Compute Equity Atlas
State research database

All supplied research, searchable

6,466 source records across 50 states and Washington, DC. Records include proposals, existing facilities, regulatory references, expansions and possible duplicates. Reported status and capacity are source claims, not certified current operation or measured demand.

National map

6,466 matching source records

Snapshot: 2026-10-28. Review the linked evidence before relying on a claim. Related records and expansions must not be counted as additional facilities.

Review notes available

Scannell Technology Park

Monticello, MN · Scannell Properties, LLC

Reported status: proposed

Reported capacity: 150 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Scannell Technology Park is separate sponsor from Monticello Tech; no shared-campus collapse solely by township.

research-final:MN:3469e747164299c34d61
Review notes available

702 Communications - Moorhead, MN

Moorhead, MN · 702 Communications

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: 702 Communications - Moorhead, MN is supplier-classified operational in Moorhead; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:282c2cf01d4f484b49b3
Review notes available

Revolve Labs Moose Lake (withdrawn)

Moose Lake, MN · Revolve Labs

Reported status: cancelled

Exact location not published.

Original source · 2026-08-08

Review note: Revolve Labs Moose Lake withdrawn project is separate from Glencoe.

research-final:MN:8d9492aa6696a5611315
Review notes available

AAIM Data Centers — Mountain Lake (Minnesota 3 Energy Park)

Mountain Lake, MN · C-MN Data Centers Inc. / AAIM Data Centers

Reported status: approved/permitted

Reported capacity: 10 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-13

Review note: AAIM Mountain Lake Minnesota 3 regulator/power filing is separate from other AAIM sites, not verified operational.

research-final:MN:74d831719868e50a83d8
Review notes available

Nobles County Powered Data Park

Nobles County, MN · Geronimo Power

Reported status: cancelled

Reported capacity: 400 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-18

Review note: Nobles County Powered Data Park is supplier-classified cancelled in Nobles County; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:4cc3d7011b9cb79d5039
Review notes available

North Mankato Data Center

North Mankato, MN · Undisclosed

Reported status: cancelled

Approximate locality: approximate: Census 2024 Gazetteer place centroid for North Mankato. Census 2024 Gazetteer centroid; not a verified facility pin.

Original source · 2026-07-18

Review note: North Mankato Data Center is supplier-classified cancelled in North Mankato; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:d1ef70b68815396b8f0d
Review notes available

Jaguar Communications

Owatonna, MN · Jaguar Communications

Reported status: operational

Exact location not published.

Original source · 2025-09-26

Review note: Jaguar Communications is supplier-classified operational in Owatonna; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:0aa5693f30325b36a087
Review notes available

Pine Island Data Center (Project Skyway)

Pine Island, MN · Google; Ryan Companies

Reported status: proposed

Exact location not published.

Original source · 2026-06-15

Review note: Google Pine Island Project Skyway is a proposed site, not built and not the Hermantown Project Loon site.

research-final:MN:f24c97c49b44a36ad696
Review notes available

Uhg-It Plymouth

Plymouth, MN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Uhg-It Plymouth is supplier-classified approved/permitted (EPA air-permit record) in Plymouth; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:386ea8c18beba64c63e4
Review notes available

Geronimo Power Data Center

Reading, MN

Reported status: rejected/denied

Reported capacity: 400.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: Geronimo Power Data Center is supplier-classified rejected/denied in Reading; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:30db800277068a556aec
Review notes available

Epic / Mayo Data Center

Rochester, MN

Reported status: existing (mapped + EPA facility record)

Exact location not published.

Original source · 2026-06-14

Review note: Epic / Mayo Data Center is supplier-classified existing (mapped + EPA facility record) in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:5cbf2b4c5d936949233f
Review notes available

NP Rochester

Rochester, MN · Neutral Path Communications, LLC

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: NP Rochester is supplier-classified operational in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:3999566ada2b3d73259d
Review notes available

SFN MN-Rochester

Rochester, MN · South Front Networks

Reported status: operational

Exact location not published.

Original source · 2026-06-17

Review note: SFN MN-Rochester is supplier-classified operational in Rochester; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:b489b4f7a3f846069444
Review notes available

Jimnist Llc

Rosemount, MN

Reported status: approved/permitted (EPA air-permit record)

Regulatory reference: FRS facility point (stated accuracy 180 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Jimnist Llc is supplier-classified approved/permitted (EPA air-permit record) in Rosemount; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:8c7eb2d7d4fd9d002f4a
Review notes available

Meta Rosemount Data Center

Rosemount, MN · Meta Platforms Inc.

Reported status: under construction

Reported capacity: 150 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-15

Review note: Meta Rosemount construction signal; no direct site MW or completion inferred from announcements.

Read 1 source findings (2026-10-31)

Meta Rosemount construction signal; no direct site MW or completion inferred from announcements. Evidence

research-final:MN:ca8374c0087650b308f0
Review notes available

Tract Rosemount Technology Park (withdrawn)

Rosemount, MN · Tract

Reported status: cancelled

Exact location not published.

Original source · 2026-10-13

Review note: TRACT Rosemount withdrawn proposal distinct sponsor from Meta active Rosemount site.

research-final:MN:581755660db41ebb35ad
Existing facility identity linked

H5 Minneapolis

Saint Paul, MN · H5 Data Centers

Reported status: operational

Reported capacity: 8.00 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-06-18

Review note: H5 Minneapolis market label and H5 St Paul describe St Paul site candidate; avoid two physical buildings without separate street evidence.

