8f29cf0
Review notes available

Microsoft Dorr Data Center

Dorr, MI · Microsoft Corporation

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Two Microsoft Dorr names potentially same planning site, pending exact municipal parcel.

research-final:MI:40b7c4015001a6508ffd
Review notes available

Microsoft Dorr Township Data Center

Dorr Township, MI · Microsoft

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

Review note: Two Microsoft Dorr names potentially same planning site, pending exact municipal parcel.

research-final:MI:fc5e415e3e2a51715fa1
Review notes available

Hyperscale Data Dowagiac Campus

Dowagiac, MI · Hyperscale Data, Inc.

Reported status: under construction

Reported capacity: 340 MW planned; 30 MW operational (scope and operation unverified)

Source reference: address match (exact): 415 E PRAIRIE RONDE ST, DOWAGIAC, MI, 49047. Census Geocoder; not a verified facility pin.

Original source · 2026-09-21

Review note: Hyperscale Data Dowagiac campus and expansion may refer to a single multi-phase site; operation and buildout need phase dating.

research-final:MI:c32d9aab11c241713780
Review notes available

Hyperscale Data Michigan Campus

Dowagiac, MI · Hyperscale Data, Inc.; Alliance Cloud Services LLC

Reported status: operational (expansion)

Reported capacity: 340 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Dowagiac. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: Hyperscale Data Dowagiac campus and expansion may refer to a single multi-phase site; operation and buildout need phase dating.

research-final:MI:9eaff179f1044b06f721
Review notes available

Hyperscale Data Michigan Data Center

Dowagiac, MI

Reported status: operational

Reported capacity: 30.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Hyperscale Data Dowagiac campus and expansion may refer to a single multi-phase site; operation and buildout need phase dating.

research-final:MI:78752753cf6df80c9740
Review notes available

Cloverleaf Infrastructure Data Center

Dundee, MI

Reported status: rejected/denied

Exact location not published.

Original source · 2026-06-18

Review note: Cloverleaf Infrastructure Data Center is rejected/denied in supplied research for Dundee; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:5f4776ca7053a615e3c4
Review notes available

Project Ironwood Dundee Data Center

Dundee Township, MI · Cloverleaf Infrastructure

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

Review note: Project Ironwood Dundee Data Center is proposed in supplied research for Dundee Township; supplier status, Cloverleaf Infrastructure, coordinates and power are not independently accepted.

research-final:MI:55debc4b02630b04be92
Review notes available

Grand River Power Company Smithville Bitcoin Mine

Eaton Rapids, MI · Grand River Power Company

Reported status: operational

Exact location not published.

Original source · 2026-09-09

Review note: Grand River Power Company Smithville Bitcoin Mine is operational in supplied research for Eaton Rapids; supplier status, Grand River Power Company, coordinates and power are not independently accepted.

research-final:MI:ce3770faf0ad4edcf72d
Review notes available

Southfield Data Center

Farmington Hills, MI · Metrobloks

Reported status: proposed

Reported capacity: 100.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Metrobloks DTW-D 27252 Inkster proposed site is separate from 365 Data Centers Lahser; Farmington Hills market label must not create another campus.

research-final:MI:7d757d4223c4151c7b36
Review notes available

Buick City Data Center

Flint, MI · Hillwood-Sterling

Reported status: proposed

Exact location not published.

Original source · 2026-09-10

Review note: Buick City Data Center is proposed in supplied research for Flint; supplier status, Hillwood-Sterling, coordinates and power are not independently accepted.

research-final:MI:93dcecb2f1950ef4309f
Review notes available

Otava Mid-Michigan Data Center

Flint, MI · Otava

Reported status: operational

Reported capacity: 1.5 MW (scope and operation unverified)

Approximate locality: address match (exact): 5225 EXCHANGE DR, FLINT, MI, 48507. Census Geocoder; not a verified facility pin.

Original source · 2026-07-18

Review note: OTAVA Mid-Michigan location naming differs between Westland first-party heading and Flint/Genesee supplier notes; exact physical locality unresolved.

research-final:MI:c154b856c5900b1e1f40
Research database | Compute Equity Atlas