Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.
Review notes availableScannell Technology Park
Monticello, MN · Scannell Properties, LLC
Reported status: proposed
Reported capacity: 150 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Scannell Technology Park is separate sponsor from Monticello Tech; no shared-campus collapse solely by township.
research-final:MN:3469e747164299c34d61Review notes available702 Communications - Moorhead, MN
Moorhead, MN · 702 Communications
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: 702 Communications - Moorhead, MN is supplier-classified operational in Moorhead; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:282c2cf01d4f484b49b3Review notes availableRevolve Labs Moose Lake (withdrawn)
Moose Lake, MN · Revolve Labs
Reported status: cancelled
Exact location not published.
Original source · 2026-08-08
Review note: Revolve Labs Moose Lake withdrawn project is separate from Glencoe.
research-final:MN:8d9492aa6696a5611315Review notes availableAAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park)
Mountain Lake, MN · C-MN Data Centers Inc. / AAIM Data Centers
Reported status: approved/permitted
Reported capacity: 10 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-13
Review note: AAIM Mountain Lake Minnesota 3 regulator/power filing is separate from other AAIM sites, not verified operational.
research-final:MN:74d831719868e50a83d8Review notes availableNobles County Powered Data Park
Nobles County, MN · Geronimo Power
Reported status: cancelled
Reported capacity: 400 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-18
Review note: Nobles County Powered Data Park is supplier-classified cancelled in Nobles County; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:4cc3d7011b9cb79d5039Review notes availableNorth Mankato Data Center
North Mankato, MN · Undisclosed
Reported status: cancelled
Approximate locality: approximate: Census 2024 Gazetteer place centroid for North Mankato. Census 2024 Gazetteer centroid; not a verified facility pin.
Original source · 2026-07-18
Review note: North Mankato Data Center is supplier-classified cancelled in North Mankato; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:d1ef70b68815396b8f0dReview notes availableJaguar Communications
Owatonna, MN · Jaguar Communications
Reported status: operational
Exact location not published.
Original source · 2025-09-26
Review note: Jaguar Communications is supplier-classified operational in Owatonna; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:0aa5693f30325b36a087Review notes availablePine Island Data Center (Project Skyway)
Pine Island, MN · Google; Ryan Companies
Reported status: proposed
Exact location not published.
Original source · 2026-06-15
Review note: Google Pine Island Project Skyway is a proposed site, not built and not the Hermantown Project Loon site.
research-final:MN:f24c97c49b44a36ad696Review notes availableUhg-It Plymouth
Plymouth, MN
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Uhg-It Plymouth is supplier-classified approved/permitted (EPA air-permit record) in Plymouth; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:386ea8c18beba64c63e4Review notes availableGeronimo Power Data Center
Reading, MN
Reported status: rejected/denied
Reported capacity: 400.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: Geronimo Power Data Center is supplier-classified rejected/denied in Reading; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:30db800277068a556aecReview notes availableEpic / Mayo Data Center
Rochester, MN
Reported status: existing (mapped + EPA facility record)
Exact location not published.
Original source · 2026-06-14
Review note: Epic / Mayo Data Center is supplier-classified existing (mapped + EPA facility record) in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:5cbf2b4c5d936949233fReview notes availableNP Rochester
Rochester, MN · Neutral Path Communications, LLC
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: NP Rochester is supplier-classified operational in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:3999566ada2b3d73259dReview notes availableSFN MN-Rochester
Rochester, MN · South Front Networks
Reported status: operational
Exact location not published.
Original source · 2026-06-17
Review note: SFN MN-Rochester is supplier-classified operational in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:b489b4f7a3f846069444Review notes availableJimnist Llc
Rosemount, MN
Reported status: approved/permitted (EPA air-permit record)
Regulatory reference: FRS facility point (stated accuracy 180 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Jimnist Llc is supplier-classified approved/permitted (EPA air-permit record) in Rosemount; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:8c7eb2d7d4fd9d002f4aReview notes availableMeta Rosemount Data Center
Rosemount, MN · Meta Platforms Inc.
Reported status: under construction
Reported capacity: 150 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-15
Review note: Meta Rosemount construction signal; no direct site MW or completion inferred from announcements.
Read 1 source findings (2026-10-31)
Meta Rosemount construction signal; no direct site MW or completion inferred from announcements. Evidence
research-final:MN:ca8374c0087650b308f0Review notes availableTract Rosemount Technology Park (withdrawn)
Rosemount, MN · Tract
Reported status: cancelled
Exact location not published.
Original source · 2026-10-13
Review note: TRACT Rosemount withdrawn proposal distinct sponsor from Meta active Rosemount site.
research-final:MN:581755660db41ebb35adExisting facility identity linkedH5 Minneapolis
Saint Paul, MN · H5 Data Centers
Reported status: operational
Reported capacity: 8.00 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-06-18
Review note: H5 Minneapolis market label and H5 St Paul describe St Paul site candidate; avoid two physical buildings without separate street evidence.
