Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

Duluth Missabe

Duluth, MN · First Properties

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: Duluth Missabe is supplier-classified operational in Duluth; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:7aaf205f6ba9afb74b96
Review notes available

Centra MSP1 Data Center

Eagan, MN · Centra

Reported status: under construction

Reported capacity: 8.1 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Centra MSP1 proposed/UC project, keep distinct from existing DataBank Eagan MSP2.

research-final:MN:dfb8a615dc880885ccf2
Review notes available

Connect Data Centers – Eagan (powered by Oppidan)

Eagan, MN · Oppidan Investment Company

Reported status: under construction

Exact location not published.

Original source · 2026-09-10

Review note: Connect/Oppidan Eagan construction claim needs parcel to decide if related to Centra MSP1; do not assume one or two centers.

research-final:MN:276cb248e6774d6732fa
Accepted facility identity linked

DataBank East Twin Cities Data Center (MSP2)

Eagan, MN · DataBank

Reported status: operational

Reported capacity: 5 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

Review note: Two DataBank MSP2 Eagan names refer to one existing carrier hotel/data center, no second physical site.

Read 1 source findings (2026-10-31)

Current operator page identifies MSP2 as a multi-tenant carrier hotel at 3255 Neil Armstrong Boulevard. Alternate MSP2 source rows are the same facility. Advertised critical IT capacity does not establish current operating consumption. Evidence

Existing project record

research-final:MN:17ed080f339d0bf2a80c
Existing facility identity linked

DataBank MSP2 — existing data-centre and carrier-hotel operations

Eagan, MN · DataBank

Reported status: operational

Exact location not published.

Original source · 2026-10-01

Review note: Two DataBank MSP2 Eagan names refer to one existing carrier hotel/data center, no second physical site.

Existing project record

research-final:MN:9c5c99577094819f5d02
Review notes available

Eagan 5 Mw Data Center

Eagan, MN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Eagan 5 Mw Data Center is supplier-classified approved/permitted (EPA air-permit record) in Eagan; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:47da2b10cf2e3241ed5a
Review notes available

Usps Itasc Data Center Resili

Eagan, MN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Usps Itasc Data Center Resili is supplier-classified existing (EPA facility record; status unverified) in Eagan; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:3023bcd1a86988aaf651
Review notes available

West Group Data Center

Eagan, MN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: West Group Data Center is supplier-classified existing (EPA facility record; status unverified) in Eagan; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:3afb2ccd46daa5e44f02
Review notes available

232 20th St NW, East Grand Forks

East Grand Forks, MN · Wikstrom Telephone Company, Inc.

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: 232 20th St NW, East Grand Forks is supplier-classified operational in East Grand Forks; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:1c5adb054ba286d35f04
Review notes available

EdgeConneX Minneapolis (EDCMSP01)

Eden Prairie, MN · EdgeConneX Inc.

Reported status: operational

Reported capacity: 2.85 MW planned; 1.35 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

Review note: EdgeConneX Minneapolis (EDCMSP01) is supplier-classified operational in Eden Prairie; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:611f6b19b2d3372b20ea
Accepted facility identity linked

US Signal MN01 Minneapolis (Eden Prairie)

Eden Prairie, MN · US Signal (site registered by OneNeck IT Solutions LLC)

Reported status: operational

Reported capacity: 5.4 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: US Signal MN01 Minneapolis (Eden Prairie) is supplier-classified operational in Eden Prairie; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

Read 1 source findings (2026-10-31)

Current operator confirms operating MN01 in Eden Prairie. Historical OneNeck branding is an alias of this physical facility; no extra facility is created. Evidence

Existing project record

research-final:MN:2bfef14f3261a99bbe03
Review notes available

Visi Data Center / Oneneck It Solutions, Llc

Eden Prairie, MN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Visi Data Center / Oneneck It Solutions, Llc is supplier-classified existing (EPA facility record; status unverified) in Eden Prairie; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:43c62f54278e3eba27b5
Accepted facility identity linked

DataBank West Twin Cities Data Center (MSP1)

Edina, MN · DataBank

Reported status: operational

Reported capacity: 1.35 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

Review note: DataBank West Twin Cities Data Center (MSP1) is supplier-classified operational in Edina; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

Read 1 source findings (2026-10-31)

Current operator verifies operating MSP1 colocation at 7700 France Avenue South with business-hours support. This is distinct from MSP2 Eagan, MSP3 Brooklyn Park, and the existing 511 Building carrier hotel. Evidence

Existing project record

research-final:MN:932d5e89343c66401553
Review notes available

Elk River Data Center (Elk River Capital / Swervo Development)

Elk River, MN · Elk River Capital LLC (Swervo Development Corp affiliate)

Reported status: cancelled

Reported capacity: 33 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-18

Review note: Elk River Capital/Swervo Industrial Blvd conflicting cancelled/proposed labels concern one sponsor proposal until municipal status refresh.

research-final:MN:2ba7be7f620f7a48f5b3
Review notes available

Elk River Industrial Boulevard Data Center

Elk River, MN · Elk River Capital LLC; Swervo Development Corp.; Michael Margulies

Reported status: proposed

Reported capacity: 33 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Elk River Capital/Swervo Industrial Blvd conflicting cancelled/proposed labels concern one sponsor proposal until municipal status refresh.

research-final:MN:d8e675d7d536c9c69909
Review notes available

Target Technology Data Ctr 2

Elk River, MN

Reported status: existing (EPA facility record; status unverified)

Exact location not published.

