Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

Otava Mid-Michigan Data Center (5225 Exchange Drive)

Flint Township, MI · Otava

Reported status: operational

Reported capacity: 1.5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-21

Review note: OTAVA Mid-Michigan location naming differs between Westland first-party heading and Flint/Genesee supplier notes; exact physical locality unresolved.

research-final:MI:16947de5091851165f15
Review notes available

Howell Data Center

Fowlerville, MI · Santec Consulting/Meta

Reported status: cancelled

Exact location not published.

Original source · 2026-06-18

Review note: Howell/Marion/Randee/Stantec application variants may be same dropped or suspended plan; distinguish former plans from current active project.

research-final:MI:2fa5b2a7c38a194ecbd6
Review notes available

Project Cherry Blossom Frenchtown Data Center

Frenchtown Township, MI · Cloverleaf Infrastructure

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

Review note: Project Cherry Blossom Frenchtown Data Center is proposed in supplied research for Frenchtown Township; supplier status, Cloverleaf Infrastructure, coordinates and power are not independently accepted.

research-final:MI:f54563730b26b85d7714
Accepted facility identity linked

Microsoft Gaines Township Site

Gaines Township, MI · Microsoft Corporation

Reported status: proposed

Reported capacity: 6 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Microsoft Caledonia/Gaines/Grand Rapids planning leads overlap by metro but need parcel and sponsor reconciliation; no project count collapse merely by county.

Read 1 source findings (2026-10-31)

Operator March 3, 2026 community-meeting recap presents datacenter project concepts in Gaines Charter Township. Proposed project only; no acquired parcel, construction start or operational campus inferred. Evidence

Existing project record

research-final:MI:fde5cc58040fe8c4467f
Review notes available

Switch Pyramid Campus

Gaines Township, MI · Switch

Reported status: operational

Reported capacity: 320 MW planned; 225 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Switch Pyramid and former SUPERNAP Grand Rapids expansion may be one Gaines Township campus, future 237MW is not measured current IT load.

research-final:MI:bc906560378ca6674572
Review notes available

Raeden Gibraltar McLouth Steel Data Center

Gibraltar, MI · Raeden

Reported status: proposed

Reported capacity: 100 MW (scope and operation unverified)

Source reference: address match (exact): 27800 W JEFFERSON AVE, GIBRALTAR, MI, 48173. Census Geocoder; not a verified facility pin.

Original source · 2026-07-17

Review note: Raeden Gibraltar McLouth Steel Data Center is proposed in supplied research for Gibraltar; supplier status, Raeden, coordinates and power are not independently accepted.

research-final:MI:05a7e745c2c0b9690f10
Review notes available

Corewell Health Bradford Data Center (P0402)

Grand Rapids, MI

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Corewell Health Bradford Data Center (P0402) is existing (epa facility record; status unverified) in supplied research for Grand Rapids; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:2128450fed708e0224b1
Review notes available

Microsoft Grand Rapids Data Center

Grand Rapids, MI · Microsoft Corporation

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: Microsoft Caledonia/Gaines/Grand Rapids planning leads overlap by metro but need parcel and sponsor reconciliation; no project count collapse merely by county.

research-final:MI:2ceac7ec821dcddd2a6a
Review notes available

Switch SUPERNAP Grand Rapids Campus

Grand Rapids, MI · Switch Communications Group LLC

Reported status: operational (expansion)

Reported capacity: 237 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Grand Rapids. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Switch Pyramid and former SUPERNAP Grand Rapids expansion may be one Gaines Township campus, future 237MW is not measured current IT load.

research-final:MI:ad385aa6497713f70ae1
Review notes available

MI Tech - Main Campus

Houghton, MI · Michigan Technological University

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: MI Tech - Main Campus is operational in supplied research for Houghton; supplier status, Michigan Technological University, coordinates and power are not independently accepted.

research-final:MI:10493854e6064e74ed58
Review notes available

Howell Township Data Center

Howell, MI · Randee LLC / Stantec Consulting Michigan Inc.