Existing project record

research-final:MN:255e5404ac545c71b917
Accepted facility identity linked

Centersquare Shakopee (MSP1 Campus)

Shakopee, MN · Centersquare (fka Cyxtera / Evoque; site originally built by Compass Datacenters)

Reported status: operational

Reported capacity: 19.1 MW operational (scope and operation unverified)

Exact location not published.

Original source · 2026-09-18

Review note: Centersquare MSP1 Shakopee accepted operator site, keep distinct from Shakopee Capital planning proposal.

Read 2 source findings (2026-10-31)

Centersquare MSP1 Shakopee accepted operator site, keep distinct from Shakopee Capital planning proposal. Evidence

Current 2026 operator specification sheet establishes MSP1 colocation at 4450 Dean Lakes Boulevard. Census matches the published street and ZIP. Utility and UPS ratings are not represented as operating IT load. Evidence

Existing project record

research-final:MN:20c5678678bc2864a926
Review notes available

Shakopee Capital Dean Lakes Data Center

Shakopee, MN · Shakopee Capital LLC

Reported status: proposed

Reported capacity: 50 MW (scope and operation unverified)

Exact location not published.

Original source · 2026-07-17

Review note: Shakopee Capital Dean Lakes Data Center is supplier-classified proposed in Shakopee; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:8f3b76aff95386bf12c7
Review notes available

Shoreview Data Center

Shoreview, MN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Shoreview Data Center is supplier-classified existing (EPA facility record; status unverified) in Shoreview; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:108ba68350e573d386fa
Review notes available

Project Bedrock — 54,070 sq ft data center building (Major Site Plan, Resolution 2026-209, 5890 Carmen Avenue)

South St. Paul, MN · FIG Ion Timber, LLC

Reported status: approved/permitted

Exact location not published.

Original source · 2026-09-28

Review note: South St Paul 5890 Carmen Ave FIG Ion Timber Project Bedrock approved plan is not an operating center and is unrelated to Arizona Novva Borealis or Raeden Bedrock partnership.

research-final:MN:89b9a9e69b38d54918e9
Review notes available

Vaultas St. Cloud

St. Cloud, MN · Vaultas

Reported status: proposed

Reported capacity: 0.6 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-24

Review note: Vaultas St. Cloud is supplier-classified proposed in St. Cloud; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:b5ca56347f47414f91cf
Accepted facility identity linked

H5 Data Centers St. Paul

St. Paul, MN · H5 Data Centers

Reported status: operational

Source reference: address match (exact): 1125 ENERGY PARK DR, SAINT PAUL, MN, 55108. Census Geocoder; not a verified facility pin.

Original source · 2026-09-18

Review note: H5 Minneapolis market label and H5 St Paul describe St Paul site candidate; avoid two physical buildings without separate street evidence.

Read 1 source findings (2026-10-31)

Current operator page advertises active colocation at Suite 100, 1125 Energy Park Drive. Minneapolis is its market label; the physical city is St Paul. The map point is a building address-range match and does not establish sole building ownership or suite geometry. Evidence

Existing project record

research-final:MN:80c26b36c9cf500b60fb
Review notes available

Revolve Labs Windom (withdrawn)

Windom, MN · Revolve Labs

Reported status: cancelled

Exact location not published.

Original source · 2026-08-08

Review note: Revolve Labs Windom withdrawn project is separate from Glencoe.

research-final:MN:74bf984cd0f33c99a7dc
Review notes available

Medtronic Data Center

Woodbury, MN

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 30 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: Medtronic Data Center is supplier-classified existing (EPA facility record; status unverified) in Woodbury; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:b42272848deb48c7ee95
Review notes available

Nobles County Powered Data Park

Worthington, MN · Geronimo Power (Brookfield Asset Management subsidiary)

Reported status: proposed

Reported capacity: 400 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-10-22

Review note: Nobles County Powered Data Park is supplier-classified proposed in Worthington; current distinct physical building, operating IT load and rights-clean geography not independently accepted.

research-final:MN:fec0a5297c69c4623883
Review notes available

White Cloud Acres

Barnard, MO · Scale Microgrids

Reported status: proposed

Reported capacity: 600 MW planned (scope and operation unverified)

Exact location not published.

Original source · 2026-08-24

Review note: one proposed Nodaway County project; proposed capacity not operating MW

research-final:MO:a8ad3db0c676d1ea6d21
Review notes available

Oppidan Data Center

Berkeley, MO

Reported status: existing (EPA facility record; status unverified)

Regulatory reference: FRS facility point (stated accuracy 50 m). EPA FRS/ECHO; not a verified facility pin.

Original source · 2026-10-28

Review note: EPA facility/permit evidence cannot prove an operating data-center identity or IT power; retain source as research only.

research-final:MO:0dc1c868ed41313360df
Review notes available

Edged Kansas City — data-center building (final certificate of occupancy CICO-2026-00896, 3500 N Arlington Ave)

Birmingham, MO · Edged US

Reported status: operational

Exact location not published.

Original source · 2026-09-04

Review note: same Edged facility address candidate; certificate and operator evidence must resolve exact site

research-final:MO:feb441e82091fd167b04
Review notes available

Carfax

Columbia, MO

Reported status: existing (mapped; status unverified)

Exact location not published.

Original source · 2026-06-14

Review note: Independent address, operator, physical building and rights provenance needed before canonical identity or geometry promotion.

research-final:MO:5069228d4833ce10a264
Research database | Compute Equity Atlas