Existing project record
research-final:MN:255e5404ac545c71b917Accepted facility identity linkedCentersquare Shakopee (MSP1 Campus)
Shakopee, MN · Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)
Reported status: operational
Reported capacity: 19.1 MW operational (scope and operation unverified)
Exact location not published.
Original source · 2026-09-18
Review note: Centersquare MSP1 Shakopee accepted operator site, keep distinct from Shakopee Capital planning proposal.
Read 2 source findings (2026-10-31)
Centersquare MSP1 Shakopee accepted operator site, keep distinct from Shakopee Capital planning proposal. Evidence
Current 2026 operator specification sheet establishes MSP1 colocation at 4450 Dean Lakes Boulevard. Census matches the published street and ZIP. Utility and UPS ratings are not represented as operating IT load. Evidence
Existing project record
research-final:MN:20c5678678bc2864a926Review notes availableShakopee Capital Dean Lakes Data Center
Shakopee, MN · Shakopee Capital LLC
Reported status: proposed
Reported capacity: 50 MW (scope and operation unverified)
Exact location not published.
Original source · 2026-07-17
Review note: Shakopee Capital Dean Lakes Data Center is supplier-classified proposed in Shakopee; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:8f3b76aff95386bf12c7Review notes availableShoreview Data Center
Shoreview, MN
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Shoreview Data Center is supplier-classified existing (EPA facility record; status unverified) in Shoreview; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:108ba68350e573d386faReview notes availableProject Bedrock — 54,070 sq ft data center building (Major Site Plan, Resolution 2026-209, 5890 Carmen Avenue)
South St. Paul, MN · FIG Ion Timber, LLC
Reported status: approved/permitted
Exact location not published.
Original source · 2026-09-28
Review note: South St Paul 5890 Carmen Ave FIG Ion Timber Project Bedrock approved plan is not an operating center and is unrelated to Arizona Novva Borealis or Raeden Bedrock partnership.
research-final:MN:89b9a9e69b38d54918e9Review notes availableVaultas St. Cloud
St. Cloud, MN · Vaultas
Reported status: proposed
Reported capacity: 0.6 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-24
Review note: Vaultas St. Cloud is supplier-classified proposed in St. Cloud; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:b5ca56347f47414f91cfAccepted facility identity linkedH5 Data Centers St. Paul
St. Paul, MN · H5 Data Centers
Reported status: operational
Source reference: address match (exact): 1125 ENERGY PARK DR, SAINT PAUL, MN, 55108. Census Geocoder; not a verified facility pin.
Original source · 2026-09-18
Review note: H5 Minneapolis market label and H5 St Paul describe St Paul site candidate; avoid two physical buildings without separate street evidence.
Read 1 source findings (2026-10-31)
Current operator page advertises active colocation at Suite 100, 1125 Energy Park Drive. Minneapolis is its market label; the physical city is St Paul. The map point is a building address-range match and does not establish sole building ownership or suite geometry. Evidence
Existing project record
research-final:MN:80c26b36c9cf500b60fbReview notes availableRevolve Labs Windom (withdrawn)
Windom, MN · Revolve Labs
Reported status: cancelled
Exact location not published.
Original source · 2026-08-08
Review note: Revolve Labs Windom withdrawn project is separate from Glencoe.
research-final:MN:74bf984cd0f33c99a7dcReview notes availableMedtronic Data Center
Woodbury, MN
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: Medtronic Data Center is supplier-classified existing (EPA facility record; status unverified) in Woodbury; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:b42272848deb48c7ee95Review notes availableNobles County Powered Data Park
Worthington, MN · Geronimo Power (Brookfield Asset Management subsidiary)
Reported status: proposed
Reported capacity: 400 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-10-22
Review note: Nobles County Powered Data Park is supplier-classified proposed in Worthington; current distinct physical building, operating IT load and rights-clean geography not independently accepted.
research-final:MN:fec0a5297c69c4623883Review notes availableWhite Cloud Acres
Barnard, MO · Scale Microgrids
Reported status: proposed
Reported capacity: 600 MW planned (scope and operation unverified)
Exact location not published.
Original source · 2026-08-24
Review note: one proposed Nodaway County project; proposed capacity not operating MW
research-final:MO:a8ad3db0c676d1ea6d21Review notes availableOppidan Data Center
Berkeley, MO
Reported status: existing (EPA facility record; status unverified)
Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.
Original source · 2026-10-28
Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.
research-final:MO:0dc1c868ed41313360dfReview notes availableEdged Kansas City — data-center building (final certificate of occupancy CICO-2026-00896, 3500 N Arlington Ave)
Birmingham, MO · Edged US
Reported status: operational
Exact location not published.
Original source · 2026-09-04
Review note: same Edged facility address candidate; certificate and operator evidence must resolve exact site
research-final:MO:feb441e82091fd167b04Review notes availableCarfax
Columbia, MO
Reported status: existing (mapped; status unverified)
Exact location not published.
Original source · 2026-06-14
Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.
research-final:MO:5069228d4833ce10a264