Reported status: on hold

Exact location not published.

Original source · 2026-09-23

Review note: Howell/Marion/Randee/Stantec application variants may be same dropped or suspended plan; distinguish former plans from current active project.

research-final:MI:5f8664cfe6f7022e12f8
Review notes available

Howell Township Hyperscale Data Center

Howell, MI · Stantec Consulting Michigan / Randee LLC

Reported status: cancelled

Exact location not published.

Original source · 2026-09-09

Review note: Howell/Marion/Randee/Stantec application variants may be same dropped or suspended plan; distinguish former plans from current active project.

research-final:MI:b1e4e63017b3e883a08c
Review notes available

Howell Township Data Center Campus

Howell Township, MI · Stantec Consulting Michigan Inc.; Randee LLC

Reported status: cancelled

Reported capacity: 143 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Howell. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-06-15

Review note: Howell/Marion/Randee/Stantec application variants may be same dropped or suspended plan; distinguish former plans from current active project.

research-final:MI:0d82096fca8954758246
Review notes available

Klever Technology Center Data Center Proposal (27181 Southern Street, Inkster)

Inkster, MI · Klever Technology Center LLC

Reported status: cancelled

Source reference: address match (exact): 27181 SOUTHERN ST, INKSTER, MI, 48141. Census Geocoder; not a verified facility pin.

Original source · 2026-10-24

Review note: Klever Technology Center Data Center Proposal (27181 Southern Street, Inkster) is cancelled in supplied research for Inkster; supplier status, Klever Technology Center LLC, coordinates and power are not independently accepted.

research-final:MI:c181833a94000346fab0
Review notes available

K.I. Sawyer Data Center (SAGE building / Greenfield Campus)

K. I. Sawyer, MI · Aeris Energy (with Telkite Enterprises)

Reported status: proposed

Exact location not published.

Original source · 2026-09-14

Review note: K.I. Sawyer Data Center (SAGE building / Greenfield Campus) is proposed in supplied research for K. I. Sawyer; supplier status, Aeris Energy (with Telkite Enterprises), coordinates and power are not independently accepted.

research-final:MI:71ff474fb24891548115
Review notes available

Aunalytics Kalamazoo Datacenter

Kalamazoo, MI · Aunalytics

Reported status: operational

Exact location not published.

Original source · 2026-09-14

Review note: Aunalytics Kalamazoo Datacenter is operational in supplied research for Kalamazoo; supplier status, Aunalytics, coordinates and power are not independently accepted.

research-final:MI:c244351722717cd498dd
Review notes available

Harbor Farmz Inference Data Center Conversion (2839 Full Circle Drive)

Kalamazoo, MI · Harbor Farmz

Reported status: proposed

Reported capacity: 1.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-10-07

Review note: Harbor Farmz Inference Data Center Conversion (2839 Full Circle Drive) is proposed in supplied research for Kalamazoo; supplier status, Harbor Farmz, coordinates and power are not independently accepted.

research-final:MI:e02649f54593cd3f3523
Review notes available

Kalamazoo County Data Center

Kalamazoo, MI

Reported status: rejected/denied

Exact location not published.

Original source · 2026-06-18

Review note: Kalamazoo County Data Center is rejected/denied in supplied research for Kalamazoo; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:886a093a3937cd38ee49
Review notes available

Kalkaska Go

Kalkaska, MI · Rocklocker LLC

Reported status: cancelled

Exact location not published.