Original source · 2026-10-28

Review note: Target Technology Data Ctr 2 is supplier-classified existing (EPA facility record; status unverified) in Elk River; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:84c89ee91a1224e2b084
Review notes available

United Health Group Next Technology Center It

Elk River, MN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: United Health Group Next Technology Center It is supplier-classified approved/permitted (EPA air-permit record) in Elk River; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:1f433d02214fad899f69
Review notes available

Archer Datacenters Faribault Campus

Faribault, MN · Archer Datacenters

Reported status: proposed

Reported capacity: 120 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Archer Faribault campus and generic Faribault proposal possibly same project, require sponsor and zoning site parcel.

research-final:MN:a0496b06b35390b0b605
Review notes available

Faribault Data Center

Faribault, MN

Reported status: proposed

Exact location not published.

Original source · 2026-06-17

Review note: Archer Faribault campus and generic Faribault proposal possibly same project, require sponsor and zoning site parcel.

research-final:MN:91daae77e7ba5d98e81a
Review notes available

Farmington Technology Park

Farmington, MN · Tract

Reported status: approved/permitted

Reported capacity: 708 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-09-23

Review note: TRACT Farmington Technology Park phases and PUD are one planned industrial campus; approved PUD/sitework is not four constructed centers or IT MW.

research-final:MN:6cdf280ebce9e072d92f
Review notes available

Farmington Technology Park — proposed Tract data-center campus (PUD-1, Ordinance 2024-12; 1st Addition Lot 1 and future 2nd Addition)

Farmington, MN · MNLCO Farmington Two, LLC; MNLCO Farmington, LLC

Reported status: proposed

Exact location not published.

Original source · 2026-09-16

Review note: TRACT Farmington Technology Park phases and PUD are one planned industrial campus; approved PUD/sitework is not four constructed centers or IT MW.

research-final:MN:7826b521ad3cde42559c
Review notes available

TRACT Data Center

Farmington, MN

Reported status: proposed

Exact location not published.

Original source · 2026-06-18

Review note: TRACT Farmington Technology Park phases and PUD are one planned industrial campus; approved PUD/sitework is not four constructed centers or IT MW.

research-final:MN:f7bf1a895b4c9777cf7e
Review notes available

Tract Farmington Technology Park

Farmington, MN · Tract

Reported status: under construction

Reported capacity: 714 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: TRACT Farmington Technology Park phases and PUD are one planned industrial campus; approved PUD/sitework is not four constructed centers or IT MW.

research-final:MN:923b5398f3ac84c70005
Review notes available

Revolve Labs Glencoe

Glencoe, MN · Revolve Labs

Reported status: operational

Reported capacity: 20 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-24

Review note: Revolve Labs Glencoe operating claim is not proof that abandoned Moose Lake or Windom projects are online.

research-final:MN:17e47c7f45632e503d38
Review notes available

Hampton Data Center

Hampton, MN · Oppidan Investment Co.; Connect Data Centers

Reported status: proposed

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Hampton. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: Hampton Data Center is supplier-classified proposed in Hampton; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:496fd09e18059c2fecc4
Review notes available

Google Hermantown Data Center

Hermantown, MN · Google

Reported status: proposed

Exact location not published.

Original source · 2026-09-24

Review note: Hermantown Project Loon rejected proposal conflicts with Google current proposal names; official reapplication and parcel evidence needed.

research-final:MN:696d0a3df2aaadf4d470
Review notes available

Hermantown Data Center

Hermantown, MN · Google; Harmony Group LLC; Mortenson

Reported status: proposed

Reported capacity: 600 MW (scope and operation unverified)

Approximate locality: approximate: Census 2024 Gazetteer place centroid for Hermantown. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-19

Review note: Hermantown Project Loon rejected proposal conflicts with Google current proposal names; official reapplication and parcel evidence needed.

research-final:MN:a90667a3ff44b3819c70
Review notes available

Project Loon

Hermantown, MN · Google LLC

Reported status: rejected/denied

Exact location not published.

Original source · 2026-06-18

Review note: Hermantown Project Loon rejected proposal conflicts with Google current proposal names; official reapplication and parcel evidence needed.

research-final:MN:1bdd10a6fe8e26592ab1
Review notes available

Fis Global

Hopkins, MN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Fis Global is supplier-classified approved/permitted (EPA air-permit record) in Hopkins; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:3b24f8ed4c9868268a0a
Review notes available

AAIM Data Centers — Hutchinson (Minnesota 2 Energy Park)

Hutchinson, MN · B-MN Data Centers Inc. (d/b/a AAIM DataCenters)

Reported status: approved/permitted

Reported capacity: 20 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

Review note: AAIM Hutchinson Minnesota 2 regulatory permit alone is not operating status nor the same building as Blue Earth.

research-final:MN:b6f17aeaaf8e915ff730
Research database | Compute Equity Atlas