Original source · 2026-09-13

Review note: Three Rocklocker Kalkaska aliases/sponsor claims point toward one cancelled project rather than three facilities.

research-final:MI:2773b34726dddb89fe9e
Review notes available

Rocklocker Kalkaska County Data Center

Kalkaska County, MI · Rocklocker LLC; ReefWorks

Reported status: cancelled

Reported capacity: 1.0 GW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Three Rocklocker Kalkaska aliases/sponsor claims point toward one cancelled project rather than three facilities.

research-final:MI:403b024cada7cebb6771
Review notes available

Rocklocker LLC

Kalkaska Township, MI

Reported status: cancelled

Reported capacity: 1000.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Three Rocklocker Kalkaska aliases/sponsor claims point toward one cancelled project rather than three facilities.

research-final:MI:35d65941d8828089a96e
Review notes available

US Signal MI01 Grand Rapids Data Center

Kentwood, MI · US Signal

Reported status: operational

Reported capacity: 2.2 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: US Signal MI01 Grand Rapids Data Center is operational in supplied research for Kentwood; supplier status, US Signal, coordinates and power are not independently accepted.

research-final:MI:42251ff60586249051d3
Review notes available

ACD.net MetroIX Lansing Data Center (1800 N. Grand River Ave)

Lansing, MI · ACD.net (Advanced Communications & Data)

Reported status: operational

Exact location not published.

Original source · 2026-09-21

Review note: ACD.net MetroIX Lansing Data Center (1800 N. Grand River Ave) is operational in supplied research for Lansing; supplier status, ACD.net (Advanced Communications & Data), coordinates and power are not independently accepted.

research-final:MI:73533b98bdf7d5feb864
Review notes available

Auto Owners Insurance Company Data Center

Lansing, MI

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Auto Owners Insurance Company Data Center is existing (epa facility record; status unverified) in supplied research for Lansing; supplier status, unverified operator, coordinates and power are not independently accepted.

research-final:MI:443c4f0ce4879e4cb775
Review notes available

Deep Green DG06 Lansing Data Center

Lansing, MI · Deep Green; Lansing Board of Water & Light

Reported status: cancelled

Reported capacity: 24 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Deep Green DG06 Lansing Data Center is cancelled in supplied research for Lansing; supplier status, Deep Green; Lansing Board of Water & Light, coordinates and power are not independently accepted.

research-final:MI:49e8ab4753056e8b809b
Review notes available

Liquid Web Lansing DC3 (2703 Ena Drive)

Lansing, MI · Liquid Web

Reported status: operational

Exact location not published.

Original source · 2026-09-21

Review note: Liquid Web Lansing DC3 (2703 Ena Drive) is operational in supplied research for Lansing; supplier status, Liquid Web, coordinates and power are not independently accepted.

research-final:MI:cb182c5d2332699234e0
Review notes available

Lowell Covenant Business Park Data Center

Lowell, MI · Franklin Partners/Microsoft

Reported status: rejected/denied

Exact location not published.

Original source · 2026-06-18

Review note: Franklin Partners/Microsoft Lowell Township multiple planning aliases; rejection of a plan does not automatically cancel other proposals.

research-final:MI:ce50d6804b379907b39e
Review notes available

Microsoft Lowell Charter Township Data Center

Lowell Charter Township, MI · Microsoft; Franklin Partners

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer county centroid for Kent County. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

Review note: Franklin Partners/Microsoft Lowell Township multiple planning aliases; rejection of a plan does not automatically cancel other proposals.

research-final:MI:d06f23ce88fe90cf5a9a
Accepted facility identity linked

Microsoft Lowell Township Data Center

Lowell Township, MI · Microsoft

Reported status: proposed

Exact location not published.

Original source · 2026-10-22

Review note: Franklin Partners/Microsoft Lowell Township multiple planning aliases; rejection of a plan does not automatically cancel other proposals.

Read 1 source findings (2026-10-31)

Operator March 5, 2026 recap explicitly says it is considering land purchase for a datacenter and presented concepts. Proposed project only; no completed acquisition, approval, construction or operation inferred. Evidence

Existing project record

research-final:MI:6716aa205b5f314d46b9
Review notes available

Lyon Township Data Center

Lyon Township, MI

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

Review note: Lyon Township Data Center is proposed in supplied research for Lyon Township; supplier status, unverified operator, coordinates and power are not independently accepted.